← Back
Predominantly retail with other uses
33-54 PRINCE STREET
QUEENS · BIN 4111903
💬 Discuss this project
1970Year Built
2Stories
K4Building Class
M2-1Zoning
7,628 sfGross Floor Area
2Units
3 Open Violations 1 unresolved · 2 paperwork only ▸
Predominantly retail with other uses · 6,528 sf lot · 1.17 FAR built · Flood zone X
Locations of Work
Architecture
Mezzanine1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GOLDEN PRINCE CORP303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS310/27/2023
JOADEM CORPORATION109/07/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J. CALIENDO R.A., P.C.303/21/2026
PLUMBINGTECH203/21/2026
GERALD J CALIENDO R A P C303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DI FIORE & SONS CUSTOM WOGeneral Contractor403/21/2026
BYPASS MECHANICAL CORPPlumbing107/08/2026
D.D.S. MECH PBG&HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WORLD DESIGN ARCHITECTURE9323210/27/2023
Building Lifecycle
All (53)Filed (4)Permit Issued (4)Signed Off (3)Violation (12)Inspection (8)Objection (16)Special Inspection (6)
08/07/2025
Signed off — Alteration
HEREWITH FILING ALTERATION TO LEGALIZE EXISTING PLUMBING FIXTURES ON MEZZANINE LEVEL TO COMPLY WITH VIOLATION #34894453J, 35455327K, 35590581H .NO CHANGE IN USE,OCCUPANCY, OR EGRESS.
Q00672973-I1
08/07/2025
Signed off — Alteration
Q00667937-S1
08/07/2025
Signed off — Alteration
Q00667937-I1
07/14/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/14/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/30/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/30/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/30/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/26/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/14/2024
Permit issued — Plumbing
Q00672973-I1-PL
07/25/2024
Permit issued — General Construction
Q00667937-S1-GC
03/06/2024
Permit issued — Plumbing
Q00672973-I1-PL
10/31/2023
Objection resolved — Addressed
10/30/2023
Objection raised — Other
10/27/2023
Filed — Alteration
HEREWITH FILING ALTERATION TO LEGALIZE EXISTING PLUMBING FIXTURES ON MEZZANINE LEVEL TO COMPLY WITH VIOLATION #34894453J, 35455327K, 35590581H .NO CHANGE IN USE,OCCUPANCY, OR EGRESS.
Q00672973-I1
10/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
10/23/2023
Special inspection requirement — Energy Code Compliance Inspections
William Alicea
08/15/2023
Objection resolved — Addressed
08/10/2023
Objection raised — Fire_Protection
08/01/2023
Filed — Alteration
Q00667937-S1
04/05/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/20/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/04/2022
Permit issued — General Construction
Q00667937-I1-GC
02/18/2022
Objection raised — Scope
02/18/2022
Objection resolved — Addressed
02/07/2022
Objection raised — Accessibility
02/07/2022
Objection resolved — Addressed
02/07/2022
Objection raised — Fire_Protection
02/07/2022
Objection resolved — Addressed
02/07/2022
Objection raised — Scope
02/07/2022
Objection resolved — Addressed
02/07/2022
Objection raised — Scope
02/07/2022
Objection resolved — Addressed
02/07/2022
Objection raised — Fire_Protection
02/07/2022
Objection resolved — Addressed
02/02/2022
Filed — Alteration
Q00667937-I1
02/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
02/02/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
02/02/2022
Special inspection requirement — Energy Code Compliance Inspections
William Alicea
02/02/2022
Special inspection requirement — Fire-Resistance Rated Construction
William Alicea
12/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/08/2021
Violation issued (ECB, closed)
Construction
09/08/2021
Violation issued (ECB, closed)
Zoning
09/07/2021
Filed — Alteration
proposed installation of a pre-fabcurated auto paint spray booth, with mechanical exhaust through the roof in existing auto body shop
Q00569243-I1
11/26/2019
Violation issued (ECB, open)
Construction
11/26/2019
Violation issued (ECB, closed)
Zoning
11/26/2019
Violation issued (ECB, open)
Construction
07/19/2018
Violation issued (ECB, closed)
Construction
07/19/2018
Violation issued (ECB, closed)
Construction
07/19/2018
Violation issued (ECB, closed)
Zoning
05/04/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/08/2011
Violation issued (ECB, closed)
Construction
08/08/1972
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP10/14/2024
DOB NOWGeneral ConstructionSigned-offDI FIORE & SONS CUSTOM WO07/25/2024
DOB NOWPlumbingSigned-offBYPASS MECHANICAL CORP03/06/2024
DOB NOWGeneral ConstructionSigned-offDI FIORE & SONS CUSTOM WO11/04/2022
BISPLISSUEDAVON PLBG & HTG INC12/21/1999
BISOTISSUEDYOON DAM CONSTRUCTION12/10/1999
BISOTISSUEDF & W MECHANICAL CO06/22/1990
1 project · most recent 09/07/2021
Gas
FiledStatusContractorScope
09/07/2021——Gas
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/14/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/14/2025Fail-Final General Construction Non-Directive 14FailView ↗
01/30/2025Fail-Final General Construction Non-Directive 14FailView ↗
12/30/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/30/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/05/2023Fail-Final General Construction Non-Directive 14FailView ↗
03/20/2023Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
10/23/2023Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
10/23/2023Energy Code Compliance InspectionsWilliam Aliceaprogress
02/02/2022Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
02/02/2022Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
02/02/2022Energy Code Compliance InspectionsWilliam Aliceaprogress
02/02/2022Fire-Resistance Rated ConstructionWilliam Aliceaprogress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026Q00569243-I1Request digital key ↗
08/26/2026Q00667937-S1Request digital key ↗
08/23/2026Q00672973-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026Q00667937-S1Open ↗
08/26/2026Q00667937-I1Open ↗
08/13/2026Q00569243-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q00672973-I1Open ↗
09/01/2026Q00667937-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q00672973-I1Open ↗
09/01/2026Q00667937-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026Q00667937-S1Open ↗
08/15/2026Q00667937-I1Open ↗
08/13/2026Q00672973-I1Open ↗
Showing 3 of 4 on file for this type