← Back
Two family converted from one family
33 HOWARD PLACE
BROOKLYN · BIN 3027227
💬 Discuss this project
1915Year Built
2Stories
B3Building Class
R5BZoning
1,418 sfGross Floor Area
2Units
Two family converted from one family · 1,500 sf lot · 0.95 FAR built · Flood zone X
Locations of Work
Architecture
Basement1p · 1 filing · 13 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAREK TRESKO ARCHITECT, LLC405/07/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAREK TRESKO ARCHITECT, L1086405/07/2026
Building Lifecycle
All (46)Filed (4)Objection (36)Special Inspection (6)
07/20/2026
Objection resolved — Resolved
07/15/2026
Objection raised — Scope
07/15/2026
Objection raised — Other
07/15/2026
Objection resolved — Resolved
07/01/2026
Objection resolved — Addressed
07/01/2026
Objection resolved — Addressed
07/01/2026
Objection resolved — Addressed
07/01/2026
Objection resolved — Addressed
07/01/2026
Objection resolved — Resolved
07/01/2026
Objection resolved — Resolved
07/01/2026
Objection resolved — Resolved
07/01/2026
Objection resolved — Resolved
07/01/2026
Objection resolved — Resolved
07/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/10/2026
Objection resolved — Resolved
06/10/2026
Objection resolved — Resolved
06/10/2026
Objection resolved — Resolved
06/10/2026
Objection resolved — Resolved
06/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jarek Tresko
06/08/2026
Objection resolved — Resolved
06/08/2026
Objection resolved — Addressed
05/26/2026
Objection raised — Other
05/26/2026
Objection raised — Other
05/22/2026
Objection raised — Zoning
05/22/2026
Objection raised — Scope
05/22/2026
Objection raised — Inspections
05/22/2026
Objection raised — Zoning
05/22/2026
Objection raised — Scope
05/22/2026
Objection raised — Scope
05/22/2026
Objection raised — Scope
05/22/2026
Objection raised — Admin
05/21/2026
Objection raised — Cost
05/21/2026
Objection resolved — Resolved
05/21/2026
Objection raised — Other
05/21/2026
Objection raised — Inspections
05/21/2026
Objection raised — Other
05/21/2026
Objection raised — Zoning
05/21/2026
Objection raised — Other
05/07/2026
Filed — Alteration CO
interior and exterior renovation to amend C of O to change from 2 family to 1 family. Architectural/ Construction work only.
B01389365-I1
05/07/2026
Filed — Alteration
Plumbing work in existing townhouse, basement, 1st and 2nd floor only.
B01387782-I1
05/07/2026
Filed — Alteration
Mechanical work in existing townhouse basement, 1st and 2nd floor only.
B01387791-I1
05/07/2026
Filed — Alteration CO
interior and exterior renovation to amend C of O to change from 2 family to 1 family. Architectural/ Construction work only.
B01389365-S1
04/20/2026
Special inspection requirement — Subgrade Inspections
04/17/2026
Special inspection requirement — Structural Steel - Details
Jarek Tresko
04/17/2026
Special inspection requirement — Structural Steel - High Strength Bolting
04/17/2026
Special inspection requirement — Final
Jarek Tresko
Nothing on file for this building.
1 project · most recent 05/07/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/07/2026——Air Conditioning Systems
Cooling
Mitsubishi Electric MsZ-Gl09NA 9,000 CFM · Ahu ×6
MXZ-5D36NL 3 tons · Vrf Outdoor ×2
MsZ-G09NA 9,000 CFM · Fan Coil Indoor ×2
1 project · most recent 05/07/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/07/2026——Gas, Water/Sanitary
1 project · most recent 05/07/2026
Steel
FiledStatusContractorScope
05/07/2026——Steel
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
07/01/2026Structural Stability – Alterations of existing buildings—special
06/10/2026Fire-Resistant Penetrations and JointsJarek Treskospecial
04/20/2026Subgrade Inspections—special
04/17/2026Structural Steel - DetailsJarek Treskospecial
04/17/2026Structural Steel - High Strength Bolting—special
04/17/2026FinalJarek Treskoprogress
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/03/2026B01389365-S1Request digital key ↗
09/03/2026B01389365-I1Request digital key ↗
08/15/2026B01387791-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026B01389365-I1Open ↗
08/17/2026B01389365-S1Open ↗
08/17/2026B01387782-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026B01389365-S1Open ↗
08/22/2026B01387782-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026B01389365-S1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/15/2026B01389365-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/15/2026B01387791-I1Open ↗
08/15/2026B01389365-I1Open ↗
08/15/2026B01389365-S1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/15/2026B01389365-I1Open ↗
▸DOB NOWFinal Survey1
08/15/2026B01389365-I1Open ↗