← Back
Four families
33 LOTT AVENUE
BROOKLYN · BIN 3082436
💬 Discuss this project
1930Year Built
2Stories
C3Building Class
R6Zoning
3,198 sfGross Floor Area
4Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Four families · 3,013 sf lot · 1.06 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Roof2p · 1 filing · 9 docs
Bulkhead1p · 1 filing · 9 docs
Floor 21p · 1 filing · 9 docs
Floor 1
Cellar3p · 1 filing · 9 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/05/2026$428K—Private party → 33 LOTT AVE LLC$134/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THOMAS C. TUNG, P.E.105/20/2026
Building Lifecycle
All (44)Filed (1)Violation (7)Objection (20)Special Inspection (16)
08/10/2026
Objection resolved — Resolved
08/10/2026
Objection resolved — Resolved
08/05/2026
Special inspection requirement — Permanent certificate
08/05/2026
Special inspection requirement — Maintenance information
08/05/2026
Special inspection requirement — Insulation placement and R values
08/05/2026
Special inspection requirement — Air barrier — testing
08/05/2026
Special inspection requirement — Metering
08/05/2026
Special inspection requirement — Air barrier - visual inspection
08/05/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
08/05/2026
Special inspection requirement — Interior lighting power
08/05/2026
Special inspection requirement — Fenestration areas
08/05/2026
Special inspection requirement — Fenestration air leakage
07/30/2026
Objection raised — Other
07/30/2026
Objection raised — Other
07/10/2026
Objection resolved — Addressed
07/10/2026
Objection resolved — Addressed
07/10/2026
Objection resolved — Resolved
07/10/2026
Objection resolved — Addressed
07/10/2026
Objection resolved — Resolved
07/10/2026
Objection resolved — Resolved
07/10/2026
Objection resolved — Resolved
07/10/2026
Objection resolved — Addressed
06/15/2026
Objection raised — Zoning
06/15/2026
Objection raised — Zoning
06/15/2026
Objection raised — Zoning
06/15/2026
Objection raised — Fire_Protection
06/15/2026
Objection raised — Zoning
06/15/2026
Objection raised — Accessibility
06/15/2026
Objection raised — Fire_Protection
06/15/2026
Objection raised — Other
05/20/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED ONE (1) STORY VERTICAL ENLARGEMENT ON EXISTING TWO (2) STORY WITH CELLAR & CONVERT EXISTING FOUR (4) DWELLING UNITS INTO TEN (10) DWELLING UNITS. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
B01404009-I1
05/18/2026
Special inspection requirement — Structural Steel - Details
05/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/18/2026
Special inspection requirement — Final
05/18/2026
Special inspection requirement — Energy Code Compliance Inspections
05/18/2026
Special inspection requirement — Structural Cold-Formed Steel
11/23/2025
Violation issued (HPD, closed)
C
11/23/2025
Violation issued (HPD, closed)
B
11/23/2025
Violation issued (HPD, closed)
C
11/23/2025
Violation issued (HPD, closed)
C
11/23/2025
Violation issued (HPD, closed)
B
02/25/2022
Violation issued (HPD, closed)
A
11/28/2012
Violation issued (HPD, closed)
C
Nothing on file for this building.
1 project · most recent 05/20/2026
Steel
FiledStatusContractorScope
05/20/2026——Steel
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
08/05/2026Permanent certificate—energy_progress
08/05/2026Maintenance information—energy_progress
08/05/2026Insulation placement and R values—energy_progress
08/05/2026Air barrier — testing —energy_progress
08/05/2026Metering—energy_progress
08/05/2026Air barrier - visual inspection—energy_progress
08/05/2026Fenestration and door U-factor and product ratings—energy_progress
08/05/2026Interior lighting power—energy_progress
08/05/2026Fenestration areas—energy_progress
08/05/2026Fenestration air leakage—energy_progress
05/18/2026Structural Steel - Details—special
05/18/2026Structural Stability – Alterations of existing buildings—special
05/18/2026Fire-Resistant Penetrations and Joints—special
05/18/2026Final—progress
05/18/2026Energy Code Compliance Inspections—progress
05/18/2026Structural Cold-Formed Steel—special
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/14/2026B01404009-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026B01404009-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026B01404009-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/14/2026B01404009-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026B01404009-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/14/2026B01404009-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026B01404009-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026B01404009-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/14/2026B01404009-I1Open ↗