← Back
BuildNYC
Two family frame
33 MULBERRY CIRCLE
STATEN ISLAND · BIN 5035718
💬 Discuss this project
1975Year Built
2Stories
B2Building Class
R3-1Zoning
2,870 sfGross Floor Area
2Units
Two family frame · 4,223 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRooftop solar installation3p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tom Petersen Architect102/26/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Kamtech Restoration203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kamtech Restorationspecialty_contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Thomas Petersen Architect7854102/26/2025
Building Lifecycle
06/23/2025
Signed off — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
S01187146-I1
03/05/2025
Permit issued — Solar
S01187146-I1-SL
02/26/2025
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
S01187146-I1
02/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
02/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offKamtech Restoration03/05/2025
2 projects · most recent 02/25/2025
General Wiring
FiledStatusContractorScope
02/25/2025CompleteBerger Quality Electrical—
01/16/2025CompleteD.R.P. Electrical ContractingGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/26/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
02/26/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
02/26/2025Energy Code Compliance InspectionsTOM PETERSENprogress
02/26/2025FinalTOM PETERSENprogress
02/26/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
9 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account