← Back
Three families
33 PERRY STREET
MANHATTAN · BIN 1010927
💬 Discuss this project
1897Year Built
3Stories
C0Building Class
R6Zoning
6,608 sfGross Floor Area
3Units
Rent Stabilized4 Open Violations ▸
Three families · Owner of record: 33 PERRY ST. HOLDING LLC · 2,454 sf lot · 2.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction28p · 1 filing · 20 docs
Floor 3Under Construction37p · 1 filing · 20 docs
Floor 2Under Construction38p · 1 filing · 20 docs
Floor 1Under Construction51p · 1 filing · 20 docs
CellarUnder Construction44p · 1 filing · 20 docs
1 job · most recent 09/12/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/12/2025Permit IssuedARIES CONSTRUCTION CO,INCHeating and Air Conditioning Systems
Heat / Cool
Daikin REYQ240AATJA 217,900 BTU · Vrf Outdoor ×2
RXTQ60TAVJUA 57,500 BTU · Vrf Outdoor ×2
RXYQ192AATJA 169,790 BTU · Vrf Outdoor ×2
1 job · most recent 09/12/2025
Sprinkler System
FiledStatusContractorScope
09/12/2025Permit IssuedKYPROS MECHANICAL CORPSprinkler System
1 job · most recent 09/12/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/12/2025Permit IssuedKYMECH INDUSTRIES INC.Gas, Water/Sanitary
2 jobs · most recent 08/21/2026
General Wiring
FiledStatusContractorScope
08/21/2026Permit IssuedRICHARD NEU—
01/21/2026Permit IssuedPRECISION ELECL CONT CORPGeneral Wiring
1 job · most recent 09/12/2025
Steel Masonry
FiledStatusContractorScope
09/12/2025Permit IssuedKYMECH INDUSTRIES INC.Steel, Masonry
2 jobs · most recent 08/21/2026
Sidewalk Shed Fence
FiledStatusContractorScope
08/21/2026Permit IssuedPARK CONTRACTING GROUPSidewalk Shed
12/01/2025Permit IssuedARIES CONSTRUCTION CO,INCFence
Building Lifecycle
All (78)Filed (13)Permit Issued (7)Violation (14)Objection (14)Special Inspection (30)
09/21/2026
Permit issued — Plumbing
M00962277-S3-PL
08/21/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01447306-I1
08/21/2026
Permit issued — Sidewalk Shed
M01447306-I1-SH
04/29/2026
Violation issued (HPD, open)
A
12/22/2025
Permit issued — Plumbing
M00962277-S3-PL
12/18/2025
Permit issued — Construction Fence
M01131972-I1-FN
12/16/2025
Permit issued — Sprinklers
M00962277-S4-EW-SP
12/01/2025
Filed — Alteration
TEMPORARY FENCE INSTALLATION FOR REMOVAL AND REINSTALLATION OF FAR SOUTH WINDOW BAY, REMOVAL OF EXISTING MAIN ENTRANCE IN CENTER BAY, INSTALLATION OF NEW DOOR ON FAR SOUTH BAY AND REMOVAL OF EXISTING AWNING.
M01131972-I1
11/17/2025
Violation issued (HPD, open)
I
11/06/2025
Permit issued — General Construction
M00962277-I1-GC
10/30/2025
Permit issued — Structural
M00962277-S1-ST
10/15/2025
Special inspection requirement — Final
ERIC BERLENT
10/15/2025
Special inspection requirement — Mechanical Systems
ERIC BERLENT
10/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
10/15/2025
Special inspection requirement — Heating Systems
ERIC BERLENT
09/24/2025
Special inspection requirement — Sprinkler Systems
Nicolas Crosetto
09/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
09/16/2025
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Masonry
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Subgrade Inspections
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Footing and Foundation
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
09/12/2025
Filed — Alteration CO
Modification to existing plumbing fixtures related to conversion to 1 family
M00962277-P2
09/12/2025
Filed — Alteration CO
Modification to existing plumbing fixtures related to conversion to 1 family
M00962277-P5
09/10/2025
Filed — Alteration CO
Modification to existing plumbing fixtures related to conversion to 1 family
M00962277-P4
09/10/2025
Filed — Alteration CO
Modification to existing plumbing fixtures related to conversion to 1 family
M00962277-P3
09/10/2025
Filed — Alteration CO
Modification to existing plumbing fixtures related to conversion to 1 family
M00962277-P1
09/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
09/05/2025
Special inspection requirement — Sprinkler Systems
Nicolas Crosetto
09/05/2025
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
09/05/2025
Special inspection requirement — Subgrade Inspections
SAMI HAJJAR P.E
09/05/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
09/05/2025
Special inspection requirement — Footing and Foundation
SAMI HAJJAR P.E
09/05/2025
Special inspection requirement — Masonry
SAMI HAJJAR P.E
09/05/2025
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
09/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
09/05/2025
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
09/05/2025
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
09/05/2025
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
09/05/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
06/04/2025
Violation issued (HPD, open)
A
06/06/2024
Filed — Alteration CO
Modification to existing plumbing fixtures related to conversion to 1 family
M00962277-S4
05/15/2024
Filed — Alteration CO
Modification to existing plumbing fixtures related to conversion to 1 family
M00962277-S5
05/15/2024
Objection resolved — Addressed
05/15/2024
Objection resolved — Addressed
04/01/2024
Violation issued (HPD, open)
A
02/13/2024
Objection resolved — Addressed
01/24/2024
Objection resolved — Addressed
01/24/2024
Objection resolved — Addressed
01/17/2024
Objection resolved — Addressed
01/03/2024
Objection raised — Admin
12/29/2023
Filed — Alteration CO
Modification to existing plumbing fixtures related to conversion to 1 family
M00962277-S3
12/29/2023
Filed — Alteration CO
Modification to existing plumbing fixtures related to conversion to 1 family
M00962277-S2
12/29/2023
Objection resolved — Addressed
Latest 60 of 78 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARK CONTRACTING GROUP108/22/2026
33 PERRY ST. HOLDING LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/29/2023$15.5M—Private party → 33 PERRY ST. HOLDING LLC$2,351/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.2403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARIES CONSTRUCTION CO,INCGeneral Contractor304/09/2026
KYPROS MECHANICAL CORPFire Protection107/08/2026
PARK CONTRACTING GROUPGeneral Contractor108/22/2026
AP PLUMBING & HVAC LLCPlumbing106/28/2026
NAF PAK PLBG & HTG CORPPlumbing109/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803409/12/2025
CATALPA SPECIAL INSPECTIO2004709/10/2025
MEP INSPECTIONS, INC1102209/10/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedNAF PAK PLBG & HTG CORP09/21/2026
DOB NOWSidewalk ShedPermit IssuedPARK CONTRACTING GROUP08/21/2026
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG12/22/2025
DOB NOWConstruction FencePermit IssuedARIES CONSTRUCTION CO,INC12/18/2025
DOB NOWSprinklersPermit IssuedKYPROS MECHANICAL CORP12/16/2025
DOB NOWGeneral ConstructionPermit IssuedARIES CONSTRUCTION CO,INC11/06/2025
DOB NOWStructuralPermit IssuedARIES CONSTRUCTION CO,INC10/30/2025
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
10/15/2025FinalERIC BERLENTprogress
10/15/2025Mechanical SystemsERIC BERLENTspecial
10/15/2025Fire-Resistant Penetrations and JointsERIC BERLENTspecial
10/15/2025Heating SystemsERIC BERLENTspecial
09/24/2025Sprinkler SystemsNicolas Crosettospecial
09/24/2025Fire-Resistant Penetrations and JointsERIC BERLENTspecial
09/16/2025Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
09/16/2025Structural Steel - WeldingSAMI HAJJAR P.Especial
09/16/2025Post-installed AnchorsSAMI HAJJAR P.Especial
09/16/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
09/16/2025FinalSAMI HAJJAR P.Eprogress
09/16/2025MasonrySAMI HAJJAR P.Especial
09/16/2025Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
09/16/2025Subgrade InspectionsSAMI HAJJAR P.Especial
09/16/2025Footing and FoundationSAMI HAJJAR P.Eprogress
09/16/2025FinalSAMI HAJJAR P.Eprogress
09/16/2025Structural Steel - DetailsSAMI HAJJAR P.Especial
09/05/2025Fire-Resistant Penetrations and JointsERIC BERLENTspecial
09/05/2025Sprinkler SystemsNicolas Crosettospecial
09/05/2025Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
09/05/2025Subgrade InspectionsSAMI HAJJAR P.Especial
09/05/2025FinalSAMI HAJJAR P.Eprogress
09/05/2025Footing and FoundationSAMI HAJJAR P.Eprogress
09/05/2025MasonrySAMI HAJJAR P.Especial
09/05/2025Post-installed AnchorsSAMI HAJJAR P.Especial
Latest 25 of 35.
▾Documents — 76 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/28/2026M00962277-P3Request digital key ↗
08/28/2026M00962277-P5Request digital key ↗
08/28/2026M00962277-P4Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits9
▸DOB NOWLPC Approval/Permit9
08/13/2026M00962277-S2Open ↗
08/13/2026M00962277-S3Open ↗
08/13/2026M00962277-S1Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications37
▸DOB NOWSpecial Inspector Seal & Signature19
09/18/2026M00962277-P4Open ↗
09/18/2026M00962277-P4Open ↗
08/27/2026M00962277-S4Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/28/2026M00962277-S1Open ↗
08/28/2026M00962277-I1Open ↗
08/28/2026M00962277-P5Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/26/2026M00962277-S5Open ↗
08/26/2026M00962277-S5Open ↗
08/25/2026M00962277-S1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/28/2026M00962277-P1Open ↗
08/15/2026M00962277-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/28/2026M00962277-S5Open ↗
08/28/2026M00962277-S4Open ↗
08/28/2026M00962277-S3Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs5
▸DOB NOWDEP Variance (V5) letter5
08/28/2026M00962277-S5Open ↗
08/28/2026M00962277-S4Open ↗
08/15/2026M00962277-I1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification2
08/28/2026M00962277-P1Open ↗
08/15/2026M00962277-I1Open ↗
▸DOB NOWProof of Historic Building2
08/13/2026M00962277-P1Open ↗
08/13/2026M00962277-I1Open ↗