Two family frame
33 RIDGEFIELD AVENUE
STATEN ISLAND · BIN 5175537
💬 Discuss this project
2022Year Built
3Stories
B2Building Class
R3AZoning
1,980 sfGross Floor Area
2Units
Two family frame · 4,914 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire Protection
Roof1 filing · 20 docs
Floor 31p · 2 filings · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STEADFAST CONSTRUCTION2507/08/2026
JAVES DEVELOPMENT103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT908/09/2022
C&P DESIGN CONSULTANTS111/04/2021
WILLIAM MONTAGUE ENGINEER102/12/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L GASS1003/21/2026
JOSEPH M. MORACE, ARCHITECT803/21/2026
SRA PLANNING & EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STEADFAST CONSTRUCTION LLGeneral Contractor2207/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
J.P.E. ELEC'L CONTR'S INCElectrical103/22/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA PLANNING & EXPEDITING5677408/05/2022
Building Lifecycle
All (69)Filed (11)Permit Issued (13)Signed Off (2)Inspection (13)Special Inspection (30)
09/08/2022
Signed off — Alteration
PROPOSED 2" DOMESTIC WITH SPRINKLER TAKE OFF (RESIDENTAIL SPRINKLER PLAN)
S00625232-I1
08/29/2022
Signed off — Alteration
proposed construction plywood fence
S00018860-I1
08/25/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/25/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/25/2022
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
08/24/2022
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
08/24/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/22/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/12/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/10/2022
Special inspection requirement — Mechanical Systems
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — Subgrade Inspections
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — Structural Wood Frame
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — Footing and Foundation
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — Final
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — Metering
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — Interior lighting power
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — Air barrier — testing
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — Insulation placement and R values
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — Fenestration areas
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — Ventilation and air distribution system
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — Permanent certificate
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — Duct leakage testing, insulation and design
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — Fenestration air leakage
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — Maintenance information
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — Protection of exposed foundation insulation
WILLIAM MONTAGUE
08/10/2022
Special inspection requirement — Air barrier - visual inspection
WILLIAM MONTAGUE
08/09/2022
Filed — New Building
INSTALLATION OF NEW 9' CURB CUT TO BE COMBINED WITH ADJACENT 9' CURB CUT TOTALLING 18'WIDE.
S00555755-P4
08/05/2022
Filed — New Building
INSTALLATION OF NEW 9' CURB CUT TO BE COMBINED WITH ADJACENT 9' CURB CUT TOTALLING 18'WIDE.
S00555755-P3
08/05/2022
Special inspection requirement — Ventilation and air distribution system
WILLIAM MONTAGUE
08/05/2022
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM MONTAGUE
08/04/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/05/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/02/2022
Permit issued — Curb Cut
S00555755-S4-CC
05/02/2022
Permit issued — Curb Cut
S00555755-S3-CC
04/29/2022
Filed — New Building
INSTALLATION OF NEW 9' CURB CUT TO BE COMBINED WITH ADJACENT 9' CURB CUT TOTALLING 18'WIDE.
S00555755-S3
04/29/2022
Filed — New Building
INSTALLATION OF NEW 9' CURB CUT TO BE COMBINED WITH ADJACENT 9' CURB CUT TOTALLING 18'WIDE.
S00555755-S4
04/20/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/24/2022
Permit issued — Structural
S00555755-I1-GC-CX
03/23/2022
Permit issued — Construction Fence
S00018860-I1-FN
02/23/2022
Permit issued — Plumbing
S00625232-I1-PL
02/18/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
02/15/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
02/10/2022
Permit issued — Plumbing
S83680994-S2-PL
02/10/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/26/2022
Permit issued — Plumbing
S00555755-S2-PL
01/24/2022
Filed — New Building
INSTALLATION OF NEW 9' CURB CUT TO BE COMBINED WITH ADJACENT 9' CURB CUT TOTALLING 18'WIDE.
S00555755-P1
01/24/2022
Filed — New Building
INSTALLATION OF NEW 9' CURB CUT TO BE COMBINED WITH ADJACENT 9' CURB CUT TOTALLING 18'WIDE.
S00555755-P2
12/27/2021
Permit issued — Earth Work
S00555755-S1-EA
12/23/2021
Filed — New Building
INSTALLATION OF NEW 9' CURB CUT TO BE COMBINED WITH ADJACENT 9' CURB CUT TOTALLING 18'WIDE.
S00555755-S2
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offSTEADFAST CONSTRUCTION LL05/02/2022
DOB NOWCurb CutSigned-offSTEADFAST CONSTRUCTION LL05/02/2022
DOB NOWStructuralPermit IssuedSTEADFAST CONSTRUCTION LL03/24/2022
DOB NOWConstruction FenceSigned-offSTEADFAST CONSTRUCTION LL03/23/2022
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR02/23/2022
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR02/10/2022
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC01/26/2022
DOB NOWEarth WorkSigned-offSTEADFAST CONSTRUCTION LL12/27/2021
DOB NOWMechanical SystemsPermit IssuedSTEADFAST CONSTRUCTION LL12/21/2021
DOB NOWConstruction FenceSigned-offSTEADFAST CONSTRUCTION LL03/22/2021
DOB NOWConstruction FenceSigned-offSTEADFAST CONSTRUCTION LL03/20/2019
DOB NOWConstruction FenceSigned-offSTEADFAST CONSTRUCTION LL10/15/2018
DOB NOWConstruction FenceSigned-offSTEADFAST CONSTRUCTION LL04/02/2018
1 project · most recent 08/09/2022
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/09/2022Signed-offQUALITY PLUMBING, INCGas, Storm, Water/Sanitary
1 project · most recent 01/03/2022
General Wiring
FiledStatusContractorScope
01/03/2022CompleteJ.P.E. ELEC'L CONTR'S INCGeneral Wiring
1 project · most recent 08/09/2022
Concrete Wood
FiledStatusContractorScope
08/09/2022Signed-offSTEADFAST CONSTRUCTION LLConcrete, Wood
1 project · most recent 08/09/2022
Earthwork
FiledStatusContractorScope
08/09/2022Signed-offSTEADFAST CONSTRUCTION LLEarthwork
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
08/25/2022Pass-Final CND-Occupancy InspectionPassView ↗
08/25/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
08/25/2022Pass-Final Fence Non-Directive 14PassView ↗
08/24/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
08/24/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/22/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/05/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/20/2022Pass-Final CND-Occupancy InspectionPassView ↗
02/18/2022Pass-Final PL - UndergroundPassView ↗
02/15/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
02/10/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
08/10/2022Mechanical SystemsWILLIAM MONTAGUEspecial
08/10/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM MONTAGUEspecial
08/10/2022Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
08/10/2022Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
08/10/2022Subgrade InspectionsWILLIAM MONTAGUEspecial
08/10/2022Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
08/10/2022Structural Wood FrameWILLIAM MONTAGUEprogress
08/10/2022Footing and FoundationWILLIAM MONTAGUEprogress
08/10/2022Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
08/10/2022FinalWILLIAM MONTAGUEprogress
08/10/2022MeteringWILLIAM MONTAGUEenergy_progress
08/10/2022Interior lighting powerWILLIAM MONTAGUEenergy_progress
08/10/2022Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
08/10/2022Air barrier — testing WILLIAM MONTAGUEenergy_progress
08/10/2022Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
08/10/2022Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
08/10/2022Fenestration areasWILLIAM MONTAGUEenergy_progress
08/10/2022Ventilation and air distribution systemWILLIAM MONTAGUEenergy_progress
08/10/2022HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
08/10/2022Permanent certificateWILLIAM MONTAGUEenergy_progress
08/10/2022HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
08/10/2022Duct leakage testing, insulation and designWILLIAM MONTAGUEenergy_progress
08/10/2022HVAC-R and service water heating system controlsWILLIAM MONTAGUEenergy_progress
08/10/2022Electric vehicle service equipment requirementsWILLIAM MONTAGUEenergy_progress
08/10/2022Fenestration air leakageWILLIAM MONTAGUEenergy_progress
Latest 25 of 58.
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/26/2026S00018860-I1Request digital key ↗
08/25/2026S00625232-I1Request digital key ↗
08/24/2026S00555755-S2Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/24/2026S00555755-P3Open ↗
08/24/2026S00555755-P2Open ↗
08/24/2026S00555755-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/24/2026S00555755-P3Open ↗
08/24/2026S00555755-P2Open ↗
08/24/2026S00555755-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/24/2026S00555755-I1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/24/2026S00555755-S1Open ↗
08/24/2026S00555755-P4Open ↗
08/24/2026S00555755-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/26/2026S00555755-S1Open ↗
08/26/2026S00555755-P3Open ↗
08/26/2026S00555755-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/26/2026S00625232-I1Open ↗
08/26/2026S00555755-P3Open ↗
08/26/2026S00555755-P3Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/24/2026S00555755-P3Open ↗
08/24/2026S00555755-P2Open ↗
08/24/2026S00555755-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/24/2026S00555755-I1—
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/24/2026S00555755-P3Open ↗
08/24/2026S00555755-P2Open ↗
08/24/2026S00555755-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/24/2026S00555755-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/24/2026S00555755-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/24/2026S00555755-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWOER: Notice to Proceed1
08/13/2026S00625232-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/24/2026S00555755-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/24/2026S00555755-I1Open ↗
08/24/2026S00555755-P3Open ↗
08/24/2026S00555755-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/24/2026S00555755-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/24/2026S00555755-I1Open ↗
▸Other Documents5
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/24/2026S00555755-P3Open ↗
08/24/2026S00555755-I1Open ↗
08/24/2026S00555755-P2Open ↗
▸DOB NOWFinal Survey1
08/24/2026S00555755-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/24/2026S00555755-P3Open ↗