Two family converted from one family
33 SOUTH PORTLAND AVE
BROOKLYN · Fort Greene · BIN 3058871
💬 Discuss this project
1867Year Built
3Stories
B3Building Class
R6BZoning
4,136 sfGross Floor Area
2Units
Two family converted from one family · 2,200 sf lot · 1.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof9p · 1 filing · 20 docs
Cellar9p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOCK DEBOER, AIA312/04/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A+ EXPEDITING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZP CONSTRUCTION & RENOVATIONGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOCK DEBOER, AIA - SIA7008212/04/2023
A DEGREE OF FREEDOM STRUC925112/21/2022
Building Lifecycle
All (42)Filed (3)Permit Issued (2)Signed Off (2)Objection (12)Special Inspection (23)
02/23/2024
Signed off — Alteration
PAA filed for as built conditions - Application filed for exterior alterations at the roof, including lowering the height of an existing stainless steel chimney flue with interior alterations at the cellar le
B00750614-S1
02/09/2024
Signed off — Alteration
PAA filed for as built conditions - Application filed for exterior alterations at the roof, including lowering the height of an existing stainless steel chimney flue with interior alterations at the cellar le
B00750614-I1
02/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jock deBoer
02/08/2024
Special inspection requirement — Concrete - Cast-In-Place
Jock deBoer
02/08/2024
Special inspection requirement — Energy Code Compliance Inspections
Jock deBoer
02/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
Jock deBoer
02/08/2024
Special inspection requirement — Final
Jock deBoer
02/08/2024
Special inspection requirement — Lighting controls
Jock deBoer
02/08/2024
Special inspection requirement — Interior lighting power
Jock deBoer
02/08/2024
Special inspection requirement — Insulation placement and R values
Jock deBoer
02/06/2024
Objection resolved — Addressed
02/06/2024
Objection resolved — Addressed
12/04/2023
Filed — Alteration
PAA filed for as built conditions - Application filed for exterior alterations at the roof, including lowering the height of an existing stainless steel chimney flue with interior alterations at the cellar le
B00750614-P1
12/04/2023
Objection raised — Scope
12/04/2023
Objection raised — Fire_Protection
11/15/2023
Special inspection requirement — Concrete - Cast-In-Place
Jock deBoer
11/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jock deBoer
11/15/2023
Special inspection requirement — Energy Code Compliance Inspections
Jock deBoer
11/15/2023
Special inspection requirement — Final
Jock deBoer
11/15/2023
Special inspection requirement — Fire-Resistance Rated Construction
Jock deBoer
11/15/2023
Special inspection requirement — Interior lighting power
Jock deBoer
11/15/2023
Special inspection requirement — Lighting controls
Jock deBoer
11/15/2023
Special inspection requirement — Insulation placement and R values
Jock deBoer
03/28/2023
Permit issued — Structural
B00750614-S1-ST
03/02/2023
Permit issued — General Construction
B00750614-I1-GC
12/21/2022
Filed — Alteration
PAA filed for as built conditions - Application filed for exterior alterations at the roof, including lowering the height of an existing stainless steel chimney flue with interior alterations at the cellar le
B00750614-S1
12/08/2022
Special inspection requirement — Structural Steel - Details
Dominic Cullen
12/08/2022
Special inspection requirement — Masonry
Dominic Cullen
12/08/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dominic Cullen
12/08/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Dominic Cullen
12/08/2022
Special inspection requirement — Structural Steel - Welding
Dominic Cullen
12/08/2022
Special inspection requirement — Final
Dominic Cullen
12/08/2022
Special inspection requirement — Energy Code Compliance Inspections
Jock deBoer
12/06/2022
Objection raised — Inspections
12/06/2022
Objection resolved — Addressed
12/06/2022
Objection raised — Scope
12/06/2022
Objection resolved — Addressed
12/06/2022
Objection raised — Other
12/06/2022
Objection resolved — Addressed
12/06/2022
Objection raised — Structural
12/06/2022
Objection resolved — Addressed
11/29/2022
Filed — Alteration
PAA filed for as built conditions - Application filed for exterior alterations at the roof, including lowering the height of an existing stainless steel chimney flue with interior alterations at the cellar le
B00750614-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offZP CONSTRUCTION & RENOVAT03/28/2023
DOB NOWGeneral ConstructionSigned-offZP CONSTRUCTION & RENOVAT03/02/2023
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
02/08/2024Fire-Resistant Penetrations and JointsJock deBoerspecial
02/08/2024Concrete - Cast-In-PlaceJock deBoerspecial
02/08/2024Energy Code Compliance InspectionsJock deBoerprogress
02/08/2024Fire-Resistance Rated ConstructionJock deBoerprogress
02/08/2024FinalJock deBoerprogress
02/08/2024Lighting controlsJock deBoerenergy_progress
02/08/2024Interior lighting powerJock deBoerenergy_progress
02/08/2024Insulation placement and R valuesJock deBoerenergy_progress
11/15/2023Concrete - Cast-In-PlaceJock deBoerspecial
11/15/2023Fire-Resistant Penetrations and JointsJock deBoerspecial
11/15/2023Energy Code Compliance InspectionsJock deBoerprogress
11/15/2023FinalJock deBoerprogress
11/15/2023Fire-Resistance Rated ConstructionJock deBoerprogress
11/15/2023Interior lighting powerJock deBoerenergy_progress
11/15/2023Lighting controlsJock deBoerenergy_progress
11/15/2023Insulation placement and R valuesJock deBoerenergy_progress
12/08/2022Structural Steel - DetailsDominic Cullenspecial
12/08/2022MasonryDominic Cullenspecial
12/08/2022Structural Stability – Alterations of existing buildingsDominic Cullenspecial
12/08/2022Structural Steel - High Strength BoltingDominic Cullenspecial
12/08/2022Structural Steel - WeldingDominic Cullenspecial
12/08/2022FinalDominic Cullenprogress
12/08/2022Energy Code Compliance InspectionsJock deBoerprogress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/28/2026B00750614-S1Request digital key ↗
08/15/2026B00750614-P1Request digital key ↗
08/14/2026B00750614-I1Request digital key ↗
▸Applications & Permits3
▸DOB NOWLPC Approval/Permit3
08/14/2026B00750614-I1Open ↗
08/13/2026B00750614-S1Open ↗
08/13/2026B00750614-P1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature6
08/31/2026B00750614-P1Open ↗
08/31/2026B00750614-P1Open ↗
08/25/2026B00750614-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026B00750614-P1Open ↗
08/25/2026B00750614-S1Open ↗
08/25/2026B00750614-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/28/2026B00750614-I1Open ↗
08/13/2026B00750614-P1Open ↗
08/13/2026B00750614-S1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026B00750614-I1Open ↗
08/13/2026B00750614-S1Open ↗
▸DOB NOWACP5/20/21 or V51
08/13/2026B00750614-S1Open ↗