← Back
BuildNYC
Dormitory
33 WASHINGTON SQUARE WEST
MANHATTAN · Greenwich Village · BIN 1008875
💬 Discuss this project
1955Year Built
16Stories
H8Building Class
R7-2Zoning
179,800 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized17 Active Violations 16 unresolved · 1 paperwork only ▸FISP: No Report FiledFDNY Report ↗
Dormitory · Owner of record: New York University · 16,065 sf lot · 11.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsNew York University2 filings
RoofNew York University1p · 1 filing · 7 docs
PenthouseNew York University1p · 1 filing · 6 docs
Floor 1New York University4p · 4 filings · 18 docs
CellarNew York University2p · 3 filings · 15 docs
Site & exteriorNew York University, Lipton Hall3 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York University7107/08/2026
Law Center Foundation103/21/2026
NYU103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Polise Consulting Engineers310/17/2025
HC Pec206/16/2025
Guth Deconzo Consulting Engineers106/13/2022
Environetics106/06/2022
Lpe Engineering111/07/2019
Paul Perdek, Prof. Engineering209/30/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Yao W Guo Architect403/21/2026
AEC Consulting Expediting403/21/2026
AE Design Solution403/21/2026
Socotec403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PJP InstallersScaffold707/08/2026
Hudson Plumbing & MCHPlumbing307/08/2026
Brosna ConstructionGeneral Contractor207/08/2026
Tectonic BuildersGeneral Contractor107/08/2026
Top Shelf ElectricElectrical103/21/2026
M&T Plumbing and Heating CoPlumbing107/08/2026
Mutual ElectricElectrical103/21/2026
Colony Electric CoElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Skyline Engineering267410/17/2025
Guth Deconzo Consulting E1210106/13/2022
Building Lifecycle
All (102)Filed (10)Permit Issued (13)Signed Off (8)Facade (FISP) (3)Violation (60)Inspection (3)Special Inspection (5)
04/29/2026
Violation issued (HPD, open)
A
04/07/2026
Signed off — Alteration
M01240807-I1
04/07/2026
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01240795-I1
03/09/2026
Violation issued (FDNY_ORDER, closed)
01/14/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/24/2025
Permit issued — Plumbing
M01232601-I1-PL
11/17/2025
Violation issued (HPD, open)
I
10/17/2025
Filed — Alteration
HEREWITH FILING FOR PLUMBING FIXTURES REMOVAL IN CELLAR AND 1ST FLOOR AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01232601-I1
07/24/2025
Signed off — Alteration
M00242597-I1
06/17/2025
Permit issued — Sidewalk Shed
M01240795-I1-SH
06/16/2025
Filed — Alteration
M01240807-I1
06/16/2025
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01240795-I1
06/16/2025
Permit issued — Supported Scaffold
M01240807-I1-SF
06/04/2025
Violation issued (HPD, open)
A
05/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
Matthew Wavro
05/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
05/27/2025
Permit issued — Mechanical Systems
M01172688-I1-MS
05/16/2025
Filed — Alteration
M01172688-I1
11/22/2024
Violation issued (HPD, open)
I
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/01/2024
Violation issued (HPD, open)
A
11/15/2023
Violation issued (HPD, open)
I
09/25/2023
Violation issued (FDNY_NOV, closed)
06/21/2023
Signed off — Alteration
MODIFICATION TO EXISTING BATHROOM PLUMBING WORK
M00351211-I1
03/27/2023
Signed off — Alteration
M00730287-I1
03/27/2023
Signed off — Alteration
This application is being filed for plumbing work on cellar and first floor at the subject premises. There is no change in use, egress or occupancy.
M00731047-I1
03/21/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/20/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/15/2023
Violation issued (HPD, open)
A
11/02/2022
Violation issued (HPD, open)
I
07/28/2022
Permit issued — Plumbing
M00731047-I1-PL
06/14/2022
Permit issued — General Construction
M00730287-I1-GC
06/13/2022
Filed — Alteration
This application is being filed for plumbing work on cellar and first floor at the subject premises. There is no change in use, egress or occupancy.
M00731047-I1
06/06/2022
Filed — Alteration
M00730287-I1
05/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Guth
02/16/2022
Violation issued (HPD, open)
I
02/16/2022
Violation issued (HPD, open)
A
12/22/2021
Violation issued (FDNY_NOV, closed)
08/25/2021
Permit issued — Plumbing
M00351211-I1-PL
04/01/2021
Violation issued (HPD, open)
I
04/01/2021
Violation issued (HPD, open)
A
03/30/2021
Permit issued — Structural
M00242597-I1-ST
10/22/2020
Signed off — Alteration
M00144045-I1
10/22/2020
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00220252-I1
08/27/2020
Violation issued (FDNY_NOV, closed)
07/17/2020
Permit issued — Plumbing
M00351211-I1-PL
07/08/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/08/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/12/2020
Filed — Alteration
MODIFICATION TO EXISTING BATHROOM PLUMBING WORK
M00351211-I1
05/21/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
03/20/2020
Permit issued — Supported Scaffold
M00220252-I1-SF
03/20/2020
Permit issued — Sidewalk Shed
M00144045-I1-SH
11/07/2019
Filed — Alteration
M00242597-I1
10/25/2019
Violation issued (HPD, open)
I
10/01/2019
Permit issued — Supported Scaffold
M00220252-I1-SF
09/30/2019
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00220252-I1
05/14/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/26/2019
Filed — Alteration
M00144045-I1
03/26/2019
Permit issued — Sidewalk Shed
M00144045-I1-SH
03/20/2019
Special inspection requirement — Final
Paul Perdek
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHudson Plumbing & MCH11/24/2025
DOB NOWSidewalk ShedSigned-offPJP Installers06/17/2025
DOB NOWSupported ScaffoldSigned-offPJP Installers06/16/2025
DOB NOWMechanical SystemsPermit IssuedBrosna Construction05/27/2025
DOB NOWPlumbingSigned-offM&T Plumbing and Heating Co07/28/2022
DOB NOWGeneral ConstructionSigned-offTectonic Builders06/14/2022
DOB NOWPlumbingSigned-offHudson Plumbing & MCH08/25/2021
DOB NOWStructuralSigned-offBrosna Construction03/30/2021
DOB NOWPlumbingSigned-offHudson Plumbing & MCH07/17/2020
DOB NOWSupported ScaffoldSigned-offPJP Installers03/20/2020
DOB NOWSidewalk ShedSigned-offPJP Installers03/20/2020
DOB NOWSupported ScaffoldSigned-offPJP Installers10/01/2019
DOB NOWSidewalk ShedSigned-offPJP Installers03/26/2019
BISOTISSUEDBrosna Construction07/08/2020
BISOTISSUEDDNA Contracting05/29/2020
BISOTISSUEDDNA Contracting02/28/2020
BISOTISSUEDDNA Contracting02/28/2020
BISEQISSUEDPJP Installers01/08/2020
BISOTISSUEDDNA Contracting10/24/2019
BISSPISSUEDAnesis Services09/12/2019
BISPLISSUEDHydrokinetic Plumbing & Heating I08/01/2019
BISOTISSUEDDNA Contracting05/16/2019
BISOTISSUEDBrosna Construction05/18/2017
BISMHISSUEDBrosna Construction05/18/2017
BISOTISSUEDTurner Construction Company12/23/2016
BISOTISSUEDDNA Contracting06/02/2016
BISEQISSUEDAll-Safe08/18/2015
BISEQISSUEDAll-Safe09/18/2014
BISEQISSUEDAll-Safe09/05/2014
BISOTISSUEDT. Higgins Construction03/21/2014
BISMHISSUEDPower Cooling04/24/2013
BISSPISSUEDFull Capacity Fire07/28/2011
BISEQISSUEDEverest Scaffolding03/26/2010
BISOTISSUEDSkyline Restoration03/25/2010
BISFPISSUEDSentinel Fire Control03/25/2010
BISEQISSUEDEverest Scaffolding02/19/2010
BISPLISSUEDPar Plumbing Co01/08/2009
BISPLISSUEDPar Plumbing Co11/29/2007
BISOTISSUEDIdesco11/26/2007
BISFPISSUEDSentinel Fire Control06/20/2007
+ 15 more permits on file
7 projects · most recent 07/21/2025
General Wiring Boiler Controls
FiledStatusContractorScope
07/21/2025Permit IssuedConductor Electrical ServicesGeneral Wiring
07/10/2025CompleteTop Shelf Electric—
04/08/2022CompleteMho's ElectricGeneral Wiring
10/11/2019CompleteConductor Electrical ServicesGeneral Wiring
10/11/2019CompleteConductor Electrical ServicesGeneral Wiring
03/20/2019CompleteTop Shelf Electric—
06/13/2018CompleteRigid ElectricBoiler Controls
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/14/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/21/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/29/2025Tenant Protection Plan ComplianceMatthew Wavrospecial
05/28/2025Fire-Resistant Penetrations and JointsMatthew Wavrospecial
05/11/2022Fire-Resistant Penetrations and JointsJohn Guthspecial
05/21/2020Fire-Resistant Penetrations and JointsMatthew Wavrospecial
03/20/2019FinalPaul Perdekprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
New York UniversityEducationEntire building
Project M01232601 Alteration · Permit Entire · 10/17/2025
Project M01240795 Alteration · LOC Issued · 06/16/2025
Project M01172688 Alteration · Permit Entire · 05/16/2025
Project M00731047 Alteration · LOC Issued · 06/13/2022
Project M00730287 Alteration · LOC Issued · 06/06/2022
Project M00351211 Alteration · LOC Issued · 06/12/2020
Project M00242597 Alteration · LOC Issued · 11/07/2019
Project M00220252 Alteration · LOC Issued · 09/30/2019
Project M00144045 Alteration · LOC Issued · 03/26/2019
Lipton HallEducation—
Project M01240807 Alteration · LOC Issued · 06/16/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 371 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch6
09/02/2026M00730287-I1Request digital key ↗
09/02/2026M00731047-I1Request digital key ↗
08/23/2026M01172688-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00351211-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00144045-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00220252-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00242597-I1Request digital key ↗
▸Applications & Permits64
▸BISPLAN / WORK APPROVAL APPLICATION35
02/04/2025123778224Open ↗
12/09/2024140913581Open ↗
11/12/2020123707275Open ↗
Showing 3 of 35 on file for this type
▸BISWORK PERMIT APPLICATION23
07/08/2020140913581Open ↗
05/29/2020123744537Open ↗
01/08/2020140882766Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWLPC Approval/Permit4
08/13/2026M01172688-I1Open ↗
08/13/2026M00351211-I1Open ↗
08/13/2026M00730287-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
02/05/2025123778224Open ↗
12/10/2024140913581Open ↗
▸Seals & Professional Certifications76
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION32
09/18/2019123744537Open ↗
09/18/2019123744537Open ↗
07/10/2019123778224Open ↗
Showing 3 of 32 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
06/24/2020140913581Open ↗
01/08/2020140882766Open ↗
09/18/2019123744537Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
09/18/2019123744537Open ↗
07/01/2019123778224Open ↗
07/01/2019123778224Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/05/2026M00242597-I1Open ↗
09/02/2026M00730287-I1Open ↗
09/02/2026M00731047-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026M01232601-I1Open ↗
08/24/2026M00731047-I1Open ↗
08/23/2026M00351211-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
06/24/2020140913581Open ↗
01/08/2020140882766Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/24/2020140913581Open ↗
01/08/2020140882766Open ↗
▸BISProfessional and Owner Certification (POC3)1
03/09/2016122678646Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/31/2026M00144045-I1Open ↗
▸Trade Schedules & Equipment9
▸BISEQUIPMENT USE APPLICATION/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
01/16/2025123778224Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/16/2025123778224Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/01/2019123778224Open ↗
▸BISSPRINKLER SYSTEMS1
12/23/2024123778224Open ↗
▸Safety & Tenant Protection32
▸BISSRO MD ANTI-HARASSMENT CHECKLIST10
06/24/2020140913581Open ↗
06/24/2020140913581Open ↗
01/08/2020140882766Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist8
09/02/2026M00731047-I1Open ↗
08/13/2026M00144045-I1Open ↗
08/13/2026M01232601-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTenant Protection Plan and Notes7
07/08/2020140913581Open ↗
09/18/2019123744537Open ↗
07/01/2019123778224Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTenant Protection Plan3
08/13/2026M00351211-I1Open ↗
08/13/2026M00220252-I1Open ↗
08/13/2026M00242597-I1Open ↗
▸BISANTI-HARASSMENT CHECKLIST2
05/12/2017123090626Open ↗
Showing 1 of 2 on file for this type
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT1
09/18/2019123744537Open ↗
▸BISSITE SAFETY PLAN: BEST APPROVAL REQUIRED1
12/02/2020123707275Open ↗
▸Environmental & Asbestos23
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
06/24/2020140913581Open ↗
09/18/2019123744537Open ↗
07/01/2019123778224Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/05/2026M00242597-I1Open ↗
09/02/2026M00730287-I1Open ↗
09/02/2026M00731047-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0565MN191
12/02/2020123707275Open ↗
▸Energy Compliance27
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
09/18/2019123744537Open ↗
07/10/2019123778224Open ↗
07/10/2019123778224Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
10/16/2020123744537Open ↗
06/24/2020140913581Open ↗
06/24/2020140913581Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
09/28/2020123707275Open ↗
10/17/2016122678646Open ↗
Showing 2 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
12/23/2024123778224Open ↗
10/16/2020123744537Open ↗
▸BISNYCECC EXEMPTION1
06/24/2020140913581Open ↗
▸BISEXTERIOR LIGHTING POWER1
01/16/2025123778224Open ↗
▸BISINTERIOR LIGHTING POWER1
01/16/2025123778224Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/23/2024123778224Open ↗
▸BISLIGHTING CONTROLS1
01/16/2025123778224Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY7
10/16/2020123744537Open ↗
09/28/2020123707275Open ↗
09/08/2020123744537Open ↗
Showing 3 of 7 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
07/01/2019123778224Open ↗
07/01/2019123778224Open ↗
▸BISMECHANICAL SYSTEMS1
12/23/2024123778224Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/23/2024123778224Open ↗
▸Approvals, Objections & Sign-offs47
▸BISLANDMARKS APPROVAL12
07/08/2020140913581Open ↗
06/24/2020140913581Open ↗
01/08/2020140882766Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
02/05/2025123778224Open ↗
12/02/2020123707275Open ↗
10/16/2020123744537Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
09/05/2026M00242597-I1Open ↗
09/02/2026M00730287-I1Open ↗
09/02/2026M00731047-I1Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISLANDMARKS SIGNOFF3
02/04/2025123778224Open ↗
11/26/2024140913581Open ↗
12/02/2020123707275Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/29/2020123744537Open ↗
Showing 1 of 2 on file for this type
▸BISFINAL2
02/05/2025123778224Open ↗
11/25/2024140913581Open ↗
▸Cost, Insurance & Ownership30
▸BISCOST AFFIDAVIT27
12/02/2020123707275Open ↗
09/08/2020123744537Open ↗
06/24/2020140913581Open ↗
Showing 3 of 27 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
12/23/2024123778224Open ↗
11/25/2024140913581Open ↗
10/16/2020123744537Open ↗
▸Filing & Intake Forms26
▸BISEFILING COVER SHEET15
09/18/2019123744537Open ↗
07/01/2019123778224Open ↗
07/01/2019123778224Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION7
11/12/2020123707275Open ↗
04/22/2015122106050Open ↗
04/21/2015122106050Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
06/24/2020140913581Open ↗
01/08/2020140882766Open ↗
Showing 2 of 3 on file for this type
▸BISBOROUGH INTAKE FORM1
05/21/2019123707275Open ↗
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
09/18/2019123744537Open ↗
04/19/2019123707275Open ↗
05/15/2017123090626Open ↗
Showing 3 of 9 on file for this type
▸BISFEE EXEMPTION DOCUMENTATION2
06/24/2020140913581Open ↗
01/08/2020140882766Open ↗
▸BISSupporting Document: Fee Exempt1
07/08/2020140913581Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M01172688-I1Open ↗