← Back
BuildNYC
Elevator cooperative
33 WEST 67TH STREET
MANHATTAN · BIN 1028238
💬 Discuss this project
1905Year Built
14Stories
D4Building Class
R8Zoning
66,847 sfGross Floor Area
36Units
LL97 CoveredRent Stabilized1 Active Violation 1 old, status unconfirmed ▸FISP: SAFE
Elevator cooperative · Owner of record: 33 West 67th Street Owners · 7,532 sf lot · 8.88 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsHalstead ManagementUnder Construction1 filing
RoofUnder Construction2p · 1 filing · 20 docs
Floor 6Unit 6FEUnder Construction1 filing · 10 docs
Floor 5
Floor 4Unit 4RW4 filings · 10 docs
Floor 3
Floor 2
Floor 1
CellarHalstead Management5p · 3 filings · 10 docs
Site & exteriorHeavy duty sidewalk shed construction3 filings · 8 docs
Filed — no permit issuedHalstead Management1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
33 West 67th3003/21/2026
33 West 67th Street Owners603/22/2026
33 W 67 Corp503/21/2026
William103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New Age810/01/2026
Wla Engineering110/01/2026
Halo Architecture506/25/2026
AM Architect906/24/2025
Asif Jamil, RA208/19/2021
Royal T&E112/31/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants903/21/2026
Halo Architecture203/21/2026
Modern Building Consultant203/21/2026
Green Studio403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Platinum Services NYScaffold807/08/2026
Phoenix Sutton STRScaffold607/08/2026
Sideris Plumbing & HeatingPlumbing307/08/2026
Tuc-Men ContractingGeneral Contractor307/08/2026
John J SiderisGeneral Contractor203/21/2026
Rock Group NYScaffold207/08/2026
Glenns Plumbing ServicesPlumbing207/08/2026
K & G Electric CoElectrical103/22/2026
Judd ElectricElectrical103/21/2026
Go Greener PlumbingPlumbing107/08/2026
Alklem PlumbingPlumbing107/08/2026
Update Systems ElectricalElectrical103/21/2026
Mac Global Design & RenovationGeneral Contractor104/09/2026
A.L. ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G Engineering7778110/01/2026
New Age Engineering7746810/01/2026
Integrity Consulting Service666102/28/2026
Project Tactical Solution5859206/10/2025
Richard H. Balser Engineering3028506/10/2025
Building Lifecycle
All (179)Filed (26)Permit Issued (22)Signed Off (9)Facade (FISP) (16)Violation (43)Inspection (17)Objection (16)Special Inspection (30)
10/01/2026
Filed — Alteration
REPLACE GAS PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01334394-P1
10/01/2026
Filed — Alteration
Facade repair - remove and replace limestone unit. No change in use, occupancy or egress.
M01455384-I1
09/09/2026
Special inspection requirement — Final
William Lau
09/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
08/20/2026
Objection raised — Scope
08/20/2026
Objection raised — Mechanical
08/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
08/03/2026
Filed — Alteration
REPLACE GAS PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01334394-S1
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
07/30/2026
Special inspection requirement — Lighting in dwelling units
ALEKSANDR LEVIN
07/30/2026
Special inspection requirement — Final
ALEKSANDR LEVIN
07/09/2026
Special inspection requirement — Final
07/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
06/25/2026
Filed — Alteration
Plumbing work filed in conjunction with the apartment renovation work. No change in use, egress, or occupancy under this application.
M01318323-P2
06/25/2026
Filed — Alteration
Plumbing work filed in conjunction with the apartment renovation work. No change in use, egress, or occupancy under this application.
M01318323-P1
06/17/2026
Special inspection requirement — Lighting in dwelling units
ALEKSANDR LEVIN
06/17/2026
Special inspection requirement — Final
ALEKSANDR LEVIN
04/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/20/2026
Objection resolved — Addressed
03/20/2026
Objection resolved — Addressed
03/13/2026
Objection raised — Scope
03/13/2026
Objection raised — Energy
03/12/2026
Permit issued — Plumbing
M01334394-I1-PL
02/28/2026
Filed — Alteration
Plumbing work filed in conjunction with the apartment renovation work. No change in use, egress, or occupancy under this application.
M01318323-S2
02/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
ALEKSANDR LEVIN
02/26/2026
Special inspection requirement — Ventilation and air distribution system
ALEKSANDR LEVIN
02/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEKSANDR LEVIN
02/26/2026
Special inspection requirement — Maintenance information
ALEKSANDR LEVIN
02/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
ALEKSANDR LEVIN
02/06/2026
Permit issued — Plumbing
M01318323-S1-PL
01/29/2026
Filed — Alteration
REPLACE GAS PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01334394-I1
01/28/2026
Permit issued — General Construction
M01318323-I1-GC
01/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/16/2025
Objection resolved — Addressed
12/15/2025
Objection resolved — Addressed
12/15/2025
Objection resolved — Addressed
12/11/2025
Objection raised — Cost
12/11/2025
Objection raised — Scope
12/11/2025
Objection raised — Accessibility
12/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/01/2025
Filed — Alteration
Plumbing work filed in conjunction with the apartment renovation work. No change in use, egress, or occupancy under this application.
M01318323-S1
12/01/2025
Filed — Alteration
Plumbing work filed in conjunction with the apartment renovation work. No change in use, egress, or occupancy under this application.
M01318323-I1
11/12/2025
Special inspection requirement — Final
ALEKSANDR LEVIN
11/12/2025
Special inspection requirement — Mechanical Systems
ALEKSANDR LEVIN
09/23/2025
Signed off — Alteration
M01165679-I1
09/18/2025
Signed off — Alteration
PLUMBING WORK ON THE 4TH FLOOR IN APARTMENT 4RW AS PER PLANS FILED HEREWITH. WORK INCLUDES REMOVAL, REPLACEMENT, AND INSTALLTION OF FIXTURES. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01096121-I1
09/18/2025
Signed off — Alteration
M01165634-I1
09/18/2025
Signed off — Alteration
INTERIOR RENOVATION ON THE 4th FLOOR IN APARTMENT 4RW AS PER PLANS FILED HEREWITH. WORK INCLUDES REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, RELOCATION OF KITCHEN AND NEW BATHROOMS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01096103-I1
07/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/24/2025
Filed — Alteration
PLUMBING WORK ON THE 4TH FLOOR IN APARTMENT 4RW AS PER PLANS FILED HEREWITH. WORK INCLUDES REMOVAL, REPLACEMENT, AND INSTALLTION OF FIXTURES. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01096121-P3
06/18/2025
Special inspection requirement — Post-installed Anchors
Balser Richard
06/18/2025
Special inspection requirement — Final
Altagracia Martinez
06/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Altagracia Martinez
06/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
Max Lee
06/11/2025
Filed — Alteration
PLUMBING WORK ON THE 4TH FLOOR IN APARTMENT 4RW AS PER PLANS FILED HEREWITH. WORK INCLUDES REMOVAL, REPLACEMENT, AND INSTALLTION OF FIXTURES. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01096121-P2
06/10/2025
Filed — Alteration
INTERIOR RENOVATION ON THE 4th FLOOR IN APARTMENT 4RW AS PER PLANS FILED HEREWITH. WORK INCLUDES REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, RELOCATION OF KITCHEN AND NEW BATHROOMS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01096103-P2
05/29/2025
Special inspection requirement — Final
Altagracia Martinez
05/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Altagracia Martinez
05/29/2025
Special inspection requirement — Post-installed Anchors
Balser Richard
Latest 60 of 179 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAlklem Plumbing03/12/2026
DOB NOWPlumbingPermit IssuedGo Greener Plumbing02/06/2026
DOB NOWGeneral ConstructionPermit IssuedMac Global Design & Renovation01/28/2026
DOB NOWGeneral ConstructionSigned-offTuc-Men Contracting03/17/2025
DOB NOWMechanical SystemsSigned-offTuc-Men Contracting03/17/2025
DOB NOWPlumbingSigned-offGlenns Plumbing Services02/21/2025
DOB NOWPlumbingSigned-offGlenns Plumbing Services10/15/2024
DOB NOWGeneral ConstructionSigned-offTuc-Men Contracting10/06/2024
DOB NOWMechanical SystemsSigned-offJohn J Sideris08/23/2023
DOB NOWPlumbingSigned-offSideris Plumbing & Heating08/23/2023
DOB NOWSprinklersSigned-offSideris Plumbing & Heating08/23/2023
DOB NOWStandpipeSigned-offSideris Plumbing & Heating08/23/2023
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR01/05/2022
DOB NOWSidewalk ShedSigned-offPlatinum Services NY11/04/2021
DOB NOWSupported ScaffoldPermit IssuedPlatinum Services NY11/04/2021
DOB NOWSupported ScaffoldPermit IssuedPlatinum Services NY08/19/2021
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR01/10/2021
DOB NOWSidewalk ShedSigned-offPlatinum Services NY09/29/2020
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR01/02/2020
DOB NOWSidewalk ShedSigned-offRock Group NY10/12/2019
DOB NOWSidewalk ShedSigned-offRock Group NY05/17/2019
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR01/02/2019
BISOTISSUEDNew Generation Iron02/03/2022
BISOTISSUEDNew Generation Iron06/16/2021
BISOTISSUEDNew Generation Construction06/30/2020
BISOTISSUEDNew Generation Construction09/26/2019
BISPLISSUEDFernandez Heating & Mechanical03/18/2019
BISOTISSUEDTuc-Men Contracting02/27/2019
BISPLISSUEDS&H Plumbing02/27/2018
BISOTISSUEDTraditional Line02/20/2018
BISMHISSUEDTraditional Line02/20/2018
BISMHISSUEDFulton General Contractor10/27/2017
BISPLISSUEDA.M.N04/05/2017
BISPLISSUEDS&H Plumbing02/28/2017
BISMHISSUEDTraditional Line02/13/2017
BISOTISSUEDTraditional Line02/13/2017
BISOTISSUEDTraditional Line10/21/2016
BISMHISSUEDTraditional Line10/21/2016
BISOTISSUEDCustom Interiors Renovation10/13/2016
BISPLISSUEDAAA Total Plumbing11/23/2015
+ 32 more permits on file
2 projects · most recent 10/01/2026
Gas Water/Sanitary
FiledStatusContractorScope
10/01/2026Permit IssuedAlklem PlumbingGas
06/25/2026Permit IssuedGo Greener PlumbingWater/Sanitary
9 projects · most recent 01/27/2026
General Wiring
FiledStatusContractorScope
01/27/2026Permit IssuedIntake Electric ContGeneral Wiring
06/10/2025CompleteA.L. ElectricalGeneral Wiring
02/25/2025CompleteNGM Electric—
02/25/2025Permit IssuedNGM ElectricGeneral Wiring
12/04/2023Permit IssuedK & G Electric CoGeneral Wiring
08/23/2023CompleteJam Electrical—
11/12/2020CompleteResponse ElectricGeneral Wiring
05/08/2019CompleteTop Shelf Electric—
12/20/2018CompleteElpo Electrical Contg—
1 project · most recent 08/19/2021
Scaffold
FiledStatusContractorScope
08/19/2021Permit IssuedPlatinum Services NYScaffold
2 projects · most recent 10/01/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
10/01/2026Permit IssuedAlklem PlumbingTenant Protection Plan 72 Hour
06/25/2026Permit IssuedGo Greener PlumbingTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
04/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/09/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/17/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/27/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
11/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/26/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/26/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
09/22/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/22/2023Certified Sprinkler - SP - RoughingCertifiedView ↗
09/22/2023Certified StandPipe - SD - Fire StandPipe - SD - RoughingCertifiedView ↗
09/22/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
09/09/2026FinalWilliam Lauprogress
09/09/2026Tenant Protection Plan Compliance—special
09/08/2026Tenant Protection Plan ComplianceStephen Shishkospecial
08/14/2026Fire-Resistant Penetrations and JointsStephen Shishkospecial
08/03/2026Fire-Resistant Penetrations and JointsStephen Shishkospecial
07/30/2026Lighting in dwelling unitsALEKSANDR LEVINenergy_progress
07/30/2026FinalALEKSANDR LEVINprogress
07/09/2026Final—progress
07/09/2026Tenant Protection Plan ComplianceStephen Shishkospecial
06/17/2026Lighting in dwelling unitsALEKSANDR LEVINenergy_progress
06/17/2026FinalALEKSANDR LEVINprogress
02/26/2026HVAC-R and service water heating equipmentALEKSANDR LEVINenergy_progress
02/26/2026Ventilation and air distribution systemALEKSANDR LEVINenergy_progress
02/26/2026HVAC-R and service water piping design and insulationALEKSANDR LEVINenergy_progress
02/26/2026Maintenance informationALEKSANDR LEVINenergy_progress
02/26/2026HVAC-R and service water heating system controlsALEKSANDR LEVINenergy_progress
11/12/2025FinalALEKSANDR LEVINprogress
11/12/2025Mechanical SystemsALEKSANDR LEVINspecial
06/18/2025Post-installed AnchorsBalser Richardspecial
06/18/2025FinalAltagracia Martinezprogress
06/18/2025Energy Code Compliance InspectionsAltagracia Martinezprogress
06/18/2025Tenant Protection Plan ComplianceMax Leespecial
05/29/2025FinalAltagracia Martinezprogress
05/29/2025Energy Code Compliance InspectionsAltagracia Martinezprogress
05/29/2025Post-installed AnchorsBalser Richardspecial
Latest 25 of 36.
▾Documents — 456 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch24
10/04/2026M01455384-I1Request digital key ↗
09/03/2026M00578561-I1Request digital key ↗
08/31/2026M00844602-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00114666-I1Request digital key ↗
09/05/2026M00164838-I1Request digital key ↗
▸Applications & Permits87
▸BISWORK PERMIT APPLICATION38
06/17/2021123744528Open ↗
09/26/2019123744528Open ↗
03/19/2019123825165Open ↗
Showing 3 of 38 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION32
01/28/2022123744528Open ↗
01/12/2022123744528Open ↗
12/14/2021123744528Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWLPC Approval/Permit16
10/04/2026M01455384-I1Open ↗
08/26/2026M01096103-P1Open ↗
08/26/2026M01096103-I1Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
03/20/2020123825165Open ↗
▸Seals & Professional Certifications102
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION41
04/20/2020123825165Open ↗
04/20/2020123825165Open ↗
04/10/2020123825165Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature26
10/04/2026M01455384-I1Open ↗
09/05/2026M00164838-I1Open ↗
08/29/2026M00844905-P1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
10/05/2026M01455384-I1Open ↗
09/28/2026M00114666-I1Open ↗
09/02/2026M01096103-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
10/05/2026M01334394-P1Open ↗
10/01/2026M00844611-I1Open ↗
09/02/2026M01096103-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
09/18/2019123744528Open ↗
09/16/2019123744528Open ↗
02/22/2019123825165Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/16/2019123744528Open ↗
02/22/2019123825165Open ↗
▸Trade Schedules & Equipment42
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE12
03/23/2020123825165Open ↗
03/19/2020123825165Open ↗
11/20/2019123825165Open ↗
Showing 3 of 12 on file for this type
▸BISSELF-CERT PLUMBING NOTICE11
01/24/2014121527874Open ↗
01/16/2014121527874Open ↗
Showing 2 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING11
08/19/2013121527874Open ↗
Showing 1 of 11 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
01/28/2014121527874Open ↗
Showing 1 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
01/29/2014121527874Open ↗
Showing 1 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes5
09/16/2019123744528Open ↗
09/16/2019123744528Open ↗
02/22/2019123825165Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos40
▸DOB NOWDEP ACP-5: Asbestos Assessment Report21
10/04/2026M01455384-I1Open ↗
08/29/2026M00844905-P1Open ↗
08/29/2026M00844905-I1Open ↗
Showing 3 of 21 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
03/19/2020123825165Open ↗
02/22/2019123825165Open ↗
08/10/2016122854125Open ↗
Showing 3 of 7 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
09/26/2019123744528Open ↗
08/16/2016122857113Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance24
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS15
04/20/2020123825165Open ↗
04/20/2020123825165Open ↗
04/10/2020123825165Open ↗
Showing 3 of 15 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
04/20/2020123825165Open ↗
04/10/2020123825165Open ↗
11/02/2017121011001Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/07/2022123744528Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/07/2022123744528Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY7
07/11/2022123744528Open ↗
07/07/2022123744528Open ↗
07/07/2022123744528Open ↗
Showing 3 of 7 on file for this type
▸BISMANUFACTURE STATEMENT: QUALITY OF MASONRY UNITS-REQUIRED PRIOR TO CONSTRUCTION OF MASONRY (B FORM 10H)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs40
▸BISLANDMARKS APPROVAL15
04/20/2020123825165Open ↗
09/16/2019123744528Open ↗
02/22/2019123825165Open ↗
Showing 3 of 15 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
07/13/2022123744528Open ↗
08/06/2020123825165Open ↗
04/20/2020123825165Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUPERSEDING LETTER1
06/17/2021123744528Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
05/22/2013121388952Open ↗
▸Cost, Insurance & Ownership29
▸BISCOST AFFIDAVIT27
04/20/2020123825165Open ↗
04/10/2020123825165Open ↗
09/16/2019123744528Open ↗
Showing 3 of 27 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/07/2022123744528Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms48
▸BISEFILING COVER SHEET18
09/16/2019123744528Open ↗
02/22/2019123825165Open ↗
08/16/2016122857113Open ↗
Showing 3 of 18 on file for this type
▸BISADDITIONAL INFORMATION15
01/28/2022123744528Open ↗
03/20/2020123825165Open ↗
01/31/2020123825165Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM14
06/17/2021123744528Open ↗
04/20/2020123825165Open ↗
04/10/2020123825165Open ↗
Showing 3 of 14 on file for this type
▸BISeFiling Job Application Cover Sheet1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents4
▸BISECCCNYS ANALYSIS1
10/12/2016122854125Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026M00114666-I1Open ↗