← Back
BuildNYC
Elevator cooperative
330 3RD AVENUE
MANHATTAN · Gramercy · BIN 1018079
💬 Discuss this project
1964Year Built
20Stories
D4Building Class
C2-8Zoning
207,201 sfGross Floor Area
198Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFE
Elevator cooperative · Owner of record: 330 Third Avenue Owners' · 13,062 sf lot · 15.86 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsPipe scaffold installation1 filing
RoofHeating burners, water heaters, and house pumps installation1p · 1 filing · 18 docs
Floor 21Residential alteration and renovation1 filing · 3 docs
Floor 20
Floor 19Unit 20F1p · 1 filing · 4 docs
Floor 18
Floor 17Unit 17K1 filing · 5 docs
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12Unit 12A, Unit 12G, Unit 12J +13 filings · 18 docs
Floor 11
Floor 10
Floor 9Unit 9G1 filing · 8 docs
Floor 8
Floor 7
Floor 6Unit 6A, Unit 6LA3 filings · 20 docs
Floor 5
Floor 4
Floor 3Unit 3G1 filing · 11 docs
Floor 2
Floor 1
CellarHeating burners, water heaters, and house pumps installation2 filings · 20 docs
Sub-CellarHeating burners, water heaters, and house pumps installation1 filing · 18 docs
Site & exteriorHeavy duty sidewalk shed2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
330 Third Ave Owners5303/22/2026
SR Dist Manager Orsid Realty203/21/2026
330 Third Avenue Owners203/21/2026
Owners203/21/2026
William B May Co103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CQ&J307/20/2026
Meszaros Engineering309/18/2025
Papa K208/23/2024
Paradigm Architecture103/18/2024
Lawrence V. McDonald, Jr. Architect110/09/2023
David Jimenez, RA510/19/2022
Enthink Engineers305/23/2022
March Associates105/06/2022
Paul Perdek, Prof. Engineering102/04/2022
Ashraf107/27/2021
LB&B Associates205/27/2021
Palermo Edwards Architecture108/19/2020
Architecture by Domani102/12/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Meszaros Engineering603/21/2026
Brooklyn Root Design203/21/2026
Municipal Building Consultants103/21/2026
Green Studio203/21/2026
AE Design Solution203/21/2026
Ace-NYC Zoning and Code Consultants203/21/2026
Domani Consulting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MZZ RenovationGeneral Contractor603/21/2026
Skyline Pro Construction*General Contractor507/08/2026
CarpexGeneral Contractor303/21/2026
Platinum Services NYScaffold303/21/2026
USA Elect'l ServicesElectrical103/21/2026
LTC Electrical ContractingElectrical103/22/2026
Elmac ElectricElectrical103/21/2026
Power Full ElectricElectrical103/22/2026
Spectrum ElectricElectrical103/21/2026
The Metro Group ElectricElectrical103/22/2026
AbileneGeneral Contractor104/09/2026
Cortlandt ContractingGeneral Contractor107/08/2026
Demari ServicesGeneral Contractor107/08/2026
Pasco ContractorsGeneral Contractor107/08/2026
Andamio ScaffoldingScaffold107/08/2026
Skyline RestorationScaffold107/08/2026
Accurate MechanicalPlumbing107/08/2026
AP Plumbing & HVACPlumbing107/08/2026
Ariana ContractingPlumbing107/08/2026
D.D.S. Mechanical PBG & HeatingPlumbing107/08/2026
NY City PlumberPlumbing106/27/2026
Orbit Plumbing & HeatingPlumbing107/08/2026
All Purpose ElectricElectrical103/22/2026
Wynne Plumbing & HeatingPlumbing107/08/2026
Cresco ElectricalElectrical103/22/2026
Edwin Soto, JRElectrical103/21/2026
Gsa ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Twig Special Inspections885207/20/2026
Meszaros Engineering963309/18/2025
Paradigm Architecture5931103/18/2024
Lawrence V McDonald Architects6039110/09/2023
Outsource Special Inspection2827310/19/2022
March Chadwick, Architect2253105/06/2022
LB Engineering3122205/27/2021
Building Lifecycle
All (176)Filed (25)Permit Issued (21)Signed Off (10)Facade (FISP) (13)Violation (38)Inspection (13)Objection (26)Special Inspection (30)
09/03/2026
Signed off — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01255785-I1
08/18/2026
Objection resolved — Resolved
08/06/2026
Objection raised — Accessibility
07/20/2026
Filed — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01255785-P1
07/17/2026
Special inspection requirement — Final
CALVIN TRAN
07/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dave Wall
07/17/2026
Special inspection requirement — Lighting controls
CALVIN TRAN
07/17/2026
Special inspection requirement — Lighting in dwelling units
CALVIN TRAN
06/10/2026
Signed off — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01255785-S1
04/15/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/22/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/23/2025
Permit issued — Plumbing
M01237355-S2-PL
09/23/2025
Permit issued — General Construction
M01237355-S1-GC
09/18/2025
Filed — Alteration
INSTALLATION OF (2) NEW BOILERS AND BURNERS FOR GAS OPERATION. REMOVAL OF EXISTING OIL TANK AND RELATED COMPONENTS. NO CHANGE IN EGRESS OR OCCUPANCY.
M01237355-S2
09/18/2025
Filed — Alteration
INSTALLATION OF (2) NEW BOILERS AND BURNERS FOR GAS OPERATION. REMOVAL OF EXISTING OIL TANK AND RELATED COMPONENTS. NO CHANGE IN EGRESS OR OCCUPANCY.
M01237355-S1
08/19/2025
Permit issued — General Construction
M01255785-I1-GC
08/18/2025
Permit issued — Plumbing
M01255785-S1-PL
07/25/2025
Filed — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01255785-I1
07/25/2025
Filed — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01255785-S1
07/21/2025
Permit issued — Boiler Equipment
M01237355-I1-BE
06/11/2025
Filed — Alteration
INSTALLATION OF (2) NEW BOILERS AND BURNERS FOR GAS OPERATION. REMOVAL OF EXISTING OIL TANK AND RELATED COMPONENTS. NO CHANGE IN EGRESS OR OCCUPANCY.
M01237355-I1
06/09/2025
Special inspection requirement — Preliminary
Christian Meszaros
06/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
06/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Christian Meszaros
06/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christian Meszaros
06/09/2025
Special inspection requirement — Maintenance information
Christian Meszaros
06/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christian Meszaros
06/09/2025
Special inspection requirement — Post-installed Anchors
Christian Meszaros
06/09/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Christian Meszaros
06/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
06/09/2025
Special inspection requirement — Heating Systems
Christian Meszaros
06/09/2025
Special inspection requirement — Post-installed Anchors
Christian Meszaros
06/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christian Meszaros
06/06/2025
Special inspection requirement — Final
Christian Meszaros
06/06/2025
Special inspection requirement — Chimneys and vents
Christian Meszaros
06/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
06/06/2025
Special inspection requirement — Maintenance information
Christian Meszaros
06/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christian Meszaros
06/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christian Meszaros
06/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Christian Meszaros
01/16/2025
Signed off — Alteration
SUBSEQUENT FILING FOR THE INSTALLATION OF NEW PLUMBING FIXTURES FILED IN CONJUNCTION WITH THE RENOVATION OF APARTMENT 9G INCLUDING MINOR PARTITION WORK AND INSTALLATION OF KITCHEN APPLIANCES.
M01100270-I1
01/16/2025
Signed off — Alteration
SUBSEQUENT FILING FOR THE INSTALLATION OF NEW PLUMBING FIXTURES FILED IN CONJUNCTION WITH THE RENOVATION OF APARTMENT 9G INCLUDING MINOR PARTITION WORK AND INSTALLATION OF KITCHEN APPLIANCES.
M01100270-S1
01/15/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/20/2024
Signed off — Alteration
GARAGE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01014283-I1
11/21/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/14/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/07/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/07/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/28/2024
Permit issued — General Construction
M01100270-I1-GC
09/20/2024
Permit issued — Plumbing
M01100270-S1-PL
09/12/2024
Objection resolved — Addressed
09/12/2024
Objection resolved — Addressed
09/11/2024
Objection raised — Other
08/30/2024
Permit issued — General Construction
M01100270-I1-GC
08/29/2024
Objection resolved — Addressed
08/29/2024
Objection resolved — Addressed
08/27/2024
Signed off — Alteration
INTERIOR RENOVATION OF APARTMENT. MINOR REMOVAL AND CONSTRUCTION OF PARTITIONS. NO CHANGE TO USE EGRESS OR OCCUPANCY
M00944689-I1
Latest 60 of 176 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedNY City Plumber09/23/2025
DOB NOWGeneral ConstructionPermit IssuedAbilene09/23/2025
DOB NOWGeneral ConstructionSigned-offSkyline Pro Construction*08/19/2025
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating08/18/2025
DOB NOWBoiler EquipmentPermit IssuedAbilene07/21/2025
DOB NOWGeneral ConstructionSigned-offSkyline Pro Construction*10/28/2024
DOB NOWPlumbingSigned-offD.D.S. Mechanical PBG & Heating09/20/2024
DOB NOWGeneral ConstructionSigned-offSkyline Pro Construction*08/30/2024
DOB NOWGeneral ConstructionSigned-offDemari Services06/11/2024
DOB NOWGeneral ConstructionSigned-offCortlandt Contracting11/15/2023
DOB NOWGeneral ConstructionPermit IssuedMZZ Renovation05/01/2023
DOB NOWGeneral ConstructionPermit IssuedCarpex11/01/2022
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating10/26/2022
DOB NOWMechanical SystemsPermit IssuedMZZ Renovation10/25/2022
DOB NOWGeneral ConstructionSigned-offPasco Contractors06/07/2022
DOB NOWSupported ScaffoldPermit IssuedSkyline Restoration02/07/2022
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding11/16/2021
DOB NOWSidewalk ShedSigned-offPlatinum Services NY07/28/2021
DOB NOWPlumbingSigned-offAriana Contracting10/28/2020
DOB NOWPlumbingPermit IssuedAnthony Disabato09/09/2020
DOB NOWPlumbingSigned-offWynne Plumbing & Heating03/03/2020
BISOTISSUEDSkyline Restoration10/05/2022
BISOTISSUEDSkyline Restoration02/18/2022
BISOTISSUEDSkyline Restoration01/13/2022
BISOTISSUEDRiconda Maintenance10/06/2021
BISOTISSUEDHarry's Contracting04/16/2021
BISOTISSUEDLJPY01/19/2021
BISOTISSUEDLJPY10/26/2020
BISOTISSUEDFranco BLDNG. Maintenance10/23/2020
BISOTISSUEDHarry's Contracting09/09/2020
BISOTISSUEDPaint Masters NY07/10/2020
BISOTISSUEDWynne Plumbing and Heating04/24/2020
BISOTISSUEDWynne Plumbing and Heating03/13/2020
BISOTISSUEDWynne Plumbing and Heating02/28/2020
BISOTISSUEDTbro's Renovation10/22/2019
BISPLISSUEDAlpine Refrigeration Co10/22/2019
BISOTISSUEDTbro's Renovation10/15/2019
BISPLISSUEDJust Plumbing & Heating06/24/2019
BISOTISSUEDEverest Realty Holdings I06/04/2019
BISOTISSUEDTbro's Renovation06/03/2019
+ 31 more permits on file
1 project · most recent 08/18/2022
Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
08/18/2022——Air Conditioning Systems, Associated Ducts and Piping
Cooling
National Comfort NCPAH-24-M 24 BTU · Ahu ×1
NCPE-418-4010 18 BTU · Condensing Unit ×1
3 projects · most recent 07/20/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/20/2026Signed-offAP Plumbing & HVACGas, Water/Sanitary
09/18/2025Permit IssuedNY City PlumberGas, Water/Sanitary
08/12/2020Permit IssuedAccurate MechanicalGas, Water/Sanitary
25 projects · most recent 08/14/2026
General Wiring
FiledStatusContractorScope
08/14/2026Permit IssuedKJK ElectricGeneral Wiring
08/13/2025Permit IssuedAbilene Electric—
08/13/2025CompleteLTC Electrical ContractingGeneral Wiring
08/07/2025CompleteSoran ElectricalGeneral Wiring
05/01/2025Permit IssuedCentury ElectricGeneral Wiring
04/01/2025CompleteEmpire Lic Electrical ContractorsGeneral Wiring
09/27/2024CompleteLTC Electrical ContractingGeneral Wiring
07/02/2024CompleteThe Metro Group ElectricGeneral Wiring
07/01/2024CompleteSoran ElectricalGeneral Wiring
06/13/2024CompleteThe Metro Group ElectricGeneral Wiring
12/02/2023Permit IssuedSoran ElectricalGeneral Wiring
11/04/2023CompleteImr Electrical ContractingGeneral Wiring
09/22/2023CompleteKJK ElectricGeneral Wiring
06/08/2023Permit IssuedOmd Electrical1 meters, 1 new_meters
12/08/2022CompleteThe Metro Group ElectricGeneral Wiring
1 project · most recent 07/20/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
07/20/2026Signed-offSkyline Pro Construction*Tenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
04/15/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/15/2025Pass-Final General Construction Non-Directive 14PassView ↗
12/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/14/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/07/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/30/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
07/17/2026FinalCALVIN TRANprogress
07/17/2026Fire-Resistant Penetrations and JointsDave Wallspecial
07/17/2026Lighting controlsCALVIN TRANenergy_progress
07/17/2026Lighting in dwelling unitsCALVIN TRANenergy_progress
06/09/2025PreliminaryChristian Meszarosprogress
06/09/2025Tenant Protection Plan ComplianceChristian Meszarosspecial
06/09/2025HVAC-R and service water piping design and insulationChristian Meszarosenergy_progress
06/09/2025HVAC-R and service water heating equipmentChristian Meszarosenergy_progress
06/09/2025Maintenance informationChristian Meszarosenergy_progress
06/09/2025HVAC-R and service water heating system controlsChristian Meszarosenergy_progress
06/09/2025Post-installed AnchorsChristian Meszarosspecial
06/09/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsChristian Meszarosspecial
06/09/2025Tenant Protection Plan ComplianceChristian Meszarosspecial
06/09/2025Heating SystemsChristian Meszarosspecial
06/09/2025Post-installed AnchorsChristian Meszarosspecial
06/09/2025Fire-Resistant Penetrations and JointsChristian Meszarosspecial
06/06/2025FinalChristian Meszarosprogress
06/06/2025Chimneys and ventsChristian Meszarosspecial
06/06/2025Tenant Protection Plan ComplianceChristian Meszarosspecial
06/06/2025Maintenance informationChristian Meszarosenergy_progress
06/06/2025HVAC-R and service water heating equipmentChristian Meszarosenergy_progress
06/06/2025HVAC-R and service water heating system controlsChristian Meszarosenergy_progress
06/06/2025HVAC-R and service water piping design and insulationChristian Meszarosenergy_progress
10/09/2023Fire-Resistant Penetrations and JointsLawrence McDonaldspecial
10/09/2023FinalLawrence McDonaldprogress
Latest 25 of 46.
▾Documents — 633 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch20
09/03/2026M00557388-I1Request digital key ↗
09/02/2026M00637021-I1Request digital key ↗
09/02/2026M00631097-P1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/05/2026M00313802-I1Request digital key ↗
09/03/2026M00391702-P2Request digital key ↗
08/15/2026M00383841-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits98
▸BISPLAN / WORK APPROVAL APPLICATION54
01/27/2022122155915Open ↗
10/25/2021140909729Open ↗
10/04/2021122155915Open ↗
Showing 3 of 54 on file for this type
▸BISWORK PERMIT APPLICATION40
10/06/2022140965114Open ↗
01/14/2022140965114Open ↗
10/06/2021140965114Open ↗
Showing 3 of 40 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
10/25/2019122155915Open ↗
Showing 1 of 2 on file for this type
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
09/23/2020140919102Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
09/23/2020140919102Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISVERIFY TAX LOT1
01/21/2021122155915Open ↗
▸Seals & Professional Certifications129
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION43
04/13/2020123780970Open ↗
02/19/2020140766749Open ↗
10/25/2019123708620Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
09/05/2026M00313802-I1Open ↗
09/04/2026M00383841-I1Open ↗
09/03/2026M00391702-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/02/2026M08019616-I1Open ↗
09/02/2026M08019616-I1Open ↗
09/02/2026M08019616-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/02/2026M08019616-I1Open ↗
09/02/2026M08019616-I1Open ↗
09/02/2026M01237355-S2Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE6
09/09/2020140945878Open ↗
08/11/2020140909729Open ↗
07/02/2020140919102Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
09/13/2021141004838Open ↗
10/13/2020140965114Open ↗
09/09/2020140945878Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
09/13/2021141004838Open ↗
10/13/2020140965114Open ↗
Showing 2 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
09/13/2021141004838Open ↗
10/13/2020140965114Open ↗
Showing 2 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection22
▸BISTENANT PROTECTION PLAN AND NOTES12
10/06/2021140965114Open ↗
10/22/2020140945878Open ↗
08/11/2020140909729Open ↗
Showing 3 of 12 on file for this type
▸BISSTREET TREE CHECKLIST5
07/02/2020140919102Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWTenant Protection Plan4
08/15/2026M00391702-I1Open ↗
08/13/2026M00383841-I1Open ↗
08/13/2026M00313802-I1Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
09/23/2020140919102Open ↗
▸Environmental & Asbestos47
▸BISASBESTOS: CERTIFICATION (DEP ACP5)18
10/13/2020140965114Open ↗
09/23/2020140919102Open ↗
09/09/2020140945878Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/05/2026M00313802-I1Open ↗
09/04/2026M00383841-I1Open ↗
09/02/2026M00715907-I1Open ↗
Showing 3 of 17 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/29/2026M00944689-I1Open ↗
08/13/2026M01237355-S1Open ↗
08/13/2026M01237355-S2Open ↗
▸Energy Compliance56
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS21
04/13/2020123780970Open ↗
02/19/2020140766749Open ↗
10/25/2019123708620Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY14
11/01/2021140909729Open ↗
10/06/2021140965114Open ↗
02/03/2021140919102Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
02/24/2021140919102Open ↗
05/20/2020123780970Open ↗
04/13/2020123780970Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
11/26/2021140909729Open ↗
03/04/2021140887002Open ↗
08/26/2020140905279Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
11/10/2021140909729Open ↗
08/26/2020140905279Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
10/13/2020140965114Open ↗
07/02/2020140919102Open ↗
▸BISLIGHTING IN DWELLING UNITS1
11/10/2021140909729Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
08/11/2020140909729Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY18
06/28/2025140945878Open ↗
06/27/2025140945878Open ↗
11/10/2021140909729Open ↗
Showing 3 of 18 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/20/2021140909729Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/20/2021140909729Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
09/09/2020140945878Open ↗
▸Approvals, Objections & Sign-offs84
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST53
06/30/2025140945878Open ↗
12/22/2021140909729Open ↗
03/04/2021140887002Open ↗
Showing 3 of 53 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
09/27/2021122155915Open ↗
09/13/2021122155915Open ↗
05/03/2021122155915Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
06/30/2025140945878Open ↗
10/06/2022140965114Open ↗
11/07/2019122155915Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSUPERSEDING LETTER4
01/14/2022140965114Open ↗
01/14/2022140965114Open ↗
10/22/2019140766749Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL2
12/20/2021140909729Open ↗
08/26/2020140905279Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership49
▸BISCOST AFFIDAVIT43
06/28/2025140945878Open ↗
06/27/2025140945878Open ↗
06/27/2025140945878Open ↗
Showing 3 of 43 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
11/26/2021140909729Open ↗
03/04/2021140887002Open ↗
08/26/2020140905279Open ↗
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
08/11/2020140909729Open ↗
▸Filing & Intake Forms78
▸BISBOROUGH INTAKE FORM34
10/06/2022140965114Open ↗
01/14/2022140965114Open ↗
05/01/2020122155915Open ↗
Showing 3 of 34 on file for this type
▸BISADDITIONAL INFORMATION20
06/03/2021122155915Open ↗
02/16/2021140887002Open ↗
10/23/2020140945878Open ↗
Showing 3 of 20 on file for this type
▸BISEFILING COVER SHEET15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
09/13/2021141004838Open ↗
10/13/2020140965114Open ↗
09/09/2020140945878Open ↗
Showing 3 of 9 on file for this type
▸Other Documents11
▸DOB NOWDHCR Document4
08/13/2026M01100270-I1Open ↗
08/13/2026M00348152-I1Open ↗
08/13/2026M01100270-S1Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
12/22/2021140909729Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type