💬 Discuss this project
1929Year Built
8Stories
E7Building Class
M3-1Zoning
222,600 sfGross Floor Area
1Units
LL97 Covered0 Active Violations 4 old, status unconfirmed ▸FISP: SAFE
Self-storage warehouse · Owner of record: Ess Prisa · 44,750 sf lot · 4.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsExtra Space3 filings
RoofTemporary supported scaffold installation1p · 2 filings · 8 docs
Floor 2Extra Space1 filing · 17 docs
Floor 1Extra Space5p · 3 filings · 17 docs
BasementExtra Space2p · 1 filing · 10 docs
Sub-BasementExtra Space2 filings · 16 docs
Site & exteriorExtra Space10 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Extra Space Storage4307/08/2026
Ess Prisa2103/22/2026
Storage USA603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GBN Engineering204/18/2023
Robert Zmijewski207/28/2022
Stracar Engineering206/23/2022
B2B Associates606/22/2022
Mulhern Engineers206/20/2022
KZ Engineering205/15/2019
Leon Skvirsky PE805/13/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Bohler Engineering603/21/2026
Stracar Engineering P403/21/2026
Synergy Building Consultants203/21/2026
Building Brothers1603/21/2026
AE Design Solution203/21/2026
Construction Permit Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jayeff ConstructionGeneral Contractor1107/08/2026
Tri Borough ScaffoldingScaffold1007/08/2026
R.G.M. SignsSign hanger510/04/2026
National MaintenanceSign hanger307/08/2026
A Cell CommunicationsGeneral Contractor203/21/2026
Henry Myers Plumbing & Hspecialty_contractor203/21/2026
Henry Myers P & HPlumbing107/08/2026
Powerone Elect'l ContractingElectrical103/21/2026
Approved Fire PreventionFire Protection107/08/2026
Douglas PaskorElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GBN Engineering4670204/18/2023
Stracar Special Inspectio229206/23/2022
B2 Engineering5433606/22/2022
Aks Architectural & Engineering1957206/20/2022
Building Lifecycle
All (166)Filed (25)Permit Issued (27)Signed Off (4)Facade (FISP) (15)Violation (60)Inspection (5)Objection (2)Special Inspection (28)
04/15/2026
Signed off — Alteration
HVAC MODIFICATIONS AND ASSOCIATED DUCT WORK AS PER PLANS FILED HEREWITH. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY
X00501306-I1
03/09/2026
Signed off — Alteration
X00466322-I1
07/26/2024
Permit issued — Suspended Scaffold
X01084405-I1-SC
07/22/2024
Filed — Alteration
Renewal of SR 19/2875
X01084405-I1
07/02/2024
Permit issued — General Construction
X00772009-I1-GC
06/06/2024
Cycle 9 facade report submitted
06/06/2024
Cycle 9 facade report signed — SAFE
04/25/2024
Cycle 9 facade inspection completed
04/15/2024
Signed off — Alteration
X00785589-I1
01/16/2024
Violation issued (ECB, closed)
Local Law
05/12/2023
Permit issued — General Construction
X00772009-I1-GC
04/18/2023
Filed — Alteration
X00785589-P1
04/13/2023
Signed off — Alteration
HVAC modification and associated ductwork as per plans. There will be no change in use, egress, or occupancy.
X00724262-I1
11/15/2022
Permit issued — Mechanical Systems
X00501306-I1-MS
10/24/2022
Permit issued — Antenna
X00785589-I1-AN
10/17/2022
Permit issued — General Construction
X00466322-I1-GC
09/19/2022
Permit issued — General Construction
X00772009-I1-GC
09/16/2022
Permit issued — Mechanical Systems
X00724262-I1-MS
08/24/2022
Filed — Alteration
X00785589-I1
08/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/19/2022
Cycle 9 facade report submitted
08/19/2022
Cycle 9 facade report signed — UNSAFE
08/19/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/28/2022
Filed — Alteration
X00772009-I1
07/22/2022
Cycle 9 facade inspection completed
06/27/2022
Special inspection requirement — Sprinkler Systems
MIRO Stracar
06/23/2022
Filed — Alteration
ADDITIONAL SPRINKLER COVERAGE PER SHEET METAL STORAGE CUBICALS
X00653713-P1
06/23/2022
Special inspection requirement — Final
Giuseppe Anzalone
06/23/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Giuseppe Anzalone
06/23/2022
Special inspection requirement — HVAC-R and service water heating equipment
Giuseppe Anzalone
06/23/2022
Special inspection requirement — HVAC-R and service water heating system controls
Giuseppe Anzalone
06/23/2022
Special inspection requirement — Mechanical Systems
Giuseppe Anzalone
06/22/2022
Filed — Alteration
HVAC modification and associated ductwork as per plans. There will be no change in use, egress, or occupancy.
X00724262-P1
06/22/2022
Special inspection requirement — HVAC-R and service water heating system controls
Brian Bercarich
06/22/2022
Special inspection requirement — Sprinkler Systems
MIRO Stracar
06/22/2022
Special inspection requirement — Mechanical Systems
Brian Bercarich
06/22/2022
Special inspection requirement — Final
Brian Bercarich
06/22/2022
Special inspection requirement — Energy Code Compliance Inspections
Brian Bercarich
06/22/2022
Special inspection requirement — HVAC-R and service water heating equipment
Brian Bercarich
06/21/2022
Special inspection requirement — HVAC-R and service water heating equipment
Brian Bercarich
06/21/2022
Special inspection requirement — Mechanical Systems
Brian Bercarich
06/21/2022
Special inspection requirement — Energy Code Compliance Inspections
Brian Bercarich
06/21/2022
Special inspection requirement — Final
Brian Bercarich
06/21/2022
Special inspection requirement — HVAC-R and service water heating system controls
Brian Bercarich
06/20/2022
Filed — Alteration
HVAC MODIFICATIONS AND ASSOCIATED DUCT WORK AS PER PLANS FILED HEREWITH. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY
X00501306-P1
05/09/2022
Filed — Alteration
HVAC modification and associated ductwork as per plans. There will be no change in use, egress, or occupancy.
X00724262-I1
03/10/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/09/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/08/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/07/2022
Special inspection requirement — Mechanical Systems
Brian Bercarich
03/07/2022
Special inspection requirement — Heating Systems
Brian Bercarich
03/07/2022
Special inspection requirement — Final
Brian Bercarich
03/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Brian Bercarich
03/04/2022
Filed — Alteration
Installation of gas fired unit heaters, gas riser, and associated gas piping. No change in use, egress, or occupancy.
X00641035-P1
03/04/2022
Filed — Alteration
Installation of gas fired unit heaters. No change in use, egress, or occupancy.
X00641173-P1
03/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Brian Bercarich
03/02/2022
Special inspection requirement — Heating Systems
Brian Bercarich
03/02/2022
Special inspection requirement — Final
Brian Bercarich
03/02/2022
Special inspection requirement — Mechanical Systems
Brian Bercarich
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 166 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedMC Superstructure07/26/2024
DOB NOWGeneral ConstructionPermit IssuedJayeff Construction07/02/2024
DOB NOWGeneral ConstructionPermit IssuedJayeff Construction05/12/2023
DOB NOWMechanical SystemsSigned-offJayeff Construction11/15/2022
DOB NOWAntennaSigned-offA Cell Communications10/24/2022
DOB NOWGeneral ConstructionSigned-offJayeff Construction10/17/2022
DOB NOWGeneral ConstructionPermit IssuedJayeff Construction09/19/2022
DOB NOWMechanical SystemsSigned-offJayeff Construction09/16/2022
DOB NOWSprinklersSigned-offApproved Fire Prevention01/14/2022
DOB NOWMechanical SystemsPermit IssuedHenry Myers Plumbing H12/07/2021
DOB NOWPlumbingSigned-offHenry Myers P & H12/06/2021
DOB NOWMechanical SystemsSigned-offJayeff Construction04/27/2021
DOB NOWGeneral ConstructionSigned-offJayeff Construction04/09/2021
DOB NOWSupported ScaffoldPermit IssuedTri Borough Scaffolding04/07/2020
DOB NOWSidewalk ShedPermit IssuedTri Borough Scaffolding04/02/2020
DOB NOWSignPermit IssuedNational Maintenance10/23/2019
DOB NOWSignPermit IssuedNational Maintenance10/23/2019
DOB NOWSignPermit IssuedNational Maintenance10/23/2019
DOB NOWSignPermit IssuedR.G.M. Signs10/22/2019
DOB NOWSignPermit IssuedR.G.M. Signs10/22/2019
DOB NOWSignPermit IssuedR.G.M. Signs10/22/2019
DOB NOWSignPermit IssuedR.G.M. Signs10/22/2019
DOB NOWSignPermit IssuedR.G.M. Signs10/22/2019
DOB NOWSidewalk ShedPermit IssuedTri Borough Scaffolding05/15/2019
DOB NOWSupported ScaffoldPermit IssuedTri Borough Scaffolding03/29/2019
DOB NOWSupported ScaffoldPermit IssuedTri Borough Scaffolding11/27/2018
DOB NOWSupported ScaffoldPermit IssuedTri Borough Scaffolding10/05/2018
BISOTISSUEDJayeff Construction10/05/2022
BISOTISSUEDJayeff Construction04/13/2021
BISOTISSUEDJayeff Construction04/13/2021
BISOTISSUEDJayeff Construction04/01/2021
BISOTISSUEDJayeff Construction10/30/2020
BISOTISSUEDJayeff Construction10/30/2020
BISOTISSUEDJayeff Construction04/15/2019
BISOTISSUEDJayeff Construction04/15/2019
BISSPISSUEDApproved Fire Prevention03/16/2019
BISEQISSUEDEverest Scaffolding01/16/2019
BISOTISSUEDJayeff Construction09/21/2018
BISOTISSUEDJayeff Construction09/21/2018
BISMHISSUEDRC3 Electric02/26/2018
+ 22 more permits on file
1 project · most recent 03/04/2022
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
03/04/2022Permit IssuedHenry Myers Plumbing & HHeating Systems
Heating
Reznor UDX-150 150,000 BTU · Unit Heater ×30
UDC-150 150,000 BTU · Unit Heater ×8
UDX-120 120,000 BTU · Unit Heater ×4
UDX-45 45,000 BTU · Unit Heater ×2
Modine PV100 100,000 BTU · Unit Heater ×4
PV250 250,000 BTU · Unit Heater ×4
1 project · most recent 06/23/2022
FiledStatusContractorScope
06/23/2022Signed-offApproved Fire Prev46 heads
1 project · most recent 03/04/2022
Gas
FiledStatusContractorScope
03/04/2022Signed-offHenry Myers P & HGas
15 projects · most recent 06/26/2026
General Wiring Lighting
FiledStatusContractorScope
06/26/2026CompleteDouglas PaskorGeneral Wiring
08/26/2022CompletePowerone Elect'l Contracting1 meters, 1 new_meters
03/23/2022CompleteDouglas PaskorGeneral Wiring
10/07/2021Permit IssuedIlluminations Unlmtd ElectricGeneral Wiring
11/24/2019Permit IssuedRainbow Electric Co—
11/24/2019Permit IssuedRainbow Electric Co—
11/24/2019Permit IssuedRainbow Electric Co—
11/24/2019Permit IssuedRainbow Electric Co—
11/24/2019Permit IssuedRainbow Electric Co—
11/24/2019Permit IssuedRainbow Electric Co—
11/24/2019Permit IssuedRainbow Electric Co—
10/28/2019CompleteDouglas PaskorGeneral Wiring, Lighting
05/14/2019CompleteNash Electric Services—
04/12/2019Permit IssuedDouble "R" Electrical Contracting3 meters, 2 new_meters
12/27/2018CompleteDouglas PaskorGeneral Wiring
2 projects · most recent 05/15/2019
Sidewalk Shed Scaffold
FiledStatusContractorScope
05/15/2019Permit IssuedTri Borough ScaffoldingSidewalk Shed
10/04/2018Permit IssuedTri Borough ScaffoldingScaffold
1 project · most recent 07/22/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
07/22/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
06/27/2022Sprinkler SystemsMIRO Stracarspecial
06/23/2022FinalGiuseppe Anzaloneprogress
06/23/2022HVAC-R and service water piping design and insulationGiuseppe Anzaloneenergy_progress
06/23/2022HVAC-R and service water heating equipmentGiuseppe Anzaloneenergy_progress
06/23/2022HVAC-R and service water heating system controlsGiuseppe Anzaloneenergy_progress
06/23/2022Mechanical SystemsGiuseppe Anzalonespecial
06/22/2022HVAC-R and service water heating system controlsBrian Bercarichenergy_progress
06/22/2022Sprinkler SystemsMIRO Stracarspecial
06/22/2022Mechanical SystemsBrian Bercarichspecial
06/22/2022FinalBrian Bercarichprogress
06/22/2022Energy Code Compliance InspectionsBrian Bercarichprogress
06/22/2022HVAC-R and service water heating equipmentBrian Bercarichenergy_progress
06/21/2022HVAC-R and service water heating equipmentBrian Bercarichenergy_progress
06/21/2022Mechanical SystemsBrian Bercarichspecial
06/21/2022Energy Code Compliance InspectionsBrian Bercarichprogress
06/21/2022FinalBrian Bercarichprogress
06/21/2022HVAC-R and service water heating system controlsBrian Bercarichenergy_progress
03/07/2022Mechanical SystemsBrian Bercarichspecial
03/07/2022Heating SystemsBrian Bercarichspecial
03/07/2022FinalBrian Bercarichprogress
03/07/2022Fire-Resistant Penetrations and JointsBrian Bercarichspecial
03/04/2022Fire-Resistant Penetrations and JointsBrian Bercarichspecial
03/02/2022Heating SystemsBrian Bercarichspecial
03/02/2022FinalBrian Bercarichprogress
03/02/2022Mechanical SystemsBrian Bercarichspecial
Latest 25 of 28.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Extra SpaceIndustrial / WarehouseSub-basement, Floors 1–8, Roof
Project X00772009 Alteration · Permit Entire · 07/28/2022
Project X00724262 Alteration · LOC Issued · 05/09/2022
Project X00641035 Alteration · Permit Entire · 12/02/2021
Project X00641173 Alteration · Permit Entire · 12/02/2021
Project X00501306 Alteration · LOC Issued · 04/19/2021
Project X00466322 Alteration · LOC Issued · 04/05/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 369 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch15
08/26/2026X00084699-I1Request digital key ↗
08/24/2026X00653713-I1Request digital key ↗
08/24/2026X00653713-P1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Sign8
08/26/2026X00135027-I1Request digital key ↗
08/26/2026X00135043-I1Request digital key ↗
08/26/2026X00135040-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00166641-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/25/2026X00466322-I1Request digital key ↗
▸Applications & Permits73
▸BISPLAN / WORK APPROVAL APPLICATION55
01/21/2026240297282Open ↗
11/22/2022200299266Open ↗
11/17/2022200299266Open ↗
Showing 3 of 55 on file for this type
▸BISWORK PERMIT APPLICATION18
10/13/2022240297282Open ↗
04/01/2021240297282Open ↗
04/15/2019220636925Open ↗
Showing 3 of 18 on file for this type
▸Seals & Professional Certifications89
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION25
11/20/2019240249931Open ↗
11/20/2019240249931Open ↗
07/29/2019220356442Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/26/2026X00084699-I1Open ↗
08/26/2026X00135035-I1Open ↗
08/26/2026X00135027-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/23/2026X00135040-I1Open ↗
09/01/2026X00641173-P1Open ↗
09/01/2026X00135047-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026X00641173-P1Open ↗
09/01/2026X00641173-P1Open ↗
09/01/2026X00724262-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
12/17/2020240297282Open ↗
03/12/2019240249931Open ↗
06/20/2017220602284Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
12/17/2020240297282Open ↗
03/12/2019240249931Open ↗
04/26/2016240140156Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
12/17/2020240297282Open ↗
03/12/2019240249931Open ↗
04/26/2016240140156Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/20/2017220602284Open ↗
▸Trade Schedules & Equipment16
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
11/25/2019240249931Open ↗
09/03/2019240249931Open ↗
08/30/2019240249931Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING2
03/12/2019240249931Open ↗
04/26/2016240140156Open ↗
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER (SP) SIGNOFF1
07/20/2020240249931Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
09/14/2020220246428Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
08/18/2017220611808Open ↗
▸Environmental & Asbestos32
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
08/26/2026X00135027-I1Open ↗
08/26/2026X00135043-I1Open ↗
08/26/2026X00135040-I1Open ↗
Showing 3 of 22 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
12/17/2020240297282Open ↗
03/12/2019240249931Open ↗
09/01/2017220611808Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP FORM V5 - ASBESTOS VARIANCE1
09/26/2018220636925Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORM PRIOR TO SIGN OFF: TRU5009BX181
11/20/2020220636925Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
07/29/2019220356442Open ↗
04/06/2018220636925Open ↗
08/18/2017220611808Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
07/29/2019220356442Open ↗
04/26/2017240140156Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/17/2020240297282Open ↗
04/26/2016240140156Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00501306-I1Open ↗
08/13/2026X00724262-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/21/2022220636925Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/26/2016240140156Open ↗
▸BISNYCECC ANALYSIS1
12/17/2020240297282Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00724262-I1Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY10
04/13/2022220636925Open ↗
07/21/2021200580861Open ↗
07/21/2021200580861Open ↗
Showing 3 of 10 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19753
05/13/2021201101495Open ↗
05/13/2021201101486Open ↗
05/13/2021201101477Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
03/12/2019240249931Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/06/2022220356442Open ↗
▸BISHYDRO FLOW TEST LETTER1
03/12/2019240249931Open ↗
▸Approvals, Objections & Sign-offs34
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
01/21/2022220356442Open ↗
07/21/2021200580861Open ↗
05/13/2021201101495Open ↗
Showing 3 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
06/15/2021200580861Open ↗
04/23/2021200580861Open ↗
04/23/2021200580861Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
05/16/2018220647343Open ↗
▸BISFINAL1
06/21/2022220636925Open ↗
▸Cost, Insurance & Ownership25
▸BISCOST AFFIDAVIT20
05/13/2021201101477Open ↗
12/17/2020240297282Open ↗
09/24/2020220246428Open ↗
Showing 3 of 20 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
06/21/2022220636925Open ↗
05/13/2021201101495Open ↗
05/13/2021201101486Open ↗
Showing 3 of 4 on file for this type
▸BISLL58/88-CIVIL PENALTY AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms26
▸BISEFILING COVER SHEET9
05/16/2018220647343Open ↗
04/06/2018220636925Open ↗
04/06/2018220636925Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM7
09/03/2019240249931Open ↗
08/30/2019240249931Open ↗
08/15/2019240249931Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION6
06/10/2022220636925Open ↗
08/23/2019240249931Open ↗
10/15/2018220636925Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
12/17/2020240297282Open ↗
03/12/2019240249931Open ↗
Showing 2 of 4 on file for this type
▸Other Documents13
▸DOB NOWFlood Hazard Area Substantial Improvement Calculation8
08/13/2026X00135027-I1Open ↗
08/13/2026X00135040-I1Open ↗
08/13/2026X00135047-I1Open ↗
Showing 3 of 8 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
04/26/2016240140156Open ↗
Showing 1 of 2 on file for this type
▸BISPLOT DIAGRAM1
05/16/2018220647343Open ↗
▸DOB NOWCalculations1
08/13/2026X01084405-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01084405-I1Open ↗