← Back
BuildNYC
Extended stay / suite - apartment-like amenities
Parc Vendome Condominium
330 EAST 56TH STREET · BIN 1039974
💬 Discuss this project
1900Year Built
17Stories
HSBuilding Class
R8Zoning
186,000 sfGross Floor Area
77Units
LL97 CoveredRent Stabilized1 Active Violation ▸FISP: SWARMP
Extended stay / suite - apartment-like amenities · Owner of record: Metropolitan Sutton Associates · 7,932 sf lot · 23.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofPipe scaffolding and heavy duty sidewalk shedUnder Construction2p · 2 filings · 12 docs
Floor 14Pipe scaffolding and heavy duty sidewalk shedUnder Construction1p · 1 filing · 6 docs
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Heavy duty sidewalk shed installation4p · 1 filing · 3 docs
CellarReplacement of 2 existing gas fired boilersUnder Construction1 filing · 4 docs
Site & exteriorMetropolitan Sutton AUnder Construction13p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Metropolitan Sutton Associates2803/22/2026
Sutton Place Capital Partners903/21/2026
Parc Vendome Condominium103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A Tech Engineering NYC110/08/2026
Ashraf205/18/2026
Paul Perdek, Prof. Engineering111/01/2023
Mje Professional Services210/30/2023
Lawless & Mangione110/06/2023
Enthink Engineers103/02/2023
Tohfaz Uddin PE101/16/2018
Joel Phagoo P.E111/20/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 Expediting Service603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dynamic InstallationScaffold1310/04/2026
Reliable EnterprisesScaffold1203/21/2026
Arsenal ScaffoldScaffold409/18/2026
AM&G WaterproofingScaffold203/21/2026
Reliable Plumbing & HeatingPlumbing110/20/2026
AM&G Waterproofingspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738110/08/2026
Metric Consulting and Ins1803110/06/2023
Building Lifecycle
All (121)Filed (11)Permit Issued (18)Signed Off (7)Facade (FISP) (16)Violation (60)Special Inspection (9)
10/19/2026
Permit issued — Boiler Equipment
M01459091-I1-BE
10/08/2026
Filed — Alteration
DIRECT REPLACEMENT OF (2) EXISTING GAS FIRED BOILERS
M01459091-I1
09/17/2026
Permit issued — Sidewalk Shed
M01378984-I1-SH
09/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
anthony santoro
06/23/2026
Permit issued — Supported Scaffold
M01378984-I1-SH
05/18/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AND HEAVY DUTY SIDEWALK SHED AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01378984-P1
03/27/2026
Permit issued — Sidewalk Shed
M01378984-I1-SH
03/27/2026
Permit issued — Supported Scaffold
M01378984-I1-SF
03/26/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AND HEAVY DUTY SIDEWALK SHED AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01378984-I1
06/04/2025
Violation issued (HPD, closed)
A
11/22/2024
Violation issued (HPD, closed)
I
10/08/2024
Signed off — Alteration
MATERIAL HOIST
M01099981-I1
08/26/2024
Permit issued — Suspended Scaffold
M01099981-I1-SC
08/21/2024
Filed — Alteration
MATERIAL HOIST
M01099981-I1
04/22/2024
Signed off — Alteration
INSTALLATION OF 600# TO 1000# CAPACITY MATERIAL ONLY HOISTS AS PER DRAWINGS. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00951746-I1
04/01/2024
Violation issued (HPD, closed)
A
03/11/2024
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00939460-I1
03/11/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00837006-I1
02/29/2024
Cycle 9 facade report signed — SWARMP
02/09/2024
Cycle 9 facade report submitted
02/08/2024
Signed off — Alteration
Filing for facade repairs as per plans filed here with. No change in use occupancy or egress.
M00910775-I1
02/01/2024
Cycle 9 facade inspection completed
11/28/2023
Permit issued — Sidewalk Shed
M00837006-I1-SH
11/28/2023
Permit issued — Supported Scaffold
M00939460-I1-SF
11/15/2023
Violation issued (HPD, closed)
I
11/13/2023
Permit issued — General Construction
M00910775-I1-GC
11/01/2023
Filed — Alteration
INSTALLATION OF 600# TO 1000# CAPACITY MATERIAL ONLY HOISTS AS PER DRAWINGS. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00951746-I1
11/01/2023
Permit issued — Protection and Mechanical Methods
M00951746-I1-PMM
10/30/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00939460-P1
10/11/2023
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
10/11/2023
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
10/06/2023
Filed — Alteration
Filing for facade repairs as per plans filed here with. No change in use occupancy or egress.
M00910775-I1
09/27/2023
Permit issued — Supported Scaffold
M00939460-I1-SF
09/26/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00939460-I1
08/24/2023
Special inspection requirement — Masonry
SAMI HAJJAR P.E
08/24/2023
Special inspection requirement — Energy Code Compliance Inspections
William Struth
08/24/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
07/27/2023
Special inspection requirement — Final
William Struth
06/15/2023
Cycle 9 facade report signed — UNSAFE
03/03/2023
Permit issued — Sidewalk Shed
M00837006-I1-SH
03/02/2023
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00837006-I1
02/21/2023
Cycle 9 facade report submitted
02/21/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/08/2023
Cycle 9 facade inspection completed
12/16/2022
Violation issued (HPD, closed)
A
12/16/2022
Violation issued (HPD, closed)
A
12/16/2022
Violation issued (HPD, closed)
A
12/16/2022
Violation issued (HPD, closed)
A
12/16/2022
Violation issued (HPD, closed)
C
12/16/2022
Violation issued (HPD, closed)
A
12/16/2022
Violation issued (HPD, closed)
A
12/16/2022
Violation issued (HPD, open)
A
02/15/2022
Violation issued (HPD, closed)
A
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/28/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/28/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/01/2021
Violation issued (HPD, closed)
A
02/07/2019
Cycle 8 facade report submitted
02/04/2019
Violation issued (ECB, closed)
Local Law
01/04/2019
Cycle 8 facade inspection completed
Latest 60 of 121 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedReliable Plumbing & Heating10/19/2026
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold09/17/2026
DOB NOWSupported ScaffoldPermit IssuedArsenal Scaffold06/23/2026
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold03/27/2026
DOB NOWSupported ScaffoldPermit IssuedArsenal Scaffold03/27/2026
DOB NOWSuspended ScaffoldSigned-offRosenwach Tank Co08/26/2024
DOB NOWSidewalk ShedSigned-offReliable Enterprises11/28/2023
DOB NOWSupported ScaffoldSigned-offReliable Enterprises11/28/2023
DOB NOWGeneral ConstructionSigned-offAM&G Waterproofing11/13/2023
DOB NOWProtection and Mechanical MethodsSigned-offAM&G Waterproofing11/01/2023
DOB NOWSupported ScaffoldSigned-offReliable Enterprises09/27/2023
DOB NOWSidewalk ShedSigned-offReliable Enterprises03/03/2023
DOB NOWSupported ScaffoldSigned-offDynamic Installation07/05/2018
DOB NOWSidewalk ShedSigned-offDynamic Installation02/12/2018
DOB NOWSupported ScaffoldSigned-offDynamic Installation02/12/2018
DOB NOWSupported ScaffoldSigned-offDynamic Installation01/16/2018
DOB NOWSidewalk ShedSigned-offDynamic Installation12/18/2017
DOB NOWSidewalk ShedSigned-offDynamic Installation11/21/2017
BISEQISSUEDDynamic Installation05/23/2018
BISOTISSUEDAM&G Waterproofing04/24/2018
BISEQISSUEDAM&G Waterproofing04/16/2018
BISOTISSUEDAM&G Waterproofing02/16/2018
BISPLISSUEDFlint Mechanical09/04/2015
BISMHISSUED94th Street Construction05/21/2015
BISMHISSUED94th Street Construction05/12/2015
BISPLISSUEDFlint Mechanical04/08/2015
BISMHISSUED94th Street Construction03/03/2015
BISSDISSUEDNYC Plumbing & Heating08/08/2014
BISMHISSUEDMechanical Technologies01/22/2013
BISMHISSUEDPower Air Cond07/18/2011
BISSPISSUEDKG Sprinkler06/30/2011
BISPLISSUEDColbren Plumbing & Heating06/30/2011
BISOTISSUEDCertified of N.Y03/30/2011
BISOTISSUEDCertified of N.Y01/26/2011
BISEQISSUEDRockledge Scaffold05/28/2009
BISOTISSUEDAwr Group03/25/2009
BISEQISSUEDRockledge Scaffold12/01/2008
BISMHISSUEDSutton Construction Management03/20/2006
BISOTISSUEDSutton Construction Management03/20/2006
BISOTISSUEDSutton Constuction Management02/13/2006
+ 19 more permits on file
2 projects · most recent 03/26/2026
FiledStatusContractorScope
03/26/2026Permit IssuedSolas Electrical—
03/03/2023CompleteRichard Neu—
1 project · most recent 05/18/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
05/18/2026Permit IssuedArsenal ScaffoldScaffold, Sidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
09/17/2026Tenant Protection Plan Complianceanthony santorospecial
10/11/2023Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
10/11/2023Post-installed AnchorsSAMI HAJJAR P.Especial
08/24/2023MasonrySAMI HAJJAR P.Especial
08/24/2023Energy Code Compliance InspectionsWilliam Struthprogress
08/24/2023Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
07/27/2023FinalWilliam Struthprogress
01/09/2018FinalMD TOHFAZ UDDINprogress
11/20/2017FinalJOEL PHAGOOprogress
▾Documents — 291 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/06/2026M00002793-I1Request digital key ↗
09/06/2026M00010204-I1Request digital key ↗
08/31/2026M00837006-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits57
▸BISPLAN / WORK APPROVAL APPLICATION35
10/05/2018123109590Open ↗
05/22/2018140765063Open ↗
04/13/2018140757170Open ↗
Showing 3 of 35 on file for this type
▸BISWORK PERMIT APPLICATION20
05/22/2018140765063Open ↗
05/01/2018123109590Open ↗
04/13/2018140757170Open ↗
Showing 3 of 20 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
06/16/2011120590128Open ↗
Showing 1 of 2 on file for this type
▸Seals & Professional Certifications68
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION27
03/15/2019140765063Open ↗
11/21/2018123109590Open ↗
11/21/2018123109590Open ↗
Showing 3 of 27 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
01/10/2018123340205Open ↗
07/24/2015122455814Open ↗
03/09/2015122287364Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
10/13/2026M01459091-I1Open ↗
09/06/2026M00002793-I1Open ↗
09/06/2026M00010204-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
04/03/2013121528837Open ↗
01/24/2013121501785Open ↗
03/29/2011120644062Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
05/22/2018140765063Open ↗
04/13/2018140757170Open ↗
01/10/2018123340205Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026M00010204-I1Open ↗
08/25/2026M00910775-I1Open ↗
08/24/2026M00002793-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
05/22/2018140765063Open ↗
04/13/2018140757170Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
05/22/2018140765063Open ↗
04/13/2018140757170Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
10/13/2026M01459091-I1Open ↗
08/25/2026M00910775-I1Open ↗
▸Trade Schedules & Equipment27
▸BISSELF-CERT PLUMBING NOTICE8
05/12/2015122287364Open ↗
02/03/2015121528837Open ↗
11/28/2014121528837Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
04/01/2016122287364Open ↗
03/24/2016122287364Open ↗
01/07/2016122287364Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING4
04/03/2013121528837Open ↗
10/28/2011120644062Open ↗
08/08/2011120644062Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
01/24/2013121501785Open ↗
08/08/2011120644062Open ↗
08/08/2011120644062Open ↗
▸BISSPRINKLER INSP REPORT : FP-852
01/11/2012120644062Open ↗
01/11/2012120644062Open ↗
▸BISSTANDPIPE INSP REPORT : FP-841
02/03/2015121528837Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
07/23/2013120943934Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
01/24/2013121501785Open ↗
▸Safety & Tenant Protection22
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist10
10/13/2026M01459091-I1Open ↗
09/06/2026M00002793-I1Open ↗
09/06/2026M00010204-I1Open ↗
Showing 3 of 10 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST7
05/22/2018140765063Open ↗
04/13/2018140757170Open ↗
02/16/2018123109590Open ↗
Showing 3 of 7 on file for this type
▸BISTenant Protection Plan and Notes4
01/10/2018123340205Open ↗
09/01/2017123109590Open ↗
05/22/2018140765063Open ↗
Showing 3 of 4 on file for this type
▸BISHPD-1 - Anti-Harassment Area Checklist1
03/31/2011120644062Open ↗
▸Environmental & Asbestos13
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
01/10/2012120943934Open ↗
03/29/2011120644062Open ↗
01/10/2012120943934Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
09/01/2017123109590Open ↗
07/24/2015122455814Open ↗
03/09/2015122287364Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
10/13/2026M01459091-I1Open ↗
09/06/2026M00010204-I1Open ↗
08/13/2026M00910775-I1Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
11/21/2018123109590Open ↗
09/01/2017123109590Open ↗
03/15/2016122287364Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
07/01/2011120644062Open ↗
07/01/2011120644062Open ↗
03/29/2011120644062Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
11/21/2018123109590Open ↗
03/15/2016122287364Open ↗
12/03/2013121501785Open ↗
▸BISTR8: Energy Code Progress Inspections1
07/01/2011120644062Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
05/22/2018140765063Open ↗
04/13/2018140757170Open ↗
▸Approvals, Objections & Sign-offs28
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
03/15/2019140765063Open ↗
11/21/2018123109590Open ↗
11/08/2018140757170Open ↗
Showing 3 of 16 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
01/10/2012120943934Open ↗
03/29/2011120644062Open ↗
Showing 2 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
11/21/2018123109590Open ↗
03/08/2012120644062Open ↗
Showing 2 of 6 on file for this type
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT18
11/21/2018123109590Open ↗
11/01/2018123109590Open ↗
01/10/2018123340205Open ↗
Showing 3 of 18 on file for this type
▸Filing & Intake Forms30
▸BISEFILING COVER SHEET13
01/10/2018123340205Open ↗
09/01/2017123109590Open ↗
07/24/2015122455814Open ↗
Showing 3 of 13 on file for this type
▸BISADDITIONAL INFORMATION8
11/01/2018123109590Open ↗
09/22/2015122455814Open ↗
10/27/2014121528837Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM4
03/15/2019140765063Open ↗
11/21/2018123109590Open ↗
11/08/2018140757170Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
05/22/2018140765063Open ↗
04/13/2018140757170Open ↗
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST2
03/09/2015122287364Open ↗
Showing 1 of 2 on file for this type
▸BISSRO INTAKE FORM(SRO1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026M01099981-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01099981-I1Open ↗