1931Year Built
5Stories
R4Building Class
R6BZoning
34,201 sfGross Floor Area
51Units
LL97 CoveredRent Stabilized2 Open Violations ▸FDNY Report ↗
Condo, residential unit in elevator building · Owner of record: RIVERA COURT CONDOMINIUM · 13,100 sf lot · 2.61 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire ProtectionOther
Floor 16p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RIVERA COURT CONDOMINIUM1103/22/2026
IMPACT REAL ESTATE MGT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION603/21/2026
BMB BUILDING CONSULTING1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AZM HOME IMPROVEMENTS INCGeneral Contractor203/21/2026
CNS CONSTRUCTION INCGeneral Contractor207/08/2026
POTCHIN MOSHEElectrical103/21/2026
RIVIERA ELECTRIC CORPElectrical103/22/2026
AQUA PLUMBING & HTNG CORPPlumbing107/08/2026
HIGH QUALITY ELECTRIC OFElectrical103/22/2026
GREGG NY PLUMBING, INCPlumbing107/08/2026
MOSHE POTCHINElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN SPECIAL ENGINEERING2018410/09/2023
STUDIO NYANDAK ARCHITECTU8378107/31/2023
ETNA CONSULTING STRUCTURA8263105/23/2023
JACK GREEN ASSOCIATES422105/12/2023
Building Lifecycle
All (78)Filed (8)Permit Issued (5)Signed Off (5)Violation (10)Inspection (6)Objection (22)Special Inspection (22)
10/29/2024
Violation issued (FDNY_ORDER, closed)
09/12/2024
Signed off — Alteration
NEW STEEL FRAMING TO BE INSTALLED AT THE CEILING OF THE BASEMENT (1ST FLOOR LEVEL) TO ENLARGE EXISTING STAIR OPENING.
B00873754-S1
07/10/2024
Signed off — Alteration
NEW STEEL FRAMING TO BE INSTALLED AT THE CEILING OF THE BASEMENT (1ST FLOOR LEVEL) TO ENLARGE EXISTING STAIR OPENING.
B00873754-I1
07/10/2024
Signed off — Alteration
NEW STEEL FRAMING TO BE INSTALLED AT THE CEILING OF THE BASEMENT (1ST FLOOR LEVEL) TO ENLARGE EXISTING STAIR OPENING.
B00873754-S2
01/10/2024
Signed off — Alteration
PROPOSE PLUMBING WORKS TO COMBINE APARTMENT UNITS 1H AND 1I PER TPPN#3/97. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00787098-I1
01/08/2024
Signed off — Alteration
PROPOSE TO COMBINE APARTMENT UNITS 1H AND 1I AS PER TPPN#3/97, WORK INCLUDES MINOR PARTITIONS, AND FINISH WORK AS PER PLAN. PLUMBING APPLICATION FILED UNDER SEPARATE. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00786090-I1
01/08/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/08/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/15/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/07/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
William Ryan
10/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
10/17/2023
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
10/16/2023
Objection resolved — Addressed
10/09/2023
Filed — Alteration
PROPOSE PLUMBING WORKS TO COMBINE APARTMENT UNITS 1H AND 1I PER TPPN#3/97. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00787098-P2
10/03/2023
Objection raised — Other
09/29/2023
Filed — Alteration
PROPOSE TO COMBINE APARTMENT UNITS 1H AND 1I AS PER TPPN#3/97, WORK INCLUDES MINOR PARTITIONS, AND FINISH WORK AS PER PLAN. PLUMBING APPLICATION FILED UNDER SEPARATE. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00786090-P2
09/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
09/28/2023
Special inspection requirement — Final
David Cunningham
09/28/2023
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
09/28/2023
Special inspection requirement — Fire-Resistance Rated Construction
William Ryan
09/28/2023
Special inspection requirement — Interior lighting power
William Ryan
09/14/2023
Objection resolved — Addressed
09/13/2023
Permit issued — Plumbing
B00787098-I1-PL
09/11/2023
Permit issued — General Construction
B00786090-I1-GC
09/11/2023
Objection resolved — Addressed
08/31/2023
Objection resolved — Addressed
08/31/2023
Objection resolved — Addressed
08/31/2023
Objection resolved — Addressed
08/31/2023
Objection resolved — Addressed
08/31/2023
Objection resolved — Addressed
08/31/2023
Objection resolved — Addressed
08/31/2023
Objection resolved — Addressed
08/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/01/2023
Objection raised — Other
08/01/2023
Objection raised — Other
08/01/2023
Objection raised — Other
08/01/2023
Objection raised — Other
08/01/2023
Objection raised — Other
08/01/2023
Objection raised — Other
08/01/2023
Objection raised — Other
08/01/2023
Objection raised — Other
08/01/2023
Objection raised — Admin
07/31/2023
Filed — Alteration
PROPOSE STRUCTURAL WORK TO INSTALL NEW BEAM AT 1ST FLOOR CEILING LEVEL (2ND FLOOR FRAMING LEVEL) TO ALLOW FOR REMOVAL OF THE WALL AND DEMOLISH THE WALL AS SHOWN ON THE PLAN. THIS IS IN CONJUNCTION WITH ARCH DESIGN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B00847202-I1
06/05/2023
Permit issued — Plumbing
B00873754-S2-PL
05/31/2023
Permit issued — Structural
B00873754-S1-ST
05/24/2023
Objection raised — Scope
05/24/2023
Objection resolved — Addressed
05/23/2023
Filed — Alteration
NEW STEEL FRAMING TO BE INSTALLED AT THE CEILING OF THE BASEMENT (1ST FLOOR LEVEL) TO ENLARGE EXISTING STAIR OPENING.
B00873754-S1
05/23/2023
Filed — Alteration
NEW STEEL FRAMING TO BE INSTALLED AT THE CEILING OF THE BASEMENT (1ST FLOOR LEVEL) TO ENLARGE EXISTING STAIR OPENING.
B00873754-S2
05/23/2023
Permit issued — General Construction
B00873754-I1-GC
05/23/2023
Special inspection requirement — Structural Steel - Welding
Adam Cohen
05/23/2023
Special inspection requirement — Concrete - Cast-In-Place
Adam Cohen
05/23/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Adam Cohen
05/23/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Adam Cohen
05/12/2023
Filed — Alteration
NEW STEEL FRAMING TO BE INSTALLED AT THE CEILING OF THE BASEMENT (1ST FLOOR LEVEL) TO ENLARGE EXISTING STAIR OPENING.
B00873754-I1
05/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
05/12/2023
Special inspection requirement — Fire-Resistance Rated Construction
JACK GREEN
05/12/2023
Special inspection requirement — Structural Steel - Details
Adam Cohen
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC09/13/2023
DOB NOWGeneral ConstructionSigned-offAZM HOME IMPROVEMENTS09/11/2023
DOB NOWPlumbingSigned-offAQUA PLUMBING & HTNG CORP06/05/2023
DOB NOWStructuralSigned-offCNS CONSTRUCTION INC05/31/2023
DOB NOWGeneral ConstructionSigned-offCNS CONSTRUCTION INC05/23/2023
BISOTISSUEDPRESERVATION WORKS LLC06/04/2018
BISOTISSUEDPRESERVATION WORKS LLC05/24/2018
BISPLISSUEDHIGHLAND PLUMBING LLC05/31/2016
BISOTISSUEDTRIVIA RENOVATIONS, INC05/31/2016
BISOTISSUEDSANTANA CONTRACTING CORP12/02/2014
BISPLISSUEDBELL FUEL OIL, LLC09/12/2012
BISPLISSUEDBELL FUEL OIL, LLC06/16/2011
BISFSISSUEDAPPROVED OIL CO OF BKLYN06/16/2011
BISOTISSUEDDJM CONTRNG SERVICES CORP05/06/2005
BISEQISSUEDROCKLEDGE SCAFFOLD CORP11/06/2003
BISOTISSUEDDJM CONTRNG SERVICES CORP10/24/2003
4 projects · most recent 01/23/2024
General Wiring
FiledStatusContractorScope
01/23/2024CompleteMUM ELECTRICAL CORPGeneral Wiring
06/17/2023CompleteRIVIERA ELECTRIC CORPGeneral Wiring
12/17/2019CompletePRUDENT ELECTRIC INCGeneral Wiring
11/01/2019CancelledHIGH QUALITY ELECTRIC OFGeneral Wiring
1 project · most recent 07/31/2023
Steel
FiledStatusContractorScope
07/31/2023——Steel
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/08/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/07/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/08/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
10/17/2023HVAC-R and service water piping design and insulationWilliam Ryanenergy_progress
10/17/2023Fire-Resistant Penetrations and JointsWilliam Ryanspecial
10/17/2023Energy Code Compliance InspectionsWilliam Ryanprogress
09/28/2023Fire-Resistant Penetrations and JointsWilliam Ryanspecial
09/28/2023FinalDavid Cunninghamprogress
09/28/2023Energy Code Compliance InspectionsWilliam Ryanprogress
09/28/2023Fire-Resistance Rated ConstructionWilliam Ryanprogress
09/28/2023Interior lighting powerWilliam Ryanenergy_progress
05/23/2023Structural Steel - WeldingAdam Cohenspecial
05/23/2023Concrete - Cast-In-PlaceAdam Cohenspecial
05/23/2023Structural Stability – Alterations of existing buildingsAdam Cohenspecial
05/23/2023Structural Steel - High Strength BoltingAdam Cohenspecial
05/12/2023Fire-Resistant Penetrations and JointsJACK GREENspecial
05/12/2023Fire-Resistance Rated ConstructionJACK GREENprogress
05/12/2023Structural Steel - DetailsAdam Cohenspecial
05/12/2023FinalAdam Cohenprogress
05/11/2023FinalAli Hocekprogress
03/23/2023Structural Steel - WeldingTENZIN NYANDAKspecial
03/23/2023Structural Steel - High Strength BoltingTENZIN NYANDAKspecial
03/23/2023Structural Stability – Alterations of existing buildingsTENZIN NYANDAKspecial
03/23/2023Structural Steel - DetailsTENZIN NYANDAKspecial
03/21/2023FinalTENZIN NYANDAKprogress
▾Documents — 148 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/28/2026B00786090-I1Request digital key ↗
08/27/2026B00873754-S2Request digital key ↗
08/27/2026B00873754-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION8
05/30/2018321758807Open ↗
05/24/2018340589189Open ↗
03/29/2018340589189Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION8
06/04/2018340589189Open ↗
05/30/2018321758807Open ↗
03/29/2018340589189Open ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISRESTRICTION: EASEMENT AGREEMENT1
05/30/2018321758807Open ↗
▸Seals & Professional Certifications49
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026B00873754-I1Open ↗
08/30/2026B00847202-I1Open ↗
08/30/2026B00847202-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026B00873754-I1Open ↗
09/01/2026B00873754-I1Open ↗
08/30/2026B00847202-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
12/27/2019340589189Open ↗
04/05/2019340589189Open ↗
04/05/2019321758807Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/28/2026B00786090-I1Open ↗
08/27/2026B00873754-S1Open ↗
08/27/2026B00873754-I1Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
03/29/2018340589189Open ↗
05/16/2016340377513Open ↗
10/29/2014340199797Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
03/29/2018340589189Open ↗
05/16/2016340377513Open ↗
10/29/2014340199797Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/29/2018340589189Open ↗
05/16/2016340377513Open ↗
10/29/2014340199797Open ↗
▸BISPROFESSIONAL/OWNER SIGNATURES1
05/30/2018321758807Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING3
07/11/2016340377513Open ↗
05/16/2016340377513Open ↗
06/02/2011320316350Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
06/02/2011320316350Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/14/2016340377513Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
10/17/2012320316350Open ↗
▸Safety & Tenant Protection5
▸BISTENANT PROTECTION PLAN AND NOTES3
03/29/2018340589189Open ↗
05/16/2016340377513Open ↗
05/30/2018321758807Open ↗
▸BISSTREET TREE CHECKLIST1
06/02/2011320316350Open ↗
▸BISTENANT PROTECTION PLAN 2008 CODE1
10/29/2014340199797Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/28/2026B00786090-I1Open ↗
08/27/2026B00873754-I1Open ↗
08/27/2026B00873754-S2Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
05/30/2018321758807Open ↗
03/29/2018340589189Open ↗
05/16/2016340377513Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/02/2011320316350Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
04/05/2019340589189Open ↗
04/05/2019321758807Open ↗
05/30/2018321758807Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
05/25/2018340589189Open ↗
03/29/2018340589189Open ↗
05/16/2016340377513Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
04/05/2019340589189Open ↗
04/05/2019321758807Open ↗
11/28/2016340377513Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
03/29/2018340589189Open ↗
05/16/2016340377513Open ↗
▸BISNYCECC ANALYSIS2
03/29/2018340589189Open ↗
05/16/2016340377513Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00787098-I1Open ↗
08/13/2026B00786090-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY3
04/25/2018340589189Open ↗
03/29/2018340589189Open ↗
05/16/2016340377513Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
03/29/2018340589189Open ↗
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
11/26/2012320316350Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
12/27/2019340589189Open ↗
12/24/2019321758807Open ↗
04/05/2019340589189Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/30/2018321758807Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/02/2011320316350Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
04/05/2019340589189Open ↗
04/05/2019321758807Open ↗
05/30/2018321758807Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms10
▸BISBOROUGH INTAKE FORM3
12/27/2019340589189Open ↗
12/24/2019321758807Open ↗
04/05/2019321758807Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
03/29/2018340589189Open ↗
05/16/2016340377513Open ↗
10/29/2014340199797Open ↗
▸BISADDITIONAL INFORMATION2
05/25/2018340589189Open ↗
04/30/2018340589189Open ↗
▸BISEFILING COVER SHEET2
05/25/2018321758807Open ↗
06/02/2011320316350Open ↗