Public elementary, junior or senior high
P.S. 139
330 RUGBY ROAD · BIN 3328235
💬 Discuss this project
1902Year Built
4Stories
W1Building Class
R3XZoning
88,600 sfGross Floor Area
1Units
LL97 Covered7 Open Violations 4 unresolved · 3 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 65,200 sf lot · 1.36 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
RoofUnder Construction8p · 1 filing · 11 docs
Floor 3Under Construction8p · 1 filing · 11 docs
Floor 2Under Construction7p · 1 filing · 11 docs
Floor 1Under Construction8p · 2 filings · 20 docs
Sub-BasementUnder Construction7p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY4409/22/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPARTMENT OF EDUCATION1003/22/2026
DEPARTMENT OF EDUCATION 0303/22/2026
DOE PS 139 0303/22/2026
DOE 040203/22/2026
D.O.E P.S.139 ALEXINE A.103/22/2026
PS 139 DEPT OF EDUCATION0203/22/2026
DEPT OF EDUCATION P.S.139203/22/2026
D.O.E. P.S. 139203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AME SERVICES403/21/2026
DSENY ENGINEERING SERVICES403/21/2026
STEPHEN B JACOBS GROUP803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SINGH LANDSCAPING & LAWNGeneral Contractor1203/21/2026
INN. CONSTRUCTION CORPGeneral Contractor708/26/2026
WDF INCGeneral Contractor509/22/2026
WHITESTONE CONSTRUCTION CORPGeneral Contractor403/21/2026
EAGLE VISION CONSTRUCTIONGeneral Contractor407/08/2026
FAJARDO, JOSEElectrical103/21/2026
CEDOMIR MARAElectrical103/21/2026
CAPIZZO, VITOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.317404/30/2026
FUTURE TECH CONSULTANTS O589101/25/2022
Building Lifecycle
All (131)Filed (15)Permit Issued (22)Signed Off (4)Violation (60)Inspection (3)Objection (21)Special Inspection (6)
09/21/2026
Permit issued — Construction Fence
B00978584-I1-FN
08/13/2026
Permit issued — General Construction
B00984049-I1-GC
08/03/2026
Permit issued — Supported Scaffold
B01386581-I1-SF
08/03/2026
Permit issued — Sidewalk Shed
B01413648-I1-SH
08/03/2026
Permit issued — Construction Fence
B01386569-I1-FN
07/09/2026
Permit issued — Sidewalk Shed
B01413648-I1-SH
07/08/2026
Permit issued — Supported Scaffold
B01386581-I1-SF
07/06/2026
Permit issued — Construction Fence
B01386569-I1-FN
07/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/29/2026
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED FOR PS 139K AT 330 RUGBY ROAD, BROOKLYN IN CONJUNCTION WITH ALT# B00984049 AS INDICATED ON PLANS.
B01413648-I1
05/28/2026
Objection raised — Other
05/20/2026
Objection resolved — Resolved
05/18/2026
Objection resolved — Addressed
05/15/2026
Objection resolved — Addressed
05/08/2026
Objection raised — Other
05/07/2026
Objection raised — Other
05/07/2026
Objection raised — Other
04/30/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 139K AT 330 RUGBY ROAD, BROOKLYN IN CONJUNCTION WITH ALT# B00984049 AS INDICATED ON PLANS.
B01386569-I1
04/30/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD FOR PS 139K AT 330 RUGBY ROAD, BROOKLYN IN CONJUNCTION WITH ALT# B00984049 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01386581-I1
04/30/2026
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED FOR PS 139K AT 330 RUGBY ROAD, BROOKLYN IN CONJUNCTION WITH ALT# B00984049 AS INDICATED ON PLANS.
B01386574-I1
04/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/13/2026
Special inspection requirement — Post-installed Anchors
Maxim Korngold
03/10/2026
Violation issued (FDNY_ORDER, closed)
03/06/2026
Permit issued — General Construction
B00908538-I1-GC
02/19/2026
Permit issued — General Construction
B00908538-I1-GC
02/17/2026
Violation issued (ECB, closed)
Construction
02/17/2026
Violation issued (ECB, open)
Construction
02/17/2026
Violation issued (ECB, open)
Construction
09/29/2025
Filed — Alteration
INTERIOR UPGRADE OF AUDITORIUM INCLUDING: REMOVAL AND REPLACEMENT OF FIXED AUDITORIUM SEATING REPAIR AND PATCHING OF EXISTING SURFACES PAINT GYPSUM BOARD & PLASTER SURFACES REPLACEMENT OF WINDOW CURTAINS & DRAPERIES RELOCATION OF WOMEN'S BATHROOM DOOR,.
B00908538-P2
09/15/2025
Permit issued — Construction Fence
B00978584-I1-FN
08/27/2025
Violation issued (ECB, open)
Construction
08/27/2025
Violation issued (ECB, closed)
Construction
08/27/2025
Violation issued (ECB, closed)
Construction
05/01/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/26/2025
Permit issued — General Construction
B00908538-I1-GC
01/22/2025
Permit issued — Boiler Equipment
B00998496-I1-BE
11/15/2024
Violation issued (FDNY_ORDER, closed)
11/15/2024
Violation issued (FDNY_ORDER, closed)
11/15/2024
Violation issued (FDNY_ORDER, closed)
11/15/2024
Violation issued (FDNY_ORDER, closed)
11/15/2024
Violation issued (FDNY_ORDER, closed)
10/15/2024
Permit issued — Construction Fence
B00978584-I1-FN
07/24/2024
Permit issued — General Construction
B00908538-I1-GC
05/09/2024
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
MIKHAIL ZEYGMAN
05/02/2024
Filed — Alteration
K139, INSTALLATION OF A 10,000-GALLON #4 FUEL OIL STORAGE TANK CONNECTED TO THE EXISTING OIL PUMP SET IN THE BOILER ROOM OF THE BUILDING IN CONJUNCTION WITH DOB # B00977458-I1-LA SUBMITTING ON BEHALF OF CONTRACTOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00998496-P1
05/01/2024
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
MIKHAIL ZEYGMAN
03/06/2024
Objection resolved — Addressed
03/06/2024
Special inspection requirement — Concrete - Cast-In-Place
MAXIM KORNGOLD
02/26/2024
Objection resolved — Addressed
02/20/2024
Objection raised — Other
02/12/2024
Filed — Alteration
K139, INSTALLATION OF A 10,000-GALLON #4 FUEL OIL STORAGE TANK CONNECTED TO THE EXISTING OIL PUMP SET IN THE BOILER ROOM OF THE BUILDING IN CONJUNCTION WITH DOB # B00977458-I1-LA SUBMITTING ON BEHALF OF CONTRACTOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00998496-I1
02/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAXIM KORNGOLD
01/12/2024
Objection raised — Other
01/03/2024
Filed — Alteration
MASONRY: REPAIR/REPLACE DAMAGE FACE BRICK CUT AND REPOINT MASONRY JOINTS PROVIDE SEALANT AT OPEN JOINTS REPAIR DAMAGED CONCRETE LANDINGS/STEPS. STONE SILLS/COPINGS. INTERIOR FINISHES: REPAIR WALL PLASTER REPAIR CEILING PLASTER REPAINT WALLS AND CEILINGS.
B00984049-I1
01/02/2024
Special inspection requirement — Masonry
MAXIM KORNGOLD
12/21/2023
Filed — Alteration
Proposed: installation of temporary fence associated with the temporary fuel storage tank. No change of use, egress or occupancy.
B00978584-I1
12/21/2023
Permit issued — Construction Fence
B00978584-I1-FN
10/20/2023
Filed — Alteration
INTERIOR UPGRADE OF AUDITORIUM INCLUDING: REMOVAL AND REPLACEMENT OF FIXED AUDITORIUM SEATING REPAIR AND PATCHING OF EXISTING SURFACES PAINT GYPSUM BOARD & PLASTER SURFACES REPLACEMENT OF WINDOW CURTAINS & DRAPERIES RELOCATION OF WOMEN'S BATHROOM DOOR,.
B00908538-P1
10/05/2023
Signed off — Alteration
FN/PS139K - FOR TEMPORARY CONSTRUCTION EQUIPMENT(EMERGENCY FENCE) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH LLW#130340 NO CHANGE IN USE, OCCUPANCY OR EGRESS
B00723150-I1
08/31/2023
Signed off — Alteration
SH/PS139K - FOR TEMPORARY CONSTRUCTION EQUIPMENT(EMERGENCY SHED) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH LLW#130340 NO CHANGE IN USE, OCCUPANCY OR EGRE
B00694717-I1
Latest 60 of 131 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedWDF INC09/21/2026
DOB NOWGeneral ConstructionPermit IssuedINN. CONSTRUCTION CORP08/13/2026
DOB NOWSupported ScaffoldPermit IssuedINN. CONSTRUCTION CORP08/03/2026
DOB NOWSidewalk ShedPermit IssuedINN. CONSTRUCTION CORP08/03/2026
DOB NOWConstruction FencePermit IssuedINN. CONSTRUCTION CORP08/03/2026
DOB NOWSidewalk ShedPermit IssuedINN. CONSTRUCTION CORP07/09/2026
DOB NOWSupported ScaffoldPermit IssuedINN. CONSTRUCTION CORP07/08/2026
DOB NOWConstruction FencePermit IssuedINN. CONSTRUCTION CORP07/06/2026
DOB NOWGeneral ConstructionPermit IssuedEAGLE VISION CONSTRUCTION03/06/2026
DOB NOWGeneral ConstructionPermit IssuedEAGLE VISION CONSTRUCTION02/19/2026
DOB NOWConstruction FencePermit IssuedWDF INC09/15/2025
DOB NOWGeneral ConstructionPermit IssuedEAGLE VISION CONSTRUCTION03/26/2025
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP01/22/2025
DOB NOWConstruction FencePermit IssuedWDF INC10/15/2024
DOB NOWGeneral ConstructionPermit IssuedEAGLE VISION CONSTRUCTION07/24/2024
DOB NOWConstruction FencePermit IssuedWDF INC12/21/2023
DOB NOWSupport of ExcavationSigned-offSINGH LANDSCAPING & LAWN10/06/2022
DOB NOWConstruction FenceSigned-offSINGH LANDSCAPING & LAWN09/30/2022
DOB NOWConstruction FenceSigned-offWHITESTONE CONSTRUCTION CORP09/29/2022
DOB NOWSidewalk ShedSigned-offWHITESTONE CONSTRUCTION CORP09/29/2022
DOB NOWSupport of ExcavationSigned-offSINGH LANDSCAPING & LAWN04/21/2022
DOB NOWConstruction FenceSigned-offSINGH LANDSCAPING & LAWN04/11/2022
BISPLISSUEDVARSITY PLBG AND HTG INC04/18/2025
BISPLISSUEDVARSITY PLBG AND HTG INC07/24/2024
BISPLISSUEDVARSITY PLBG AND HTG INC04/22/2024
BISPLISSUEDVARSITY PLBG AND HTG INC07/27/2023
BISPLISSUEDVARSITY PLBG AND HTG INC05/01/2023
BISOTISSUEDSINGH LANDSCAPING & LAWN10/05/2022
BISOTISSUEDSINGH LANDSCAPING & LAWN10/05/2022
BISOTISSUEDSINGH LANDSCAPING & LAWN10/05/2022
BISPLISSUEDVARSITY PLBG AND HTG INC08/01/2022
BISOTISSUEDSINGH LANDSCAPING & LAWN08/01/2022
BISOTISSUEDSINGH LANDSCAPING & LAWN04/22/2022
BISOTISSUEDSINGH LANDSCAPING & LAWN04/22/2022
BISPLISSUEDVARSITY PLBG AND HTG INC04/22/2022
BISEQISSUEDCREAMER ENVIRONMENTAL INC06/30/2017
BISPLISSUEDVARSITY PLBG AND HTG INC06/13/2016
BISPLISSUEDVARSITY PLBG AND HTG INC06/23/2015
BISEQISSUEDKEL-TECH CONSTRUCTION INC03/26/2015
BISOTISSUEDKEL-TECH CONSTRUCTION INC03/26/2015
+ 32 more permits on file
11 projects · most recent 07/06/2026
General Wiring
FiledStatusContractorScope
07/06/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
03/20/2026Permit IssuedDVM ELECTRICAL SERVICES LGeneral Wiring
08/18/2025CompleteAM NY ELECTRIC CORPGeneral Wiring
06/26/2025CompleteEVEREST ELECTRIC CORP—
03/28/2025CancelledA.T.J. ELECTRICAL CO.INC.General Wiring
12/31/2024CompleteCHARAN ELEC'L ENTERP'S IN—
07/12/2024Permit IssuedURBAN ELECTRICAL CORPGeneral Wiring
03/04/2022CompleteSTANCO SYSTEM ELEC'L CONT—
10/30/2019CompleteCHARAN ELEC'L ENTERP'S IN—
08/13/2019CompleteMULTI-TECH ELECTRIC, INCGeneral Wiring
02/05/2018CompleteCHARAN ELEC'L ENTERP'S IN—
5 projects · most recent 06/29/2026
Sidewalk Shed Fence Scaffold
FiledStatusContractorScope
06/29/2026Permit IssuedINN. CONSTRUCTION CORPSidewalk Shed
04/30/2026Permit IssuedINN. CONSTRUCTION CORPFence
04/30/2026——Sidewalk Shed
04/30/2026Permit IssuedINN. CONSTRUCTION CORPScaffold
12/21/2023Permit IssuedWDF INCFence
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/01/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
04/13/2026Post-installed AnchorsMaxim Korngoldspecial
05/09/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsMIKHAIL ZEYGMANspecial
05/01/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsMIKHAIL ZEYGMANspecial
03/06/2024Concrete - Cast-In-PlaceMAXIM KORNGOLDspecial
02/12/2024Structural Stability – Alterations of existing buildingsMAXIM KORNGOLDspecial
01/02/2024MasonryMAXIM KORNGOLDspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 139kEducation—
Project B01413648 Alteration · Permit Entire · 06/29/2026
Project B01386574 Alteration · Filing Withdrawn · 04/30/2026
Project B00658625 Alteration · LOC Issued · 01/24/2022
P.S. 139Education—
Project B00978584 Alteration · Permit Entire · 12/21/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/26/2026B00908538-I1Request digital key ↗
08/26/2026B00908538-P2Request digital key ↗
08/26/2026B00908538-P1Request digital key ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/31/2026B00658625-I1Open ↗
08/29/2026B00723150-I1Open ↗
08/26/2026B00908538-P2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026B00998496-I1Open ↗
09/01/2026B01386581-I1Open ↗
08/24/2026B00984049-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWNYCSCA - Approved Site Safety Plans7
08/16/2026B01413648-I1Open ↗
08/15/2026B01386569-I1Open ↗
08/15/2026B01386581-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/26/2026B00984049-I1Open ↗
▸Approvals, Objections & Sign-offs35
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
08/16/2026B01413648-I1Open ↗
08/15/2026B01386569-I1Open ↗
08/15/2026B01386581-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)14
08/16/2026B01413648-I1Open ↗
08/15/2026B01386569-I1Open ↗
08/15/2026B01386581-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/14/2026B00658625-I1Open ↗
08/13/2026B00658629-I1Open ↗
08/13/2026B00908538-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter2
08/26/2026B00984049-I1Open ↗
08/13/2026B00908538-I1Open ↗
▸Other Documents17
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal14
08/16/2026B01413648-I1Open ↗
08/15/2026B01386569-I1Open ↗
08/15/2026B01386581-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProof of Historic Building2
08/13/2026B00998496-I1Open ↗
08/13/2026B00998496-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00658629-I1Open ↗