← Back
Walk-up cooperative
Celebration Townhouses
330 SKYLINE DRIVE · BIN 5131936
💬 Discuss this project
2000Year Built
2Stories
C6Building Class
R3-2Zoning
19,955 sfGross Floor Area
10Units
Rent Stabilized6 Open Violations ▸FDNY Report ↗
Walk-up cooperative · 17,050 sf lot · 1.17 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 3 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CELEBRATION TH OWNER CORP103/21/2026
CELEBRATIO203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC106/18/2026
M-CON ENGINEERING, PC106/11/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOURCE ELECTRIC INCElectrical103/22/2026
KAMTECH RESTORATION CORPGeneral Contractor109/19/2026
SUNRUN INSTALLATION SVCGeneral Contractor106/27/2026
SUSTAINABLE STRATEGIESGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272106/18/2026
M-CON ENGINEERING7341106/11/2025
Building Lifecycle
All (22)Filed (2)Permit Issued (3)Violation (12)Special Inspection (5)
09/18/2026
Permit issued — Solar
S01461978-I1-SL
06/23/2026
Permit issued — Solar
S01419101-I1-SL
06/18/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01419101-I1
05/08/2026
Violation issued (HPD, open)
A
06/17/2025
Permit issued — Solar
S01239875-I1-SL
06/13/2025
Violation issued (HPD, open)
A
06/11/2025
Filed — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
S01239875-I1
06/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michelle Contri
06/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michelle Contri
06/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Michelle Contri
06/11/2025
Special inspection requirement — Final
Michelle Contri
06/11/2025
Special inspection requirement — Air barrier - visual inspection
Michelle Contri
04/16/2024
Violation issued (HPD, open)
A
03/30/2023
Violation issued (HPD, open)
A
03/09/2022
Violation issued (HPD, open)
A
04/19/2021
Violation issued (HPD, open)
A
04/19/2021
Violation issued (HPD, closed)
I
10/25/2018
Violation issued (HPD, closed)
I
12/07/2017
Violation issued (HPD, closed)
I
11/25/2016
Violation issued (HPD, closed)
I
10/19/2015
Violation issued (HPD, closed)
I
03/03/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedKAMTECH RESTORATION CORP09/18/2026
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC06/23/2026
DOB NOWSolarPermit IssuedSUSTAINABLE STRATEGIES06/17/2025
BISPLISSUEDDUO PLUMBING & HTG CORP.03/21/2001
BIS—ISSUEDCLEBRATION & SKYLINE HOMES CORP09/25/2000
BISPLISSUEDDUO PLUMBING & HTG CORP.03/20/2000
BIS—ISSUEDCLEBRATION & SKYLINE HOMES CORP11/30/1999
4 projects · most recent 09/17/2026
General Wiring
FiledStatusContractorScope
09/17/2026Permit IssuedBERGER QUALITY ELEC'L CON—
06/18/2026CompleteSUNRUN SOLAR ELECTL CORP—
09/10/2025Permit IssuedSNB ELECTRICAL CONTNG CORGeneral Wiring
06/11/2025CompleteSOURCE ELECTRIC INC1 meters
2 projects · most recent 06/18/2026
FiledStatusContractorScope
06/18/2026Permit IssuedSUNRUN INSTALLATION SVC15 panels, 6.75 kw, 315 roof_area_sqft
06/11/2025Permit IssuedSUSTAINABLE STRATEGIES18 panels, 6.03 kw, 769 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/11/2025Fire-Resistant Penetrations and JointsMichelle Contrispecial
06/11/2025Structural Stability – Alterations of existing buildingsMichelle Contrispecial
06/11/2025Energy Code Compliance InspectionsMichelle Contriprogress
06/11/2025FinalMichelle Contriprogress
06/11/2025Air barrier - visual inspectionMichelle Contrienergy_progress
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026S01239875-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026S01239875-I1Open ↗
09/01/2026S01239875-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/19/2026S01239875-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026S01239875-I1Open ↗