One story - permanent living quarter
330 TAYLOR AVENUE
BRONX · BIN 2020345
💬 Discuss this project
1940Year Built
1.5Stories
A2Building Class
R3AZoning
840 sfGross Floor Area
1Units
One story - permanent living quarter · Owner of record: BABAKAMA 119 LLC · 5,000 sf lot · 0.17 FAR built · Flood zone X
Locations of Work
Structural
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZMIROT1809/13/2026
RESIDENCE103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/28/2026$1.1M—— → —$1,310/sf building
01/22/2025$260K—Private party → BABAKAMA 119 LLC$310/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN606/01/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
26 BONIM LLCGeneral Contractor603/21/2026
PLBG P & H INCPlumbing407/08/2026
JACOB KANNERElectrical203/21/2026
MARIO CASTROElectrical103/21/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
POWER SURGE ELECTRIC INC 004009General Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519506/01/2026
Building Lifecycle
All (75)Filed (6)Permit Issued (4)Signed Off (3)Inspection (8)Objection (24)Special Inspection (30)
08/26/2026
Signed off — Alteration CO
EXIST 1.5 STORIES (1) ONE FAMILY DWELLING UNIT TO BE HORIZONTALLY AND VERTICALLY ENLARGE, FULLY RENOVATED AND CONVERTED INTO A (2) TWO FAMILY DWELLING UNITS. New drywall partitions and plumbing fixtures as per plans.
X01174049-I1
07/21/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN FLYNN
07/21/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
07/21/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
07/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
07/21/2026
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
07/21/2026
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
07/21/2026
Special inspection requirement — Structural Wood Frame
Younes Abouyaala
07/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
07/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
07/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/21/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
07/21/2026
Special inspection requirement — Final
NAVEEN KUMAR
07/21/2026
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
07/21/2026
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
07/21/2026
Special inspection requirement — Electric vehicle service equipment requirements
Younes Abouyaala
07/21/2026
Special inspection requirement — Interior lighting power
Younes Abouyaala
07/21/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
07/21/2026
Special inspection requirement — Fenestration areas
Younes Abouyaala
07/21/2026
Special inspection requirement — Metering
Younes Abouyaala
07/21/2026
Special inspection requirement — Permanent certificate
Younes Abouyaala
07/21/2026
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
07/21/2026
Special inspection requirement — Footing and Foundation
Younes Abouyaala
06/01/2026
Filed — Alteration CO
EXIST 1.5 STORIES (1) ONE FAMILY DWELLING UNIT TO BE HORIZONTALLY AND VERTICALLY ENLARGE, FULLY RENOVATED AND CONVERTED INTO A (2) TWO FAMILY DWELLING UNITS. New drywall partitions and plumbing fixtures as per plans.
X01174049-P3
04/14/2026
Objection resolved — Resolved
04/13/2026
Objection raised — Admin
04/03/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/30/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/19/2026
Filed — Alteration CO
EXIST 1.5 STORIES (1) ONE FAMILY DWELLING UNIT TO BE HORIZONTALLY AND VERTICALLY ENLARGE, FULLY RENOVATED AND CONVERTED INTO A (2) TWO FAMILY DWELLING UNITS. New drywall partitions and plumbing fixtures as per plans.
X01174049-P2
03/18/2026
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
03/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
03/18/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN FLYNN
03/18/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
03/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
03/18/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
03/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
03/18/2026
Special inspection requirement — Final
NAVEEN KUMAR
01/05/2026
Signed off — Alteration
installation of new plumbing fixtures for the renovation and conversion of the existing one family dwelling to be converted into a two family dwelling. Filed in conjunction with ALT I app # X01174049-I1
X01227063-I1
10/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/09/2025
Objection resolved — Addressed
07/30/2025
Objection raised — Admin
07/22/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/22/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/20/2025
Signed off — Alteration
Installation of new construction fence filed in conjunction with ALT CO #X01174049-I1
X01181955-I1
07/15/2025
Filed — Alteration CO
EXIST 1.5 STORIES (1) ONE FAMILY DWELLING UNIT TO BE HORIZONTALLY AND VERTICALLY ENLARGE, FULLY RENOVATED AND CONVERTED INTO A (2) TWO FAMILY DWELLING UNITS. New drywall partitions and plumbing fixtures as per plans.
X01174049-P1
06/05/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/23/2025
Permit issued — Foundation
X01174049-I1-GC-CX
05/21/2025
Permit issued — Plumbing
X01227063-I1-PL
05/20/2025
Permit issued — Foundation
X01174049-I1-GC-CX
05/16/2025
Filed — Alteration
installation of new plumbing fixtures for the renovation and conversion of the existing one family dwelling to be converted into a two family dwelling. Filed in conjunction with ALT I app # X01174049-I1
X01227063-I1
04/14/2025
Objection resolved — Addressed
04/14/2025
Objection resolved — Addressed
04/14/2025
Objection resolved — Addressed
04/13/2025
Objection resolved — Addressed
04/11/2025
Objection resolved — Addressed
04/11/2025
Objection resolved — Addressed
04/11/2025
Objection resolved — Addressed
04/11/2025
Objection resolved — Addressed
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit Issued26 BONIM05/23/2025
DOB NOWPlumbingSigned-offPLBG P & H INC05/21/2025
DOB NOWFoundationPermit Issued26 BONIM05/20/2025
DOB NOWConstruction FenceSigned-off26 BONIM02/19/2025
2 projects · most recent 12/18/2025
General Wiring
FiledStatusContractorScope
12/18/2025CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
11/03/2025CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 06/01/2026
Concrete Wood
FiledStatusContractorScope
06/01/2026Permit Issued26 BONIM LLCConcrete, Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/03/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/30/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/22/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/05/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/05/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
07/21/2026Subsurface Investigations (Borings/Test Pits)BRIAN FLYNNspecial
07/21/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
07/21/2026Concrete - Cast-In-PlaceYounes Abouyaalaspecial
07/21/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
07/21/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/21/2026Subgrade InspectionsYounes Abouyaalaspecial
07/21/2026FinalNAVEEN KUMARprogress
07/21/2026Structural Wood FrameYounes Abouyaalaprogress
07/21/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
07/21/2026Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
07/21/2026Footing and FoundationYounes Abouyaalaprogress
07/21/2026Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
07/21/2026Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
07/21/2026Insulation placement and R valuesYounes Abouyaalaenergy_progress
07/21/2026Fenestration air leakageYounes Abouyaalaenergy_progress
07/21/2026Electric vehicle service equipment requirementsYounes Abouyaalaenergy_progress
07/21/2026Interior lighting powerYounes Abouyaalaenergy_progress
07/21/2026Maintenance informationYounes Abouyaalaenergy_progress
07/21/2026Fenestration areasYounes Abouyaalaenergy_progress
07/21/2026MeteringYounes Abouyaalaenergy_progress
07/21/2026Permanent certificateYounes Abouyaalaenergy_progress
07/21/2026Air barrier - visual inspectionYounes Abouyaalaenergy_progress
03/18/2026Fenestration areasYounes Abouyaalaenergy_progress
03/18/2026Concrete - Cast-In-PlaceYounes Abouyaalaspecial
03/18/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
Latest 25 of 74.
▾Documents — 79 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/20/2026X01181955-I1Request digital key ↗
08/19/2026X01227063-I1Request digital key ↗
08/17/2026X01174049-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
10/21/2008210074587Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram4
08/17/2026X01174049-P3Open ↗
08/13/2026X01174049-P1Open ↗
08/13/2026X01174049-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/17/2026X01174049-P3Open ↗
08/13/2026X01174049-P2Open ↗
08/13/2026X01174049-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026X01174049-I1Open ↗
09/02/2026X01174049-I1Open ↗
09/02/2026X01174049-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026X01174049-I1Open ↗
09/02/2026X01174049-I1Open ↗
08/30/2026X01174049-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026X01181955-I1Open ↗
08/17/2026X01174049-P1Open ↗
08/17/2026X01174049-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/21/2008210074587Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/21/2008210074587Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/21/2008210074587Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
10/21/2008210074587Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/17/2026X01174049-P3Open ↗
08/13/2026X01174049-P1Open ↗
08/13/2026X01174049-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/17/2026X01174049-P3Open ↗
08/17/2026X01174049-I1Open ↗
08/17/2026X01174049-P2Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT4
08/17/2026X01174049-P3Open ↗
08/13/2026X01174049-P1Open ↗
08/13/2026X01174049-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X01174049-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISSCHEDULE A - OCCUPANCY / USE1
10/21/2008210074587Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/03/2008210074587Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
10/21/2008210074587Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
10/21/2008210074587Open ↗
▸Other Documents18
▸DOB NOWSite Survey: Initial4
08/17/2026X01174049-P3Open ↗
08/13/2026X01174049-P1Open ↗
08/13/2026X01174049-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/17/2026X01174049-P3Open ↗
08/13/2026X01174049-P1Open ↗
08/13/2026X01174049-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/17/2026X01174049-P3Open ↗
08/13/2026X01174049-P2Open ↗
08/13/2026X01174049-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/17/2026X01174049-P3Open ↗
08/17/2026X01174049-P1Open ↗
08/17/2026X01174049-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM1
10/21/2008210074587Open ↗
▸DOB NOWFinal Survey1
08/13/2026X01174049-I1Open ↗