← Back
Full service hotel
3300 WEBSTER AVENUE
BRONX · BIN 2129624
💬 Discuss this project
2020Year Built
4Stories
H2Building Class
C8-2Zoning
37,124 sfGross Floor Area
1Units
LL97 Covered2 Open Violations 1 unresolved · 1 paperwork only ▸
Full service hotel · Owner of record: 33 INVESTORS LLC · 11,358 sf lot · 3.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof1p · 1 filing · 8 docs
Floor 41p · 1 filing · 8 docs
Floor 31p · 1 filing · 8 docs
Floor 2
Floor 1
Cellar2p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SUPREME BUILDERS1207/08/2026
RELIABLE ENTERPRISES507/08/2026
33 INVESTORS LLC903/22/2026
DASR103/22/2026
3300 WEBSTER AVENUE603/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/23/2019$2.0M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALL CITY ENGINEERING PC310/05/2023
HIGHRISE GROUP NYC, INC108/26/2020
ENTHINK ENGINEERS LLC107/29/2020
M.S. SAVANI ARCHITECT, PC101/16/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGHRISE GROUP NYC, INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUPREME BUILDERS CORPGeneral Contractor303/21/2026
ERIC & NG ELEC'L, INC.Electrical203/22/2026
RICHARD NEUElectrical103/22/2026
RRP PLUMBING CORPFire Protection107/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.394210/05/2023
HIGHRISE GROUP NYC, INC6753108/26/2020
Building Lifecycle
All (66)Filed (6)Permit Issued (3)Signed Off (3)Violation (31)Inspection (2)Objection (18)Special Inspection (3)
06/25/2026
Violation issued (ECB, open)
Elevators
05/11/2026
Violation issued (HPD, closed)
A
02/27/2025
Signed off — Alteration
INSTALL MANUAL WET STANDPIPE SYSTEM THROUGHOUT THE BUILDING, NO CHANGE OF EGRESS, USE AND OCCUPANCY
X00384014-I1
07/22/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/13/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/12/2023
Special inspection requirement — Standpipe Systems
Paul Raymond
10/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
10/05/2023
Filed — Alteration
INSTALL MANUAL WET STANDPIPE SYSTEM THROUGHOUT THE BUILDING, NO CHANGE OF EGRESS, USE AND OCCUPANCY
X00384014-P2
09/13/2023
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
09/08/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
09/05/2023
Permit issued — Standpipe
X00384014-I1-EW-SD
02/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/30/2021
Violation issued (ECB, closed)
Construction
06/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/26/2021
Filed — Alteration
INSTALL MANUAL WET STANDPIPE SYSTEM THROUGHOUT THE BUILDING, NO CHANGE OF EGRESS, USE AND OCCUPANCY
X00384014-P1
05/21/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/01/2021
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AT VARIOUS LEVELS FOR A NEW BUILDING UNDER JOB# 220152812 AS PER PLAN. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
X00372599-I1
11/18/2020
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00377568-I1
10/28/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/02/2020
Objection raised — Structural
09/02/2020
Objection resolved — Addressed
09/02/2020
Objection raised — Scope
09/02/2020
Objection resolved — Addressed
09/02/2020
Objection raised — Inspections
09/02/2020
Objection resolved — Addressed
09/02/2020
Objection raised — Inspections
09/02/2020
Objection resolved — Addressed
09/02/2020
Objection raised — Structural
09/02/2020
Objection resolved — Addressed
09/02/2020
Objection raised — Inspections
09/02/2020
Objection resolved — Addressed
09/02/2020
Objection raised — Structural
09/02/2020
Objection resolved — Addressed
09/02/2020
Objection raised — Structural
09/02/2020
Objection resolved — Addressed
09/02/2020
Objection raised — Structural
09/02/2020
Objection resolved — Addressed
09/01/2020
Filed — Alteration
INSTALL MANUAL WET STANDPIPE SYSTEM THROUGHOUT THE BUILDING, NO CHANGE OF EGRESS, USE AND OCCUPANCY
X00384014-I1
08/31/2020
Permit issued — Supported Scaffold
X00372599-I1-SF
08/26/2020
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AT VARIOUS LEVELS FOR A NEW BUILDING UNDER JOB# 220152812 AS PER PLAN. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
X00372599-I1
08/10/2020
Permit issued — Sidewalk Shed
X00377568-I1-SH
08/06/2020
Violation issued (ECB, closed)
Construction
07/29/2020
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00377568-I1
07/29/2020
Special inspection requirement — Final
Sunil Saigal
07/15/2020
Violation issued (ECB, closed)
Construction
07/15/2020
Violation issued (ECB, closed)
Construction
07/15/2020
Violation issued (ECB, closed)
Unknown
07/15/2020
Violation issued (ECB, closed)
Construction
07/15/2020
Violation issued (ECB, closed)
Construction
06/11/2020
Violation issued (ECB, closed)
Construction
05/27/2020
Violation issued (ECB, closed)
Construction
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offRALPH W. LANDOLFI JR.09/05/2023
DOB NOWSupported ScaffoldSigned-offSUPREME BUILDERS CORP08/31/2020
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC08/10/2020
BIS—ISSUEDSUPREME BUILDERS CORP09/27/2023
BISPLISSUEDRRP PLUMBING CORP05/02/2023
BIS—ISSUEDSUPREME BUILDERS CORP09/26/2022
5 projects · most recent 09/20/2023
General Wiring
FiledStatusContractorScope
09/20/2023CompleteERIC & NG ELEC'L, INC.General Wiring
09/30/2020CompleteERIC & NG ELEC'L, INC.General Wiring
08/22/2020CompleteKWONG MING ELECTRIC INC—
07/30/2020CompleteRICHARD NEU—
06/30/2020CompleteERIC & NG ELEC'L, INC.—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/13/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
09/08/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
10/12/2023Standpipe SystemsPaul Raymondspecial
10/12/2023Fire-Resistant Penetrations and JointsPaul Raymondspecial
07/29/2020FinalSunil Saigalprogress
▾Documents — 242 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Standpipe3
08/25/2026X00384014-P1Request digital key ↗
08/25/2026X00384014-P2Request digital key ↗
08/15/2026X00384014-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026X00277362-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00377568-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/26/2026X00372599-I1Request digital key ↗
▸Applications & Permits60
▸BISPLAN / WORK APPROVAL APPLICATION48
03/24/2025210049525Open ↗
11/15/2024220414237Open ↗
11/15/2024220129322Open ↗
Showing 3 of 48 on file for this type
▸BISWORK PERMIT APPLICATION8
10/13/2020220152812Open ↗
08/27/2020220152812Open ↗
02/10/2020220152812Open ↗
Showing 3 of 8 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
03/05/2025240205684Open ↗
Showing 1 of 2 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/17/2023220152812Open ↗
▸BISBPP-16 - Application for waiver of curb alignment and/or sidewalk and curb1
02/20/2018240205684Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISZONING DIAGRAM2
08/07/2020220152812Open ↗
04/24/2018220152812Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
04/24/2018220152812Open ↗
▸BISVERIFY TAX LOT1
03/10/2025220152812Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
08/08/2017220152812Open ↗
▸Seals & Professional Certifications21
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
02/06/2020220152812Open ↗
02/06/2020220152812Open ↗
11/28/2014220414237Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026X00277362-I1Open ↗
08/26/2026X00377568-I1Open ↗
08/26/2026X00372599-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026X00384014-I1Open ↗
08/27/2026X00384014-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/28/2014220414237Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/12/2017240205684Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/28/2014220414237Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/30/2026X00377568-I1Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING5
10/11/2023220152812Open ↗
10/10/2023220152812Open ↗
05/19/2021220152812Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
05/25/2023220152812Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
05/25/2023220152812Open ↗
▸BISSPRINKLER SYSTEMS1
05/25/2023220152812Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/24/2023220152812Open ↗
▸Safety & Tenant Protection12
▸BISSTREET TREE CHECKLIST9
04/17/2025220152812Open ↗
04/20/2021240205684Open ↗
01/22/2021240205684Open ↗
Showing 3 of 9 on file for this type
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
05/25/2023220152812Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
02/06/2020220152812Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
02/11/2020220152812Open ↗
▸Environmental & Asbestos1
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/12/2017220152812Open ↗
07/12/2017220152812Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
05/25/2023220152812Open ↗
▸BISINTERIOR LIGHTING POWER1
05/25/2023220152812Open ↗
▸BIS* DUCT LEAKAGE TESTING1
10/26/2023220152812Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
05/25/2023220152812Open ↗
▸BISFENESTRATION AREAS1
05/25/2023220152812Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
10/26/2023220152812Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY6
01/31/2020220152812Open ↗
04/30/2018220152812Open ↗
04/24/2018220152812Open ↗
Showing 3 of 6 on file for this type
▸BISHYDRO FLOW TEST LETTER2
07/27/2012220129536Open ↗
05/18/2012220129536Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
03/09/2025220152812Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
05/25/2023220152812Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
04/02/2025220152812Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
04/03/2025220152812Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/25/2023220152812Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
05/25/2023220152812Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
05/25/2023220152812Open ↗
▸BISMASONRY1
05/25/2023220152812Open ↗
▸Approvals, Objections & Sign-offs31
▸BISLETTERS - SUPPORTING DOCUMENTATION16
04/17/2025220152812Open ↗
04/20/2021240205684Open ↗
12/22/2020240205684Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
06/01/2023220152812Open ↗
12/22/2022220152812Open ↗
05/12/2021220152812Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
08/02/2011220131845Open ↗
Showing 1 of 5 on file for this type
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE1
02/07/2020220152812Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/13/2025220152812Open ↗
▸Filing & Intake Forms26
▸BISADDITIONAL INFORMATION18
10/16/2024220152812Open ↗
10/24/2023220152812Open ↗
06/12/2023220152812Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING COVER SHEET7
04/06/2018220152812Open ↗
03/08/2018220152812Open ↗
11/28/2014220414237Open ↗
Showing 3 of 7 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents11
▸BISBPP - SUPPORTING DOCUMENTATION2
03/01/2021240205684Open ↗
01/22/2021240205684Open ↗
▸BISSITE SURVEY: FINAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEMERGENCY & STANDBY POWER SYSTEMS (GENERATORS)1
05/25/2023220152812Open ↗
▸BISSMOKE CONTROL SYSTEMS1
05/25/2023220152812Open ↗
▸BISSITE SURVEY: INITIAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHUTOFF DAMPERS1
05/25/2023220152812Open ↗
▸BISLOWEST FLOOR ELEVATION1
05/25/2023220152812Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
05/02/2018240205684Open ↗
▸BISFUEL-OIL STORAGE AND FUEL-OIL PIPING SYSTEMS1
05/25/2023220152812Open ↗
▸BISMAINTENANCE INFORMATION1
05/25/2023220152812Open ↗