← Back
Predominantly retail with other uses
3308 WHITE PLAINS ROAD
BRONX · BIN 2056305
💬 Discuss this project
1930Year Built
2Stories
K4Building Class
R6Zoning
7,920 sfGross Floor Area
6Units
Rent Stabilized145 Open Violations ▸
Predominantly retail with other uses · Owner of record: 3308 BRONX LLC · 3,645 sf lot · 2.17 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction17p · 2 filings · 12 docs
Floor 1Under Construction14p · 2 filings · 12 docs
CellarUnder Construction12p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
776 EAST 161 ST1507/08/2026
3308 BRONX LLC303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/18/2022$1.4M—— → —$177/sf building
10/18/2016$1.2M—Private party → AJ810 BUILDING LLC$148/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CMO ASSOCIATES LLC510/02/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GENESIS NYC CONSTRUCTIONGeneral Contractor207/08/2026
CROSSFIELD PLBG.&HTGPlumbing207/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SUPERIOR - HOME INSPECTIO1804204/14/2025
Building Lifecycle
All (76)Filed (5)Permit Issued (4)Violation (60)Inspection (5)Special Inspection (2)
08/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/06/2026
Permit issued — Plumbing
X01117684-I1-PL
05/05/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/30/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, open)
I
10/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/02/2025
Filed — Alteration
2ND FL: REPLACE 1 TUB, 1 LAV, 1 WC, 1 KITCHEN SINK, & 1 GAS RANGE IN EACH OF THE 2 APTS. 1ST FL: REPLACE 1 WC & 1 LAV, REMOVED ALL GAS PIPING, COMMERCIAL SINKS & COOKING EQUIPMENTS OF PRIOR RESTAURANT. CEL: REMOVED 1 BOILER #99487, REPL 1 HWH, ADD 1 HWH
X01117684-P2
08/29/2025
Permit issued — Mechanical Systems
X01117641-S1-MS
08/19/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/05/2025
Violation issued (HPD, open)
A
04/14/2025
Filed — Alteration
INSTALLATION of 4 EXTERIOR NON-GAS DUCTLESS WALL MOUNTED SPLIT HEAT PUMP CONDENSERS AND 5 INTERIOR WALL MOUNTED AIR HANDLERS.
X01117641-S1
04/07/2025
Filed — Alteration
2ND FL: REPLACE 1 TUB, 1 LAV, 1 WC, 1 KITCHEN SINK, & 1 GAS RANGE IN EACH OF THE 2 APTS. 1ST FL: REPLACE 1 WC & 1 LAV, REMOVED ALL GAS PIPING, COMMERCIAL SINKS & COOKING EQUIPMENTS OF PRIOR RESTAURANT. CEL: REMOVED 1 BOILER #99487, REPL 1 HWH, ADD 1 HWH
X01117684-P1
12/09/2024
Permit issued — General Construction
X01117641-I1-GC
11/25/2024
Violation issued (HPD, open)
I
11/20/2024
Permit issued — Plumbing
X01117684-I1-PL
10/02/2024
Filed — Alteration
2ND FL: REPLACE 1 TUB, 1 LAV, 1 WC, 1 KITCHEN SINK, & 1 GAS RANGE IN EACH OF THE 2 APTS. 1ST FL: REPLACE 1 WC & 1 LAV, REMOVED ALL GAS PIPING, COMMERCIAL SINKS & COOKING EQUIPMENTS OF PRIOR RESTAURANT. CEL: REMOVED 1 BOILER #99487, REPL 1 HWH, ADD 1 HWH
X01117684-I1
10/01/2024
Filed — Alteration
INSTALLATION of 4 EXTERIOR NON-GAS DUCTLESS WALL MOUNTED SPLIT HEAT PUMP CONDENSERS AND 5 INTERIOR WALL MOUNTED AIR HANDLERS.
X01117641-I1
09/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Steven Williams
09/26/2024
Special inspection requirement — Final
CHRISTIAN ONYECHI
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/15/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/14/2024
Violation issued (HPD, open)
B
05/14/2024
Violation issued (HPD, open)
B
05/14/2024
Violation issued (HPD, closed)
C
05/14/2024
Violation issued (HPD, open)
C
05/14/2024
Violation issued (HPD, open)
B
05/14/2024
Violation issued (HPD, open)
B
04/03/2024
Violation issued (HPD, open)
A
01/13/2024
Violation issued (ECB, open)
Unknown
11/29/2023
Violation issued (HPD, open)
C
11/29/2023
Violation issued (HPD, open)
C
11/29/2023
Violation issued (HPD, open)
B
11/29/2023
Violation issued (HPD, open)
B
11/29/2023
Violation issued (HPD, open)
B
11/29/2023
Violation issued (HPD, open)
B
11/29/2023
Violation issued (HPD, open)
B
11/29/2023
Violation issued (HPD, open)
C
11/29/2023
Violation issued (HPD, open)
B
11/29/2023
Violation issued (HPD, open)
B
11/29/2023
Violation issued (HPD, open)
B
11/29/2023
Violation issued (HPD, open)
B
11/29/2023
Violation issued (HPD, open)
B
11/29/2023
Violation issued (HPD, open)
B
11/29/2023
Violation issued (HPD, open)
C
11/29/2023
Violation issued (HPD, open)
B
11/29/2023
Violation issued (HPD, open)
B
11/29/2023
Violation issued (HPD, open)
C
11/29/2023
Violation issued (HPD, open)
B
11/29/2023
Violation issued (HPD, open)
C
11/29/2023
Violation issued (HPD, open)
B
11/29/2023
Violation issued (HPD, open)
B
11/29/2023
Violation issued (HPD, open)
A
11/29/2023
Violation issued (HPD, open)
B
11/29/2023
Violation issued (HPD, open)
C
11/29/2023
Violation issued (HPD, open)
C
11/29/2023
Violation issued (HPD, open)
B
11/29/2023
Violation issued (HPD, open)
B
11/29/2023
Violation issued (HPD, open)
B
11/29/2023
Violation issued (HPD, open)
B
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG05/06/2026
DOB NOWMechanical SystemsPermit IssuedGENESIS NYC CONSTRUCTION08/29/2025
DOB NOWGeneral ConstructionPermit IssuedGENESIS NYC CONSTRUCTION12/09/2024
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG11/20/2024
BISOTISSUEDBROOKES PLUMBING & HEATING10/03/1996
BISPLISSUEDROY B PLUMBING & HEATING10/03/1996
1 project · most recent 04/14/2025
Others
FiledStatusContractorScopeMake / Model / Capacity
04/14/2025Permit IssuedGENESIS NYC CONSTRUCTIONOthers
Other
Gree MODEL # LIV18HP230V1R32AO 36,000 BTU · Pump ×2
LIV09HP230V1R32AO 9,000 BTU · Pump ×1
MUL18HP230V1R32AO 18,000 BTU · Pump ×1
1 project · most recent 10/02/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/02/2025Permit IssuedCROSSFIELD PLBG.&HTGGas, Water/Sanitary
2 projects · most recent 01/07/2025
General Wiring
FiledStatusContractorScope
01/07/2025Permit IssuedKWONG MING ELECTRIC INCGeneral Wiring
01/03/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/16/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/05/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
09/26/2024Structural Stability – Alterations of existing buildingsSteven Williamsspecial
09/26/2024FinalCHRISTIAN ONYECHIprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/19/2026X01117641-I1Request digital key ↗
08/19/2026X01117641-S1Request digital key ↗
08/18/2026X01117684-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/19/2026X01117641-S1Open ↗
08/19/2026X01117641-I1Open ↗
08/18/2026X01117684-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026X01117641-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026X01117641-I1Open ↗