← Back
BuildNYC
Two family frame
3309 BAYCHESTER AVENUE
BRONX · BIN 2065417
💬 Discuss this project
1925Year Built
2Stories
B2Building Class
R4Zoning
2,080 sfGross Floor Area
2Units
Rent Stabilized19 Active Violations ▸FDNY Report ↗
Two family frame · 2,500 sf lot · 0.83 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofPhotovoltaic solar panel installationUnder Construction1p · 1 filing · 7 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/09/2018$785K—MAJOR DEVELOPMENT 52 CORP. → Private party$377/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering110/08/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Joseph Weinstein ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272110/08/2026
Building Lifecycle
10/15/2026
Permit issued — Solar
X01469004-I1-SL
10/08/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01469004-I1
10/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/08/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
10/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
29 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSunrun Installation Service10/15/2026
2 projects · most recent 10/08/2026
General Wiring
FiledStatusContractorScope
10/08/2026Permit IssuedSunrun Solar ElectlGeneral Wiring
11/30/2021Permit IssuedJoseph Weinstein Electric—
1 project · most recent 10/08/2026
FiledStatusContractorScope
10/08/2026Permit IssuedSunrun Installation Service—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/08/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/08/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
10/02/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/02/2026Energy Code Compliance InspectionsWalid Abdullaprogress
10/02/2026FinalWalid Abdullaprogress
7 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account