💬 Discuss this project
2000Year Built
2Stories
C6Building Class
R3-2Zoning
19,955 sfGross Floor Area
10Units
Rent Stabilized6 Active Violations ▸FDNY Report ↗
Walk-up cooperative · 17,050 sf lot · 1.17 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSolar electronic generating system installationUnder Construction7p · 3 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Celebratio403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tom Petersen210/07/2026
Parker and West Engineering106/18/2026
M-Con Engineering106/11/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Source ElectricElectrical103/22/2026
Kamtech Restorationspecialty_contractor109/19/2026
Sunrun Installation ServiceGeneral Contractor106/27/2026
Sustainable StrategiesGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Thomas Petersen Architect7854210/07/2026
Parker and West Engineering5272106/18/2026
M-Con Engineering7341106/11/2025
Building Lifecycle
All (34)Filed (4)Permit Issued (3)Violation (12)Special Inspection (15)
10/07/2026
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
S01461978-P1
10/07/2026
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
10/07/2026
Special inspection requirement — Final
TOM PETERSEN
10/07/2026
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
10/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
10/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
09/18/2026
Permit issued — Solar
S01461978-I1-SL
09/17/2026
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
S01461978-I1
09/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
09/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
09/17/2026
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
09/17/2026
Special inspection requirement — Final
TOM PETERSEN
09/17/2026
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
06/23/2026
Permit issued — Solar
S01419101-I1-SL
06/18/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01419101-I1
05/08/2026
Violation issued (HPD, open)
A
06/17/2025
Permit issued — Solar
S01239875-I1-SL
06/13/2025
Violation issued (HPD, open)
A
06/11/2025
Filed — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
S01239875-I1
06/11/2025
Special inspection requirement — Air barrier - visual inspection
Michelle Contri
06/11/2025
Special inspection requirement — Final
Michelle Contri
06/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Michelle Contri
06/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michelle Contri
06/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michelle Contri
04/16/2024
Violation issued (HPD, open)
A
03/30/2023
Violation issued (HPD, open)
A
03/09/2022
Violation issued (HPD, open)
A
04/19/2021
Violation issued (HPD, open)
A
04/19/2021
Violation issued (HPD, closed)
I
10/25/2018
Violation issued (HPD, closed)
I
12/07/2017
Violation issued (HPD, closed)
I
11/25/2016
Violation issued (HPD, closed)
I
10/19/2015
Violation issued (HPD, closed)
I
03/03/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedKamtech Restoration09/18/2026
DOB NOWSolarPermit IssuedSunrun Installation Service06/23/2026
DOB NOWSolarPermit IssuedSustainable Strategies06/17/2025
BISPLISSUEDDuo Plumbing & Heating03/21/2001
BIS—ISSUEDClebration & Skyline Homes09/25/2000
BISPLISSUEDDuo Plumbing & Heating03/20/2000
BIS—ISSUEDClebration & Skyline Homes11/30/1999
4 projects · most recent 09/17/2026
General Wiring
FiledStatusContractorScope
09/17/2026Permit IssuedBerger Quality Electrical Con—
06/18/2026CompleteSunrun Solar Electl—
09/10/2025Permit IssuedSNB Electrical ContngGeneral Wiring
06/11/2025CompleteSource Electric1 meters
3 projects · most recent 10/07/2026
FiledStatusContractorScope
10/07/2026Permit IssuedKamtech Restoration14 panels, 6.16 kw, 294.28 roof_area_sqft
06/18/2026Permit IssuedSunrun Installation Service15 panels, 6.75 kw, 315 roof_area_sqft
06/11/2025Permit IssuedSustainable Strategies18 panels, 6.03 kw, 769 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
10/07/2026Air barrier - visual inspectionTOM PETERSENenergy_progress
10/07/2026FinalTOM PETERSENprogress
10/07/2026Energy Code Compliance InspectionsTOM PETERSENprogress
10/07/2026Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
10/07/2026Fire-Resistant Penetrations and JointsTOM PETERSENspecial
09/17/2026Fire-Resistant Penetrations and JointsTOM PETERSENspecial
09/17/2026Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
09/17/2026Energy Code Compliance InspectionsTOM PETERSENprogress
09/17/2026FinalTOM PETERSENprogress
09/17/2026Air barrier - visual inspectionTOM PETERSENenergy_progress
06/11/2025Air barrier - visual inspectionMichelle Contrienergy_progress
06/11/2025FinalMichelle Contriprogress
06/11/2025Energy Code Compliance InspectionsMichelle Contriprogress
06/11/2025Structural Stability – Alterations of existing buildingsMichelle Contrispecial
06/11/2025Fire-Resistant Penetrations and JointsMichelle Contrispecial
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
10/08/2026S01461978-P1Request digital key ↗
10/08/2026S01461978-I1Request digital key ↗
08/19/2026S01239875-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature4
10/09/2026S01461978-P1Open ↗
10/09/2026S01461978-P1Open ↗
09/01/2026S01239875-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
10/08/2026S01461978-P1Open ↗
09/19/2026S01461978-I1Open ↗
08/19/2026S01239875-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
10/09/2026S01461978-P1Open ↗
09/01/2026S01239875-I1Open ↗