1960Year Built
1Stories
E1Building Class
M1-1Zoning
44,000 sfGross Floor Area
2Units
17 Open Violations 16 unresolved · 1 paperwork only ▸FDNY Report ↗
General warehouse · Owner of record: DITMAS ASSOCIATES, . · 44,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Floor 136p · 1 filing · 20 docs
Mezzanine22p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DITMAS ASSOC103/22/2026
DITMAS REALTY103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHOK ARCHITECTURE DESIGN, PL/1012/13/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AUTOMOTIVE FACILITY SVCSGeneral Contractor603/21/2026
ELMAC ELECTRIC INC.Electrical103/22/2026
NYC PLUMBING & HEATING INFire Protection107/08/2026
NYC PLUMBING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASHOK ARCHITECTURE DESIGN60271012/13/2024
Building Lifecycle
All (134)Filed (10)Permit Issued (5)Signed Off (2)Violation (30)Inspection (7)Objection (50)Special Inspection (30)
12/23/2024
Special inspection requirement — Fenestration areas
Ashish Patel
12/23/2024
Special inspection requirement — Fenestration air leakage
Ashish Patel
12/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Ashish Patel
12/23/2024
Special inspection requirement — Maintenance information
Ashish Patel
12/23/2024
Special inspection requirement — Shutoff dampers
Ashish Patel
12/23/2024
Special inspection requirement — Final
Ashish Patel
12/23/2024
Special inspection requirement — Exterior lighting power
Ashish Patel
12/23/2024
Special inspection requirement — Lighting controls
Ashish Patel
12/23/2024
Special inspection requirement — Protection of exposed foundation insulation
Ashish Patel
12/23/2024
Special inspection requirement — Duct leakage testing, insulation and design
Ashish Patel
12/23/2024
Special inspection requirement — Air barrier - visual inspection
Ashish Patel
12/23/2024
Special inspection requirement — Ventilation and air distribution system
Ashish Patel
12/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
Ashish Patel
12/23/2024
Special inspection requirement — Insulation placement and R values
Ashish Patel
12/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
Ashish Patel
12/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
Ashish Patel
12/23/2024
Special inspection requirement — Mechanical Systems
Ashish Patel
12/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Ashish Patel
12/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ashish Patel
12/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Ashish Patel
12/23/2024
Special inspection requirement — Interior lighting power
Ashish Patel
12/13/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Modification of Existing Sprinkler System to add 3 Sprinkler Heads in the New Paint Spray Booth + 1 Sprinkler Head in the Mixing Room and 1 Sprinkler inside the Exhaust and Return Air Ducts to the Paint Spray Booth.
B00960242-P7
11/14/2024
Special inspection requirement — Fire-Resistance Rated Construction
Ashish Patel
11/14/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Ashish Patel
11/14/2024
Special inspection requirement — Final
Ashish Patel
11/14/2024
Special inspection requirement — Exterior lighting power
Ashish Patel
11/14/2024
Special inspection requirement — Fenestration air leakage
Ashish Patel
11/14/2024
Special inspection requirement — Energy Code Compliance Inspections
Ashish Patel
11/14/2024
Special inspection requirement — Duct leakage testing, insulation and design
Ashish Patel
11/14/2024
Special inspection requirement — HVAC-R and service water heating system controls
Ashish Patel
11/14/2024
Special inspection requirement — Fenestration areas
Ashish Patel
10/24/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/03/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Modification of Existing Sprinkler System to add 3 Sprinkler Heads in the New Paint Spray Booth + 1 Sprinkler Head in the Mixing Room and 1 Sprinkler inside the Exhaust and Return Air Ducts to the Paint Spray Booth.
B00960242-P6
09/06/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/26/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Modification of Existing Sprinkler System to add 3 Sprinkler Heads in the New Paint Spray Booth + 1 Sprinkler Head in the Mixing Room and 1 Sprinkler inside the Exhaust and Return Air Ducts to the Paint Spray Booth.
B00960242-P5
06/22/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
Modification of Existing Sprinkler System to add 3 Sprinkler Heads in the New Paint Spray Booth + 1 Sprinkler Head in the Mixing Room and 1 Sprinkler inside the Exhaust and Return Air Ducts to the Paint Spray Booth.
B00960242-S1
06/13/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/12/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Modification of Existing Sprinkler System to add 3 Sprinkler Heads in the New Paint Spray Booth + 1 Sprinkler Head in the Mixing Room and 1 Sprinkler inside the Exhaust and Return Air Ducts to the Paint Spray Booth.
B00960242-P4
05/26/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
Modification of Existing Sprinkler System to add 3 Sprinkler Heads in the New Paint Spray Booth + 1 Sprinkler Head in the Mixing Room and 1 Sprinkler inside the Exhaust and Return Air Ducts to the Paint Spray Booth.
B00960242-S2
05/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/20/2024
Permit issued — Mechanical Systems
B00960242-I1-GC-CX
05/20/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/08/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/03/2024
Permit issued — Mechanical Systems
B00960242-I1-GC-CX
04/23/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Modification of Existing Sprinkler System to add 3 Sprinkler Heads in the New Paint Spray Booth + 1 Sprinkler Head in the Mixing Room and 1 Sprinkler inside the Exhaust and Return Air Ducts to the Paint Spray Booth.
B00960242-P3
04/12/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Modification of Existing Sprinkler System to add 3 Sprinkler Heads in the New Paint Spray Booth + 1 Sprinkler Head in the Mixing Room and 1 Sprinkler inside the Exhaust and Return Air Ducts to the Paint Spray Booth.
B00960242-P2
04/04/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Modification of Existing Sprinkler System to add 3 Sprinkler Heads in the New Paint Spray Booth + 1 Sprinkler Head in the Mixing Room and 1 Sprinkler inside the Exhaust and Return Air Ducts to the Paint Spray Booth.
B00960242-P1
03/14/2024
Permit issued — General Construction
B00960242-I1-GC-CX
01/08/2024
Permit issued — Sprinklers
B00960242-S2-EW-SP
01/08/2024
Permit issued — Plumbing
B00960242-S1-PL
01/01/2024
Objection resolved — Addressed
01/01/2024
Objection resolved — Addressed
01/01/2024
Objection resolved — Addressed
01/01/2024
Objection resolved — Addressed
01/01/2024
Objection resolved — Addressed
01/01/2024
Objection resolved — Addressed
01/01/2024
Objection resolved — Addressed
01/01/2024
Objection resolved — Addressed
01/01/2024
Objection resolved — Addressed
Latest 60 of 134 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedAUTOMOTIVE FACILITY SVCS05/20/2024
DOB NOWMechanical SystemsPermit IssuedAUTOMOTIVE FACILITY SVCS05/03/2024
DOB NOWGeneral ConstructionPermit IssuedAUTOMOTIVE FACILITY SVCS03/14/2024
DOB NOWSprinklersSigned-offNYC PLUMBING & HEATING IN01/08/2024
DOB NOWPlumbingSigned-offNYC PLUMBING & HEATING IN01/08/2024
1 project · most recent 12/13/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/13/2024Permit IssuedAUTOMOTIVE FACILITY SVCSVentilation Systems
Ventilation
Accudraft Accudraft 1,500 BTU ×4
1 project · most recent 12/13/2024
Sprinkler System
FiledStatusContractorScope
12/13/2024Signed-offNYC PLUMBING & HEATING INSprinkler System
1 project · most recent 12/13/2024
Gas Water/Sanitary
FiledStatusContractorScope
12/13/2024Signed-offNYC PLUMBING & HEATING INGas, Water/Sanitary
3 projects · most recent 06/07/2025
General Wiring
FiledStatusContractorScope
06/07/2025CompleteRM ELECTRIC CO., INC.2 meters, 1 new_meters
03/12/2024CompleteELMAC ELECTRIC INC.General Wiring
10/31/2023CancelledMAN ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/24/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/06/2024Fail-Final CND-Occupancy InspectionFailView ↗
08/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/13/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/20/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/08/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 105
DateRequirementInspectorRole
12/23/2024Air barrier - visual inspectionAshish Patelenergy_progress
12/23/2024Fenestration areasAshish Patelenergy_progress
12/23/2024Maintenance informationAshish Patelenergy_progress
12/23/2024Duct leakage testing, insulation and designAshish Patelenergy_progress
12/23/2024Fenestration air leakageAshish Patelenergy_progress
12/23/2024Fenestration and door U-factor and product ratingsAshish Patelenergy_progress
12/23/2024Interior lighting powerAshish Patelenergy_progress
12/23/2024Protection of exposed foundation insulationAshish Patelenergy_progress
12/23/2024Shutoff dampersAshish Patelenergy_progress
12/23/2024HVAC-R and service water heating equipmentAshish Patelenergy_progress
12/23/2024Lighting controlsAshish Patelenergy_progress
12/23/2024HVAC-R and service water piping design and insulationAshish Patelenergy_progress
12/23/2024Exterior lighting powerAshish Patelenergy_progress
12/23/2024Insulation placement and R valuesAshish Patelenergy_progress
12/23/2024Ventilation and air distribution systemAshish Patelenergy_progress
12/23/2024Structural Stability – Alterations of existing buildingsAshish Patelspecial
12/23/2024Mechanical SystemsAshish Patelspecial
12/23/2024FinalAshish Patelprogress
12/23/2024Fire-Resistance Rated ConstructionAshish Patelprogress
12/23/2024Energy Code Compliance InspectionsAshish Patelprogress
12/23/2024HVAC-R and service water heating system controlsAshish Patelenergy_progress
11/14/2024Exterior lighting powerAshish Patelenergy_progress
11/14/2024Mechanical SystemsAshish Patelspecial
11/14/2024Structural Stability – Alterations of existing buildingsAshish Patelspecial
11/14/2024Energy Code Compliance InspectionsAshish Patelprogress
Latest 25 of 105.
▾Documents — 142 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/26/2026B00960242-P6Request digital key ↗
08/26/2026B00960242-P7Request digital key ↗
08/26/2026B00960242-P5Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications113
▸DOB NOWProgress Inspector Seal & Signature90
09/27/2026B00960242-P6Open ↗
09/27/2026B00960242-P6Open ↗
09/27/2026B00960242-P6Open ↗
Showing 3 of 90 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/27/2026B00960242-P6Open ↗
09/27/2026B00960242-P6Open ↗
09/01/2026B00960242-P4Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026B00960242-P7Open ↗
08/26/2026B00960242-P6Open ↗
08/26/2026B00960242-P5Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/26/2026B00960242-P7Open ↗
08/26/2026B00960242-P6Open ↗
08/26/2026B00960242-P5Open ↗
Showing 3 of 10 on file for this type
▸Other Documents9
▸DOB NOWProperty Ownership Certification4
08/26/2026B00960242-P7Open ↗
08/26/2026B00960242-P6Open ↗
08/26/2026B00960242-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026B00960242-I1Open ↗
08/13/2026B00960242-P7Open ↗
08/13/2026B00960242-P6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B00960242-I1Open ↗