Public elementary, junior or senior high
Juan Morel Campos Campus
331 MARCY AVENUE · BIN 3061064
💬 Discuss this project
1959Year Built
4Stories
W1Building Class
R6Zoning
420,000 sfGross Floor Area
0Units
LL97 Covered18 Open Violations 4 unresolved · 14 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 105,000 sf lot · 4 FAR built · Flood zone X500
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
RoofUnder Construction9p · 1 filing · 20 docs
Floor 3Under Construction8p · 1 filing · 20 docs
Floor 2Under Construction9p · 1 filing · 20 docs
Floor 1Under Construction9p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY1307/08/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPT OF EDUCATION IS711603/22/2026
DEPARTMENT OF EDUCATION1103/22/2026
DOE IS 71 040503/22/2026
DOE 040403/22/2026
DEPT OF EDUC. IS 71203/22/2026
DEPARTMENT OF EDUCATION 0203/22/2026
D.O.E. I.S.71 0103/22/2026
I.S.71 D.O.E. 0603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERI GOLDMAN ENGINEERING206/12/2026
JUNE DANIEL ARCHITECT212/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GG ENGINEERING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OM GENERAL CONTRACTORS COGeneral Contractor707/08/2026
FRANCIS RICHARDSElectrical503/21/2026
GIOVANNI DITURIElectrical103/21/2026
HEXAGON CONST & ELECL GRPElectrical103/22/2026
ACE ELEC'L CONSTRUCTIONElectrical103/22/2026
PATRUNO, PASQUALEElectrical103/21/2026
SYED-NAQVI ALTAFElectrical103/21/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
MULLANEY, JAMESElectrical103/21/2026
CHARAN ELEC'L ENTERP'S INElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.317406/12/2026
Building Lifecycle
All (97)Filed (4)Permit Issued (5)Violation (60)Objection (7)Special Inspection (21)
07/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAXIM KORNGOLD
07/15/2026
Special inspection requirement — Maintenance information
MAXIM KORNGOLD
07/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MAXIM KORNGOLD
07/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
MAXIM KORNGOLD
07/15/2026
Special inspection requirement — Final
MAXIM KORNGOLD
07/15/2026
Special inspection requirement — Energy Code Compliance Inspections
MAXIM KORNGOLD
07/15/2026
Special inspection requirement — Mechanical Systems
MAXIM KORNGOLD
07/08/2026
Objection resolved — Addressed
06/23/2026
Objection raised — Other
06/12/2026
Filed — Alteration
Remove and install new walk-in freezer on first floor. Construct chase on 2nd, 3rd floor. Install condenser unit on roof.
B00995396-P3
06/05/2026
Special inspection requirement — Maintenance information
MAXIM KORNGOLD
06/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAXIM KORNGOLD
06/05/2026
Special inspection requirement — Mechanical Systems
MAXIM KORNGOLD
06/05/2026
Special inspection requirement — Energy Code Compliance Inspections
MAXIM KORNGOLD
06/05/2026
Special inspection requirement — Final
MAXIM KORNGOLD
06/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MAXIM KORNGOLD
06/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
MAXIM KORNGOLD
06/02/2026
Violation issued (ECB, open)
Construction
06/02/2026
Violation issued (ECB, open)
Construction
06/02/2026
Violation issued (ECB, open)
Construction
06/02/2026
Violation issued (ECB, open)
Construction
03/27/2026
Violation issued (FDNY_ORDER, closed)
03/27/2026
Violation issued (FDNY_ORDER, closed)
03/27/2026
Violation issued (FDNY_ORDER, closed)
03/27/2026
Violation issued (FDNY_ORDER, closed)
03/27/2026
Violation issued (FDNY_ORDER, closed)
01/02/2026
Objection raised — Admin
12/18/2025
Filed — Alteration
Remove and install new walk-in freezer on first floor. Construct chase on 2nd, 3rd floor. Install condenser unit on roof.
B00995396-P2
12/17/2025
Special inspection requirement — Final
MIKHAIL ZEYGMAN
12/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAXIM KORNGOLD
12/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAXIM KORNGOLD
12/09/2025
Permit issued — Mechanical Systems
B00995396-I1-MS
12/08/2025
Permit issued — General Construction
B00995396-S1-GC-CX
12/08/2025
Permit issued — Mechanical Systems
B00995396-I1-MS
11/20/2025
Violation issued (FDNY_NOV, closed)
09/19/2025
Violation issued (FDNY_ORDER, closed)
09/19/2025
Violation issued (FDNY_ORDER, closed)
09/19/2025
Violation issued (FDNY_ORDER, closed)
09/19/2025
Violation issued (FDNY_ORDER, closed)
09/19/2025
Violation issued (FDNY_ORDER, closed)
09/19/2025
Violation issued (FDNY_ORDER, closed)
06/12/2025
Violation issued (ECB, open)
Construction
06/12/2025
Violation issued (ECB, open)
Construction
05/05/2025
Permit issued — Mechanical Systems
B00995396-I1-MS
05/02/2025
Permit issued — Structural
B00995396-S1-GC-CX
04/22/2025
Violation issued (ECB, open)
Construction
05/29/2024
Violation issued (FDNY_ORDER, closed)
05/29/2024
Violation issued (FDNY_ORDER, closed)
05/29/2024
Violation issued (FDNY_ORDER, closed)
05/10/2024
Objection resolved — Addressed
05/09/2024
Special inspection requirement — Insulation placement and R values
MAXIM KORNGOLD
04/22/2024
Objection resolved — Addressed
03/22/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAXIM KORNGOLD
02/06/2024
Objection raised — Other
02/06/2024
Objection raised — Other
01/30/2024
Filed — Alteration
Remove and install new walk-in freezer on first floor. Construct chase on 2nd, 3rd floor. Install condenser unit on roof.
B00995396-S1
01/25/2024
Filed — Alteration
Remove and install new walk-in freezer on first floor. Construct chase on 2nd, 3rd floor. Install condenser unit on roof.
B00995396-I1
01/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAXIM KORNGOLD
01/24/2024
Special inspection requirement — Final
MAXIM KORNGOLD
12/14/2023
Violation issued (FDNY_ORDER, closed)
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offOM GENERAL CONTRACTORS CO12/09/2025
DOB NOWGeneral ConstructionPermit IssuedOM GENERAL CONTRACTORS CO12/08/2025
DOB NOWMechanical SystemsSigned-offOM GENERAL CONTRACTORS CO12/08/2025
DOB NOWMechanical SystemsSigned-offOM GENERAL CONTRACTORS CO05/05/2025
DOB NOWStructuralPermit IssuedOM GENERAL CONTRACTORS CO05/02/2025
BISPLISSUEDVARSITY PLBG AND HTG INC10/14/2025
BISOTISSUEDF & S GENERAL CONSTRUCTIO03/26/2025
BISOTISSUEDF & S GENERAL CONSTRUCTIO03/26/2025
BISPLISSUEDVARSITY PLBG AND HTG INC10/17/2024
BISMHISSUEDTHERMO TECH MECHANICAL I*06/13/2024
BISOTISSUEDF & S GENERAL CONSTRUCTIO04/04/2024
BISMHISSUEDTHERMO TECH MECHANICAL I*10/11/2023
BISPLISSUEDVARSITY PLBG AND HTG INC09/14/2023
BISOTISSUEDF & S GENERAL CONSTRUCTIO09/01/2023
BISOTISSUEDF & S GENERAL CONSTRUCTIO09/01/2023
BISOTISSUEDZAMAN CONSTRUCTION CORP10/05/2018
BISEQISSUEDCREAMER ENVIRONMENTAL INC07/12/2017
BISOTISSUEDZAMAN CONSTRUCTION CORP06/28/2017
BISMHISSUEDACS SYSTEM ASSOCIATES INC.03/27/2017
BISPLISSUEDROBERT PARCHMENT P&H.INC03/16/2017
BISOTISSUEDZAMAN CONSTRUCTION CORP02/22/2017
BISOTISSUEDNORTHEAST RESTORATION COR01/12/2017
BISMHISSUEDACS SYSTEM ASSOCIATES INC.05/26/2016
BISPLISSUEDROBERT PARCHMENT P&H.INC05/26/2016
BISOTISSUEDNORTHEAST RESTORATION COR05/26/2016
BISSPISSUEDVARSITY PLBG & HTG INC11/03/2015
BISPLISSUEDEAGLE 1 MECHANICAL, INC10/23/2015
BISOTISSUEDWHITESTONE CONSTRUCTION CORP04/09/2015
BISOTISSUEDA.T.J. ELECTRICAL CO INC02/11/2015
BISSPISSUEDVARSITY PLBG & HTG INC11/04/2014
BISPLISSUEDEAGLE 1 MECHANICAL, INC07/24/2014
BISOTISSUEDCENTENNIAL ELEVATOR INDUS05/29/2014
BISMHISSUEDCENTENNIAL ELEVATOR INDUS05/29/2014
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/27/2014
BISSPISSUEDVARSITY PLBG & HTG INC11/18/2013
BISOTISSUEDWHITESTONE CONSTRUCTION CORP10/29/2013
BISEQISSUEDWHITESTONE CONSTRUCTION CORP09/19/2013
BISEQISSUEDWHITESTONE CONSTRUCTION CORP09/17/2013
BISEQISSUEDWHITESTONE CONSTRUCTION CORP09/04/2013
BISPLISSUEDEAGLE 1 MECHANICAL, INC07/24/2013
+ 15 more permits on file
1 project · most recent 06/12/2026
Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
06/12/2026Signed-offOM GENERAL CONTRACTORS CORefrigeration Systems
Refrigeration
Rsg 05-02589 8,800 BTU · Fan Coil Indoor ×2
MSLD020MC 6,434 BTU · Condensing Unit ×2
Bally BEZA025L8-HT3D 8,915 BTU · Condensing Unit ×1
BLP209LE-S2D 8,915 BTU · Fan Coil Indoor ×1
15 projects · most recent 03/09/2026
General Wiring
FiledStatusContractorScope
03/09/2026CompleteTRIPLE I ELEC'L CONTR'G I—
06/20/2025CompleteEVEREST ELECTRIC CORP—
12/26/2024CompleteEVEREST ELECTRIC CORP—
12/20/2024Permit IssuedMNBC ELECTRICAL CORPGeneral Wiring
01/16/2024CompleteACE ELEC'L CONSTRUCTIONGeneral Wiring
09/09/2023Permit IssuedHEXAGON CONST & ELECL GRP—
09/08/2023CompleteCHARAN ELEC'L ENTERP'S IN—
11/10/2022CompleteGEMINI ELECTRIC CO., INC.—
09/19/2022CompleteABM ELECTRIC, INC—
07/22/2022CompleteCHARAN ELEC'L ENTERP'S IN—
12/20/2021CompleteABM ELECTRIC, INCGeneral Wiring
11/22/2021CompleteABM ELECTRIC, INC—
10/03/2019CompleteCHARAN ELEC'L ENTERP'S IN—
03/18/2019Permit IssuedGEMINI ELECTRIC CO., INC.General Wiring
06/21/2018CompleteA & S ELECTRIC INC.—
1 project · most recent 06/12/2026
Concrete
FiledStatusContractorScope
06/12/2026Signed-offOM GENERAL CONTRACTORS COConcrete
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
07/15/2026Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
07/15/2026Maintenance informationMAXIM KORNGOLDenergy_progress
07/15/2026HVAC-R and service water piping design and insulationMAXIM KORNGOLDenergy_progress
07/15/2026HVAC-R and service water heating equipmentMAXIM KORNGOLDenergy_progress
07/15/2026FinalMAXIM KORNGOLDprogress
07/15/2026Energy Code Compliance InspectionsMAXIM KORNGOLDprogress
07/15/2026Mechanical SystemsMAXIM KORNGOLDspecial
06/05/2026Maintenance informationMAXIM KORNGOLDenergy_progress
06/05/2026Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
06/05/2026Mechanical SystemsMAXIM KORNGOLDspecial
06/05/2026Energy Code Compliance InspectionsMAXIM KORNGOLDprogress
06/05/2026FinalMAXIM KORNGOLDprogress
06/05/2026HVAC-R and service water piping design and insulationMAXIM KORNGOLDenergy_progress
06/05/2026HVAC-R and service water heating equipmentMAXIM KORNGOLDenergy_progress
12/17/2025FinalMIKHAIL ZEYGMANprogress
12/17/2025Structural Stability – Alterations of existing buildingsMAXIM KORNGOLDspecial
12/17/2025Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
05/09/2024Insulation placement and R valuesMAXIM KORNGOLDenergy_progress
03/22/2024Structural Stability – Alterations of existing buildingsMAXIM KORNGOLDspecial
01/25/2024Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
01/24/2024FinalMAXIM KORNGOLDprogress
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026B00995396-S1Request digital key ↗
08/26/2026B00995396-I1Request digital key ↗
08/14/2026B00995396-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION4
09/16/2016321182288Open ↗
02/05/2016321182288Open ↗
02/05/2016321182288Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION4
01/26/2017321182288Open ↗
05/27/2016321182288Open ↗
05/27/2016321182288Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
09/14/2016321182288Open ↗
▸Seals & Professional Certifications31
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
12/20/2017321182288Open ↗
12/20/2017321182288Open ↗
12/20/2017321182288Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/27/2026B00995396-I1Open ↗
08/27/2026B00995396-I1Open ↗
08/23/2026B00995396-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026B00995396-I1Open ↗
08/23/2026B00995396-P3Open ↗
08/23/2026B00995396-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026B00995396-I1Open ↗
08/26/2026B00995396-S1Open ↗
08/26/2026B00995396-P3Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
09/16/2016321182288Open ↗
02/05/2016321182288Open ↗
02/05/2016321182288Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
02/05/2016321182288Open ↗
02/05/2016321182288Open ↗
▸Trade Schedules & Equipment14
▸BISEQUIPMENT USE APPLICATION/PERMIT12
12/26/2017321182288Open ↗
12/26/2017321182288Open ↗
12/26/2017321182288Open ↗
Showing 3 of 12 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
02/24/2017321182322Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
02/05/2016321182288Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/26/2026B00995396-I1Open ↗
08/26/2026B00995396-S1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/27/2016321182288Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
12/20/2017321182288Open ↗
12/20/2017321182288Open ↗
02/05/2016321182288Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/20/2017321182288Open ↗
▸Approvals, Objections & Sign-offs15
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)4
08/14/2026B00995396-P3Open ↗
08/13/2026B00995396-P2Open ↗
08/13/2026B00995396-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/14/2026B00995396-P3Open ↗
08/13/2026B00995396-P2Open ↗
08/13/2026B00995396-I1Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
02/05/2016321182288Open ↗
02/02/2016321182322Open ↗
▸DOB NOWDEP Variance (V5) letter2
08/13/2026B00995396-I1Open ↗
08/13/2026B00995396-S1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/26/2026B00995396-I1Open ↗
08/26/2026B00995396-S1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/20/2017321182288Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
12/20/2017321182288Open ↗
02/05/2016321182288Open ↗
02/02/2016321182322Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET3
02/02/2016321182322Open ↗
02/02/2016321182288Open ↗
02/02/2016321182288Open ↗
▸BISBOROUGH INTAKE FORM1
12/20/2017321182288Open ↗
▸Other Documents5
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal5
08/26/2026B00995396-I1Open ↗
08/14/2026B00995396-P3Open ↗
08/13/2026B00995396-S1Open ↗
Showing 3 of 5 on file for this type