← Back
Three families
3315 FISH AVENUE
BRONX · BIN 2060634
💬 Discuss this project
1930Year Built
2Stories
C0Building Class
R5Zoning
3,080 sfGross Floor Area
3Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 3315 FISH AVE LLC · 2,500 sf lot · 1.23 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 11p · 1 filing · 10 docs
Basement2p · 2 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3315 FISH AVE LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/28/2021$949K—— → —$308/sf building
12/04/2020$650K—— → —$211/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
COLOMBO ARCHITECTURAL STUDIO PC611/25/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROMEL CONSTRUCTION CORPGeneral Contractor307/08/2026
JUNIOR CARTER MECH. CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292312/07/2022
Building Lifecycle
All (30)Filed (6)Permit Issued (3)Signed Off (2)Violation (14)Inspection (5)
11/18/2025
Violation issued (HPD, closed)
I
11/25/2024
Filed — Alteration
Relocate existing fire rated door in boilerroom. No change in use, egress or occupancy.
X01138865-I1
06/10/2024
Violation issued (HPD, open)
C
06/10/2024
Violation issued (HPD, open)
C
04/02/2024
Violation issued (HPD, closed)
A
11/16/2023
Violation issued (HPD, closed)
I
03/23/2023
Signed off — Alteration
Installation/replacement of plumbing fixtures in connection with General Construction Application. No change in use, egress or occupancy.
X00722209-I1
03/17/2023
Violation issued (HPD, closed)
A
03/06/2023
Signed off — Alteration
Renovate existing basement apartment as per plans filed herewith. Oil to gas conversion under subsequent Plumbing application. No change in use, egress or occupancy.
X00706979-I1
01/03/2023
Violation issued (HPD, open)
C
12/07/2022
Filed — Alteration
Installation/replacement of plumbing fixtures in connection with General Construction Application. No change in use, egress or occupancy.
X00722209-P2
11/04/2022
Filed — Alteration
Installation/replacement of plumbing fixtures in connection with General Construction Application. No change in use, egress or occupancy.
X00722209-P1
11/04/2022
Violation issued (HPD, closed)
I
11/03/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/27/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/12/2022
Permit issued — General Construction
X00706979-I1-GC
06/03/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/03/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/03/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/25/2022
Permit issued — Plumbing
X00722209-I1-PL
04/21/2022
Filed — Alteration
Installation/replacement of plumbing fixtures in connection with General Construction Application. No change in use, egress or occupancy.
X00722209-I1
04/21/2022
Permit issued — General Construction
X00706979-I1-GC
04/08/2022
Filed — Alteration
Renovate existing basement apartment as per plans filed herewith. Oil to gas conversion under subsequent Plumbing application. No change in use, egress or occupancy.
X00706979-P1
04/05/2022
Filed — Alteration
Renovate existing basement apartment as per plans filed herewith. Oil to gas conversion under subsequent Plumbing application. No change in use, egress or occupancy.
X00706979-I1
02/17/2022
Violation issued (HPD, closed)
A
02/17/2022
Violation issued (HPD, closed)
I
04/02/2021
Violation issued (HPD, closed)
I
04/02/2021
Violation issued (HPD, closed)
A
10/28/2019
Violation issued (HPD, closed)
I
10/28/2016
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offROMEL CONSTRUCTION CORP09/12/2022
DOB NOWPlumbingSigned-offJUNIOR CARTER MECH. CORP04/25/2022
DOB NOWGeneral ConstructionSigned-offROMEL CONSTRUCTION CORP04/21/2022
1 project · most recent 03/04/2022
General Wiring
FiledStatusContractorScope
03/04/2022Permit IssuedPRINCIPAL ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/03/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/27/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/03/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/03/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
11/07/2024FinalYahaira Volquez Colomboprogress
12/07/2022HVAC-R and service water heating system controlsJose Santosenergy_progress
12/07/2022Fire-Resistant Penetrations and JointsJose Santosspecial
12/07/2022HVAC-R and service water piping design and insulationJose Santosenergy_progress
12/07/2022HVAC-R and service water heating equipmentJose Santosenergy_progress
12/07/2022Maintenance informationJose Santosenergy_progress
12/06/2022Fire-Resistant Penetrations and JointsJose Santosspecial
12/06/2022Maintenance informationJose Santosenergy_progress
12/06/2022HVAC-R and service water heating equipmentJose Santosenergy_progress
12/06/2022HVAC-R and service water heating system controlsJose Santosenergy_progress
12/06/2022HVAC-R and service water piping design and insulationJose Santosenergy_progress
11/04/2022Fire-Resistant Penetrations and JointsJose Santosspecial
11/04/2022HVAC-R and service water piping design and insulationJose Santosenergy_progress
11/04/2022HVAC-R and service water heating equipmentJose Santosenergy_progress
11/04/2022HVAC-R and service water heating system controlsJose Santosenergy_progress
11/04/2022Maintenance informationJose Santosenergy_progress
04/08/2022Interior lighting powerYahaira Volquez Colomboenergy_progress
04/08/2022Lighting in dwelling unitsYahaira Volquez Colomboenergy_progress
04/08/2022Lighting in dwelling unitsYahaira Volquez Colomboenergy_progress
04/08/2022Interior lighting powerYahaira Volquez Colomboenergy_progress
04/08/2022FinalYahaira Volquez Colomboprogress
04/08/2022FinalYahaira Volquez Colomboprogress
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026X00706979-P1Request digital key ↗
08/24/2026X00706979-I1Request digital key ↗
08/23/2026X00722209-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026X00706979-I1Open ↗
08/24/2026X00706979-P1Open ↗
08/23/2026X00722209-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/19/2026X00722209-P2Open ↗
09/02/2026X00722209-I1Open ↗
08/27/2026X00706979-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/19/2026X00722209-P2Open ↗
09/02/2026X00722209-I1Open ↗
08/22/2026X00722209-P1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026X00706979-P1Open ↗
08/24/2026X00706979-I1Open ↗
08/23/2026X00722209-P2Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026X00722209-I1Open ↗
08/13/2026X00706979-I1Open ↗