332 DEGRAW STREET
💬 Discuss this project
1901Year Built
3Stories
C0Building Class
R6BZoning
3,800 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Three families · 2,500 sf lot · 1.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralFire Protection
Roof28p · 1 filing · 20 docs
Floor 426p · 1 filing · 20 docs
Floor 326p · 1 filing · 20 docs
Floor 225p · 1 filing · 20 docs
Floor 125p · 1 filing · 20 docs
Cellar29p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACER CONSTRUCTION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/26/2024$4.0M—— → —$1,039/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL CHRISTAKOS ARCHITECTURE806/29/2026
YANG ENGINEERING LLC304/28/2026
SELF EMPLOYED304/03/2026
ASR ENGINEERING PC102/18/2025
JIAN ENGINEERING PLLC1—
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO203/21/2026
ACCRETE CONSTRUCTION1003/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
Younes Abouyaala PE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACCRETE CONSTRUCTION GROUPGeneral Contractor707/08/2026
ACER CONSTRUCTION INCGeneral Contractor507/08/2026
PRECISION SPKLR SVCS LLCFire Protection207/08/2026
TOPLINE NYC INCGeneral Contractor207/08/2026
RICHARD NEUElectrical103/22/2026
NYC BUILDING SOLUTIONS COGeneral Contractor107/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JIAN ENGINEERING PLLC7397706/29/2026
AA BUILDING & INSPECTION1519304/03/2026
IP CONCRETE TESTING AND I6252108/12/2025
Building Lifecycle
All (149)Filed (15)Permit Issued (14)Signed Off (9)Violation (11)Inspection (10)Objection (60)Special Inspection (30)
08/03/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
STRUCTURAL WORK IN CONJUNCTION WITH B01076906-I1
B01076906-I1
07/02/2026
Special inspection requirement — Fenestration areas
JIAN DENG
07/02/2026
Special inspection requirement — Exterior lighting power
JIAN DENG
07/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
07/02/2026
Special inspection requirement — Air barrier - visual inspection
JIAN DENG
07/02/2026
Special inspection requirement — Interior lighting power
JIAN DENG
07/02/2026
Special inspection requirement — Fenestration air leakage
JIAN DENG
07/02/2026
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
07/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIAN DENG
07/02/2026
Special inspection requirement — Insulation placement and R values
JIAN DENG
07/02/2026
Special inspection requirement — Lighting controls
JIAN DENG
07/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
JIAN DENG
07/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JIAN DENG
07/02/2026
Special inspection requirement — Lighting in dwelling units
JIAN DENG
06/29/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
STRUCTURAL WORK IN CONJUNCTION WITH B01076906-I1
B01076906-P6
06/29/2026
Special inspection requirement — Exterior lighting power
JIAN DENG
06/29/2026
Special inspection requirement — Fenestration areas
JIAN DENG
06/29/2026
Special inspection requirement — Interior lighting power
JIAN DENG
06/29/2026
Special inspection requirement — Lighting controls
JIAN DENG
06/29/2026
Special inspection requirement — Lighting in dwelling units
JIAN DENG
06/29/2026
Special inspection requirement — Fenestration air leakage
JIAN DENG
06/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIAN DENG
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
06/29/2026
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
06/29/2026
Special inspection requirement — Air barrier - visual inspection
JIAN DENG
06/29/2026
Special inspection requirement — Insulation placement and R values
JIAN DENG
06/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
JIAN DENG
06/29/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JIAN DENG
06/08/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
STRUCTURAL WORK IN CONJUNCTION WITH B01076906-I1
B01076906-Z5
06/08/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/05/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
STRUCTURAL WORK IN CONJUNCTION WITH B01076906-I1
B01076906-S1
05/23/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
STRUCTURAL WORK IN CONJUNCTION WITH B01076906-I1
B01076906-S7
05/19/2026
Signed off — Alteration
B01390711-I1
05/14/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/12/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
STRUCTURAL WORK IN CONJUNCTION WITH B01076906-I1
B01076906-Z4
05/04/2026
Permit issued — Sprinklers
B01076906-S7-EW-SP
05/01/2026
Permit issued — Mechanical Systems
B01390711-I1-MS
04/28/2026
Filed — Alteration
B01390711-I1
04/28/2026
Signed off — Alteration
B01123896-I1
04/28/2026
Objection resolved — Resolved
04/28/2026
Objection resolved — Resolved
04/24/2026
Objection resolved — Addressed
04/24/2026
Objection resolved — Addressed
04/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
04/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
JIAN DENG
04/23/2026
Special inspection requirement — Maintenance information
JIAN DENG
04/23/2026
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
04/22/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/22/2026
Objection raised — Zoning
04/22/2026
Objection raised — Plumbing
04/22/2026
Objection raised — Zoning
04/22/2026
Objection raised — Zoning
04/20/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
STRUCTURAL WORK IN CONJUNCTION WITH B01076906-I1
B01076906-P5
04/17/2026
Signed off — Alteration
INTERIOR, NON-STRUCTURAL DEMOLITION OF EXISTING 3-FAMILY DWELLING. NO CHANGE TO OCCUPANCY, USE, OR EGRESS.
B01100665-I1
04/13/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/03/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
STRUCTURAL WORK IN CONJUNCTION WITH B01076906-I1
B01076906-P4
03/23/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
STRUCTURAL WORK IN CONJUNCTION WITH B01076906-I1
B01076906-P3
03/16/2026
Violation issued (ECB, closed)
Construction
11/20/2025
Violation issued (HPD, closed)
I
10/23/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
STRUCTURAL WORK IN CONJUNCTION WITH B01076906-I1
B01076906-P2
Latest 60 of 149 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offPRECISION SPKLR SVCS LLC05/04/2026
DOB NOWMechanical SystemsSigned-offACCRETE CONSTRUCTION GROUP05/01/2026
DOB NOWConstruction FenceSigned-offACER CONSTRUCTION INC10/09/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR08/14/2025
DOB NOWSprinklersSigned-offPRECISION SPKLR SVCS LLC07/08/2025
DOB NOWFoundationSigned-offACCRETE CONSTRUCTION GROU07/08/2025
DOB NOWStructuralSigned-offACCRETE CONSTRUCTION GROU07/08/2025
DOB NOWFoundationSigned-offACCRETE CONSTRUCTION GROU04/21/2025
DOB NOWStructuralSigned-offACCRETE CONSTRUCTION GROU04/18/2025
DOB NOWSidewalk ShedSigned-offTOPLINE NYC INC02/19/2025
DOB NOWSidewalk ShedSigned-offTOPLINE NYC INC02/19/2025
DOB NOWGeneral ConstructionPermit IssuedACER CONSTRUCTION INC02/11/2025
DOB NOWConstruction FenceSigned-offACER CONSTRUCTION INC10/15/2024
DOB NOWGeneral ConstructionSigned-offNYC BUILDING SOLUTIONS CO09/10/2024
1 project · most recent 06/29/2026
Sprinkler System
FiledStatusContractorScope
06/29/2026Signed-offPRECISION SPKLR SVCS LLCSprinkler System
1 project · most recent 06/29/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/29/2026Signed-offINFINITI ESC PLUMBING CORStorm, Water/Sanitary
2 projects · most recent 10/27/2025
General Wiring
FiledStatusContractorScope
10/27/2025CompleteK.A.B. ELECTRIC CORPGeneral Wiring
02/20/2025CompleteRICHARD NEU—
1 project · most recent 06/29/2026
Steel Concrete Masonry
FiledStatusContractorScope
06/29/2026Signed-offPRECISION SPKLR SVCS LLCSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
06/08/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/14/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/22/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/13/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/26/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/29/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/29/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/29/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/28/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 107
DateRequirementInspectorRole
07/02/2026Lighting controlsJIAN DENGenergy_progress
07/02/2026Lighting in dwelling unitsJIAN DENGenergy_progress
07/02/2026Insulation placement and R valuesJIAN DENGenergy_progress
07/02/2026Fenestration and door U-factor and product ratingsJIAN DENGenergy_progress
07/02/2026Air barrier - visual inspectionJIAN DENGenergy_progress
07/02/2026Fire-Resistant Penetrations and JointsJIAN DENGspecial
07/02/2026Structural Stability – Alterations of existing buildingsJIAN DENGspecial
07/02/2026Energy Code Compliance InspectionsJIAN DENGprogress
07/02/2026Fire-Resistance Rated ConstructionJIAN DENGprogress
07/02/2026Exterior lighting powerJIAN DENGenergy_progress
07/02/2026Fenestration air leakageJIAN DENGenergy_progress
07/02/2026Interior lighting powerJIAN DENGenergy_progress
07/02/2026Fenestration areasJIAN DENGenergy_progress
06/29/2026Exterior lighting powerJIAN DENGenergy_progress
06/29/2026Air barrier - visual inspectionJIAN DENGenergy_progress
06/29/2026Fenestration and door U-factor and product ratingsJIAN DENGenergy_progress
06/29/2026Insulation placement and R valuesJIAN DENGenergy_progress
06/29/2026Lighting in dwelling unitsJIAN DENGenergy_progress
06/29/2026Lighting controlsJIAN DENGenergy_progress
06/29/2026Fire-Resistance Rated ConstructionJIAN DENGprogress
06/29/2026Energy Code Compliance InspectionsJIAN DENGprogress
06/29/2026Structural Stability – Alterations of existing buildingsJIAN DENGspecial
06/29/2026Fire-Resistant Penetrations and JointsJIAN DENGspecial
06/29/2026Interior lighting powerJIAN DENGenergy_progress
06/29/2026Fenestration areasJIAN DENGenergy_progress
Latest 25 of 107.
▾Documents — 112 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/24/2026B01100665-I1Request digital key ↗
08/23/2026B01123896-I1Request digital key ↗
08/22/2026B01179243-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram4
08/17/2026B01076906-P5Open ↗
08/17/2026B01076906-P6Open ↗
08/13/2026B01076906-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/17/2026B01076906-P6Open ↗
08/17/2026B01076906-P5Open ↗
08/13/2026B01076906-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01076906-I1Open ↗
08/13/2026B01076906-P1Open ↗
▸Seals & Professional Certifications51
▸DOB NOWSpecial Inspector Seal & Signature18
09/23/2026B01076906-S7Open ↗
09/23/2026B01076906-P3Open ↗
09/02/2026B01076906-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/02/2026B01076906-P1Open ↗
09/02/2026B01076906-P1Open ↗
09/02/2026B01076906-S1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/24/2026B01100665-I1Open ↗
08/23/2026B01123896-I1Open ↗
08/17/2026B01076906-P5Open ↗
Showing 3 of 16 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/17/2026B01076906-P5Open ↗
08/17/2026B01076906-P6Open ↗
08/13/2026B01076906-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/24/2026B01100665-I1Open ↗
08/17/2026B01076906-P6Open ↗
08/17/2026B01076906-P5Open ↗
Showing 3 of 14 on file for this type
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01076906-Z5Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B01076906-Z5Open ↗
▸Other Documents15
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/17/2026B01076906-P6Open ↗
08/17/2026B01076906-P5Open ↗
08/17/2026B01076906-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial4
08/17/2026B01076906-P6Open ↗
08/17/2026B01076906-P5Open ↗
08/13/2026B01076906-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/17/2026B01076906-P5Open ↗
08/17/2026B01076906-P6Open ↗
08/13/2026B01076906-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B01076906-Z4Open ↗
▸DOB NOWFinal Survey1
08/17/2026B01076906-I1Open ↗