💬 Discuss this project
1978Year Built
2Stories
A5Building Class
R3-1Zoning
1,224 sfGross Floor Area
1Units
One family attached or semi-detached · 2,500 sf lot · 0.49 FAR built · Flood zone AE
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 210p · 2 filings · 20 docs
Floor 110p · 2 filings · 20 docs
Cellar11p · 2 filings · 20 docs
Site & exterior1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYX Engineering303/08/2024
JX Flame Solution209/21/2023
Enthink Engineers106/28/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYX Engineering403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY Building AssociatesGeneral Contractor203/21/2026
H-BuilderGeneral Contractor107/08/2026
American Standard P&H CororpPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NYX Engineering6118503/08/2024
Building Lifecycle
08/08/2024
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
S00584989-I1-GC
04/11/2024
Special inspection requirement — Masonry
Xiao Huang
04/11/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Xiao Huang
04/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiao Huang
04/11/2024
Special inspection requirement — Fire-Resistance Rated Construction
Xiao Huang
51 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp08/31/2023
DOB NOWGeneral ConstructionPermit IssuedH-Builder08/08/2023
DOB NOWGeneral ConstructionSigned-offNY Building Associates07/13/2021
1 project · most recent 09/13/2023
General Wiring
FiledStatusContractorScope
09/13/2023CompleteEric & NG ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/15/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/29/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/04/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/04/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
04/11/2024MasonryXiao Huangspecial
04/11/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Xiao Huangspecial
04/11/2024Fire-Resistant Penetrations and JointsXiao Huangspecial
04/11/2024Fire-Resistance Rated ConstructionXiao Huangprogress
04/11/2024Fenestration areasXiao Huangenergy_progress
04/11/2024Air barrier - visual inspectionXiao Huangenergy_progress
01/25/2024Fenestration areas—energy_progress
01/25/2024Air barrier - visual inspection—energy_progress
09/22/2023HVAC-R and service water heating system controlsXiao Huangenergy_progress
09/22/2023Fire-Resistant Penetrations and JointsXiao Huangspecial
09/22/2023HVAC-R and service water piping design and insulationXiao Huangenergy_progress
09/22/2023HVAC-R and service water heating equipmentXiao Huangenergy_progress
09/19/2023Fire-Resistant Penetrations and JointsXiao Huangspecial
09/19/2023Fire-Resistance Rated ConstructionXiao Huangprogress
09/19/2023MasonryXiao Huangspecial
09/19/2023Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Xiao Huangspecial
29 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account