Two family frame
332 SWINTON AVENUE
BRONX · BIN 2130393
💬 Discuss this project
2020Year Built
—Stories
B2Building Class
R3AZoning
2,784 sfGross Floor Area
2Units
Two family frame · 3,750 sf lot · 0.74 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Floor 24p · 2 filings · 4 docs
Floor 1New concrete sidewalk and drop curb5p · 3 filings · 20 docs
Cellar18p · 5 filings · 20 docs
Site & exterior1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Royal T&E2507/08/2026
Royal Swinton703/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/20/2022$1.1M—ROYAL SWINTON LLC → Private party— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Leder-Luis Architectural Design307/21/2023
Pirooz Engineering509/15/2021
Royal T&E111/08/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Leder-Luis Architectural Design303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Infiniti Esc PlumbingPlumbing907/08/2026
Tan DevelopmentGeneral Contractor603/21/2026
Goliath DesignGeneral Contractor403/22/2026
Tan Developmentspecialty_contractor203/21/2026
Eureka Electric ContngElectrical203/22/2026
Case PlumbingFire Protection107/08/2026
Go Pro Fire ProtectionFire Protection107/08/2026
SKY ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Pirooz Engineering7177509/15/2021
Triangle Inspection & Tes7495309/15/2021
Building Lifecycle
12/01/2023
Signed off — Alteration
Construction work to add a bathrooom and wet bar in the cellar
X00784700-I1
12/01/2023
Signed off — Alteration
X00784720-I1
11/02/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/13/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/28/2023
Objection resolved — Addressed
65 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing01/04/2023
DOB NOWGeneral ConstructionSigned-offGoliath Design12/13/2022
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing06/24/2021
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing06/24/2021
DOB NOWSprinklersSigned-offGo Pro Fire Protection05/13/2021
DOB NOWCurb CutSigned-offTan Development03/05/2021
DOB NOWMechanical SystemsSigned-offTan Development03/05/2021
DOB NOWSprinklersSigned-offS & L Plumbing01/20/2021
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing07/24/2020
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing07/22/2020
BIS—ISSUEDTan Development02/12/2021
BIS—ISSUEDTan Development02/12/2021
BIS—ISSUEDTan Development03/09/2020
BIS—ISSUEDTan Development03/09/2020
2 projects · most recent 02/04/2023
General Wiring
FiledStatusContractorScope
02/04/2023CompleteEureka Electric ContngGeneral Wiring
06/20/2020CompleteSKY ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
11/02/2023Pass-Final General Construction Non-Directive 14PassView ↗
10/13/2023Fail-Final General Construction Non-Directive 14FailView ↗
07/03/2023Fail-Final General Construction Non-Directive 14FailView ↗
05/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/10/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/26/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/06/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/27/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
10/14/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
10/14/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
10/14/2021HVAC insulation and sealing PIROOZ SOLTANIZADEHenergy_progress
10/14/2021HVAC and service water heating system controls PIROOZ SOLTANIZADEHenergy_progress
10/14/2021HVAC and service water heating equipment PIROOZ SOLTANIZADEHenergy_progress
09/08/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
09/08/2021HVAC and service water heating equipment PIROOZ SOLTANIZADEHenergy_progress
09/08/2021HVAC and service water heating system controls PIROOZ SOLTANIZADEHenergy_progress
09/08/2021HVAC insulation and sealing PIROOZ SOLTANIZADEHenergy_progress
09/08/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
07/01/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
07/01/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
07/01/2021HVAC and service water heating equipment PIROOZ SOLTANIZADEHenergy_progress
07/01/2021HVAC insulation and sealing PIROOZ SOLTANIZADEHenergy_progress
07/01/2021HVAC and service water heating system controls PIROOZ SOLTANIZADEHenergy_progress
101 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account