← Back
Two family frame
332 UNDERHILL AVENUE
BRONX · BIN 2020471
💬 Discuss this project
2024Year Built
2Stories
B2Building Class
R3-2Zoning
1,750 sfGross Floor Area
2Units
0 Open Violations
Two family frame · Owner of record: GABRIEL HOMES LLC · 2,500 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
Structural
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NORTH GATE MANAGEMENT1307/25/2026
VAN NEST CONSTRUCTION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PENNAARCHITECT PC706/19/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VAN NEST CONSTRUCTIONGeneral Contractor707/25/2026
RENEW PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURY TESTING & CONSULT4081306/19/2026
Building Lifecycle
All (73)Filed (7)Permit Issued (6)Signed Off (5)Violation (2)Inspection (12)Objection (12)Special Inspection (29)
07/27/2026
Signed off — Alteration
INSTALL MECHANICAL SISTEM IN CONJUCTION WITH NB JOB # X01007607-I1 AS PER PLAN SUBMITTED.
X01418988-I1
07/23/2026
Permit issued — Mechanical Systems
X01418988-I1-MS
06/19/2026
Filed — Alteration
INSTALL MECHANICAL SISTEM IN CONJUCTION WITH NB JOB # X01007607-I1 AS PER PLAN SUBMITTED.
X01418988-I1
04/30/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/28/2026
Signed off — New Building
SUPPORT OF EXCAVATION FILED IN CONJUNCTION WITH WITH NB JOB # XO1007414
X01007414-S2
04/20/2026
Signed off — New Building
SUPPORT OF EXCAVATION FILED IN CONJUNCTION WITH WITH NB JOB # XO1007414
X01007414-S3
04/14/2026
Signed off — New Building
SUPPORT OF EXCAVATION FILED IN CONJUNCTION WITH WITH NB JOB # XO1007414
X01007414-S1
04/14/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/11/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/10/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/22/2026
Objection raised — C/O of existing property requi
01/22/2026
Objection resolved — Addressed
01/13/2026
Filed — New Building
SUPPORT OF EXCAVATION FILED IN CONJUNCTION WITH WITH NB JOB # XO1007414
X01007414-P1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/31/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/04/2025
Special inspection requirement — Structural Cold-Formed Steel
ALDO BRAVO
10/04/2025
Special inspection requirement — Structural Steel - Details
ALDO BRAVO
10/04/2025
Special inspection requirement — Final
ALDO BRAVO
10/04/2025
Special inspection requirement — Air barrier — testing
ALDO BRAVO
10/04/2025
Special inspection requirement — Interior lighting power
ALDO BRAVO
10/04/2025
Special inspection requirement — Exterior lighting power
ALDO BRAVO
10/04/2025
Special inspection requirement — Lighting controls
ALDO BRAVO
10/04/2025
Special inspection requirement — Protection of exposed foundation insulation
ALDO BRAVO
10/04/2025
Special inspection requirement — Air barrier - visual inspection
ALDO BRAVO
10/04/2025
Special inspection requirement — Lighting in dwelling units
ALDO BRAVO
10/04/2025
Special inspection requirement — Fenestration air leakage
ALDO BRAVO
10/04/2025
Special inspection requirement — Maintenance information
ALDO BRAVO
10/04/2025
Special inspection requirement — Metering
ALDO BRAVO
10/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ALDO BRAVO
10/04/2025
Special inspection requirement — Permanent certificate
ALDO BRAVO
10/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
ALDO BRAVO
10/04/2025
Special inspection requirement — Fenestration areas
ALDO BRAVO
10/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
ALDO BRAVO
10/04/2025
Special inspection requirement — Duct leakage testing, insulation and design
ALDO BRAVO
10/04/2025
Special inspection requirement — Air barrier continuity plan testing
ALDO BRAVO
10/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALDO BRAVO
10/04/2025
Special inspection requirement — Electric vehicle service equipment requirements
ALDO BRAVO
10/04/2025
Special inspection requirement — Insulation placement and R values
ALDO BRAVO
08/18/2025
Permit issued — Curb Cut
X01007414-S3-CC
08/04/2025
Filed — New Building
SUPPORT OF EXCAVATION FILED IN CONJUNCTION WITH WITH NB JOB # XO1007414
X01007414-S3
05/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/09/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/13/2025
Permit issued — Plumbing
X01007414-S2-PL
03/10/2025
Filed — New Building
SUPPORT OF EXCAVATION FILED IN CONJUNCTION WITH WITH NB JOB # XO1007414
X01007414-S2
03/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Gregory Mortman
03/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Mortman
03/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Gregory Mortman
03/10/2025
Special inspection requirement — Maintenance information
Gregory Mortman
03/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Mortman
02/13/2025
Signed off — New Building
SUPPORT OF EXCAVATION FILED IN CONJUNCTION WITH WITH NB JOB # XO1007414
X01007414-S5
01/17/2025
Violation issued (ECB, closed)
Unknown
11/07/2024
Permit issued — Earth Work
X01007414-S5-EA
11/04/2024
Filed — New Building
SUPPORT OF EXCAVATION FILED IN CONJUNCTION WITH WITH NB JOB # XO1007414
X01007414-S5
11/04/2024
Special inspection requirement — Final
GIULIANO PENNA
10/15/2024
Permit issued — Structural
X01007414-I1-GC-CX
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offVAN NEST CONSTRUCTION07/23/2026
DOB NOWCurb CutSigned-offVAN NEST CONSTRUCTION08/18/2025
DOB NOWPlumbingSigned-offRENEW PLUMBING CORP03/13/2025
DOB NOWEarth WorkSigned-offVAN NEST CONSTRUCTION11/07/2024
DOB NOWStructuralPermit IssuedVAN NEST CONSTRUCTION10/15/2024
DOB NOWConstruction FenceSigned-offVAN NEST CONSTRUCTION10/04/2024
1 project · most recent 06/19/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/19/2026Signed-offVAN NEST CONSTRUCTIONHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Amana WBB3151410 10,900 BTU ×9
Ventilation
Panasonic FV-0511VFL1 50 CFM · Exhaust Fan ×5
Broan 0 150 kW ×2
Fantech REC6 160 CFM · Exhaust Fan ×2
1 project · most recent 02/13/2025
General Wiring
FiledStatusContractorScope
02/13/2025CompleteJOHN H. MOOREGeneral Wiring
1 project · most recent 01/13/2026
Steel Concrete
FiledStatusContractorScope
01/13/2026Signed-offVAN NEST CONSTRUCTIONSteel, Concrete
1 project · most recent 01/13/2026
Fence
FiledStatusContractorScope
01/13/2026Signed-offVAN NEST CONSTRUCTIONFence
1 project · most recent 01/13/2026
Earthwork
FiledStatusContractorScope
01/13/2026Signed-offVAN NEST CONSTRUCTIONEarthwork
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
04/30/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/14/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
03/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/11/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/10/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/31/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/31/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/15/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/09/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
10/04/2025Structural Cold-Formed SteelALDO BRAVOspecial
10/04/2025Structural Steel - DetailsALDO BRAVOspecial
10/04/2025FinalALDO BRAVOprogress
10/04/2025Air barrier — testing ALDO BRAVOenergy_progress
10/04/2025Interior lighting powerALDO BRAVOenergy_progress
10/04/2025Exterior lighting powerALDO BRAVOenergy_progress
10/04/2025Lighting controlsALDO BRAVOenergy_progress
10/04/2025Protection of exposed foundation insulationALDO BRAVOenergy_progress
10/04/2025Air barrier - visual inspectionALDO BRAVOenergy_progress
10/04/2025Lighting in dwelling unitsALDO BRAVOenergy_progress
10/04/2025Fenestration air leakageALDO BRAVOenergy_progress
10/04/2025Maintenance informationALDO BRAVOenergy_progress
10/04/2025MeteringALDO BRAVOenergy_progress
10/04/2025Fenestration and door U-factor and product ratingsALDO BRAVOenergy_progress
10/04/2025Permanent certificateALDO BRAVOenergy_progress
10/04/2025HVAC-R and service water heating equipmentALDO BRAVOenergy_progress
10/04/2025Fenestration areasALDO BRAVOenergy_progress
10/04/2025HVAC-R and service water heating system controlsALDO BRAVOenergy_progress
10/04/2025Duct leakage testing, insulation and designALDO BRAVOenergy_progress
10/04/2025Air barrier continuity plan testingALDO BRAVOenergy_progress
10/04/2025HVAC-R and service water piping design and insulationALDO BRAVOenergy_progress
10/04/2025Electric vehicle service equipment requirementsALDO BRAVOenergy_progress
10/04/2025Insulation placement and R valuesALDO BRAVOenergy_progress
03/10/2025Energy Code Compliance InspectionsGregory Mortmanprogress
03/10/2025HVAC-R and service water heating system controlsGregory Mortmanenergy_progress
Latest 25 of 29.
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/18/2026X01007414-S1Request digital key ↗
08/18/2026X01007414-S5Request digital key ↗
08/18/2026X01007414-S3Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026X01007414-I1Open ↗
08/15/2026X01007414-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/15/2026X01007414-I1Open ↗
08/15/2026X01007414-P1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
06/09/2025240362273Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026X01007414-I1Open ↗
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature24
08/27/2026X01007414-P1Open ↗
08/27/2026X01007414-P1Open ↗
08/27/2026X01007414-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/18/2026X01007414-P1Open ↗
08/18/2026X01007414-S5Open ↗
08/18/2026X01007414-S3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026X01007414-P1Open ↗
08/27/2026X01007414-P1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
05/07/2025240362273Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/15/2026X01007414-I1Open ↗
08/15/2026X01007414-P1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist2
08/15/2026X01007414-I1Open ↗
08/15/2026X01007414-P1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/08/2025240362273Open ↗
▸DOB NOWStreet Trees Site Plan1
08/15/2026X01007414-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026X01007414-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/15/2026X01007414-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/18/2026X01007414-S5Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
05/07/2025240362273Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/11/2025240362273Open ↗
▸Other Documents10
▸BISBPP - SUPPORTING DOCUMENTATION2
07/11/2025240362273Open ↗
07/11/2025240362273Open ↗
▸DOB NOWSite Survey: Initial2
08/15/2026X01007414-I1Open ↗
08/15/2026X01007414-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/15/2026X01007414-I1Open ↗
08/15/2026X01007414-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/15/2026X01007414-I1Open ↗
08/15/2026X01007414-P1Open ↗
▸DOB NOWFinal Survey1
08/15/2026X01007414-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/18/2026X01007414-S5Open ↗