RoofUnder Construction136p · 6 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Structural · Supported Scaffold
TEMPORARY ENGINEERED ENCLOSURE SYSTEM FOR ADJOINING PROPERTY PROTECTION
On file for this project
21 documents · 2 drawing sheets
Partial demolition of interior building structure including removal of interior slabs, joists, flooring, and facade walls as per plans. Roof demolition to be performed under separate application once asbestos abatement ACP-7 is complete.
On file for this project
16 documents · 1 drawing sheet
Subsequent filing for modification/upgrade to existing foundation.
On file for this project
22 documents
Latest 3 of 6 filings on this floor.
PenthouseUnder Construction75p · 3 filings · 20 docs
MechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Structural
Subsequent filing for modification/upgrade to existing foundation.
On file for this project
22 documents
Application filed herewith for new installation of HVAC system. No change in use, egress or occupancy. Filed in conjunction with Alt CO applic. #M00682724.
On file for this project
14 documents
Application filed herewith for the new installation of a new sanitary and storm system. No change in use, egress or occupancy. Filed in conjunction with Alt CO applic. #M00682724.
On file for this project
15 documents
Floor 6Under Construction1p · 1 filing · 2 docs
Mechanical
Protection & Mechanical Methods application for installation of elevator hoist in conjunction w/ JOB#: M01384654-I1-VT
On file for this project
2 documents · 1 drawing sheet
Floor 5Under Construction213p · 7 filings · 20 docs
ArchitectureDMElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Structural · Supported Scaffold
Temporary installation and use of a debris chute associated with construction operations for the controlled removal of non-hazardous debris. Filed to correct Violation No. 039547422M
On file for this project
31 documents · 1 drawing sheet
TEMPORARY ENGINEERED ENCLOSURE SYSTEM FOR ADJOINING PROPERTY PROTECTION
On file for this project
21 documents
Protection & Mechanical Methods application for installation of elevator hoist in conjunction w/ JOB#: M01384654-I1-VT
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 4Under Construction190p · 7 filings · 20 docs
ArchitectureDMElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Structural · Supported Scaffold
Temporary installation and use of a debris chute associated with construction operations for the controlled removal of non-hazardous debris. Filed to correct Violation No. 039547422M
On file for this project
31 documents · 2 drawing sheets
TEMPORARY ENGINEERED ENCLOSURE SYSTEM FOR ADJOINING PROPERTY PROTECTION
On file for this project
21 documents
Protection & Mechanical Methods application for installation of elevator hoist in conjunction w/ JOB#: M01384654-I1-VT
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 3Under Construction215p · 7 filings · 20 docs
ArchitectureDMElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Structural · Supported Scaffold
Temporary installation and use of a debris chute associated with construction operations for the controlled removal of non-hazardous debris. Filed to correct Violation No. 039547422M
On file for this project
31 documents · 3 drawing sheets
TEMPORARY ENGINEERED ENCLOSURE SYSTEM FOR ADJOINING PROPERTY PROTECTION
On file for this project
21 documents
Protection & Mechanical Methods application for installation of elevator hoist in conjunction w/ JOB#: M01384654-I1-VT
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 2Under Construction214p · 7 filings · 20 docs
ArchitectureDMElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Structural · Supported Scaffold
Temporary installation and use of a debris chute associated with construction operations for the controlled removal of non-hazardous debris. Filed to correct Violation No. 039547422M
On file for this project
31 documents · 2 drawing sheets
TEMPORARY ENGINEERED ENCLOSURE SYSTEM FOR ADJOINING PROPERTY PROTECTION
On file for this project
21 documents
Protection & Mechanical Methods application for installation of elevator hoist in conjunction w/ JOB#: M01384654-I1-VT
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 1Under Construction219p · 8 filings · 20 docs
ArchitectureDMElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Structural · Supported Scaffold
Temporary installation and use of a debris chute associated with construction operations for the controlled removal of non-hazardous debris. Filed to correct Violation No. 039547422M
On file for this project
31 documents · 2 drawing sheets
PROPOSED NEW AUTOMATED PARKING SYSTEM IN EXISTING GARAGE
On file for this project
5 documents · 1 drawing sheet
TEMPORARY ENGINEERED ENCLOSURE SYSTEM FOR ADJOINING PROPERTY PROTECTION
On file for this project
21 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
CellarUnder Construction188p · 7 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Structural · Support of Excavation
Temporary installation and use of a debris chute associated with construction operations for the controlled removal of non-hazardous debris. Filed to correct Violation No. 039547422M
On file for this project
31 documents · 3 drawing sheets
PROPOSED NEW AUTOMATED PARKING SYSTEM IN EXISTING GARAGE
On file for this project
5 documents · 9 drawing sheets
Protection & Mechanical Methods application for installation of elevator hoist in conjunction w/ JOB#: M01384654-I1-VT
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Site & exteriorUnder Construction24p · 3 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
TEMPORARY ENGINEERED ENCLOSURE SYSTEM FOR ADJOINING PROPERTY PROTECTION
On file for this project
21 documents · 12 drawing sheets
Protection & Mechanical Methods application for installation of elevator hoist in conjunction w/ JOB#: M01384654-I1-VT
On file for this project
2 documents · 12 drawing sheets
Installation of temporary scaffold system stair tower for workers access during construction operations of Alteration CO filed under DOB Now # M00682724. No change in use or occupancy filed with this application.
On file for this project
3 documents · 3 drawing sheets
Filed — no permit issued38p · 3 filings · 16 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructuralOther
Application filed herewith for the installation of a new combined sprinkler/standpipe system. No change in use, egress or occupancy. Filed in conjunction M00682724.
On file for this project
9 documents · 12 drawing sheets
No filed description on record for this project.
On file for this project
2 documents · 12 drawing sheets
Application filed herewith for the new installation of a temporary dry standpipe system w/ pressurized alarm system. No change in use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet