9 Active Violations 3 unresolved · 6 paperwork only ▸
Residential, converted (3 apartments per DOB filing) · Owner of record: 332 W 11 Holding · 5,121 sf lot · 4.85 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofAgv ParkingUnder Construction126p · 10 filings · 20 docs
PenthouseAgv ParkingUnder Construction77p · 6 filings · 20 docs
Floor 6332 W 11 Holding LLCUnder Construction1p · 3 filings · 16 docs
Floor 5Agv ParkingUnder Construction208p · 10 filings · 20 docs
Floor 4Agv ParkingUnder Construction181p · 10 filings · 20 docs
Floor 3Agv ParkingUnder Construction211p · 10 filings · 20 docs
Floor 2Agv ParkingUnder Construction209p · 10 filings · 20 docs
Floor 1Agv ParkingUnder Construction216p · 11 filings · 20 docs
CellarAgv ParkingUnder Construction177p · 9 filings · 20 docs
Site & exterior332 W 11 Holding LLCUnder Construction24p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
332 W 11 Holding6810/10/2026
Parkplus108/21/2026
Suzuki Associates103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/21/2020$26.0M—— → —$1,047/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Weddle & Gilmore Architects410/09/2026
Paul G. Jones, P.E1008/20/2026
Sotir Associates106/26/2026
None105/05/2026
LMW Engineering Group301/13/2026
Gea Consulting Engineers911/10/2025
WSP305/06/2025
McLaren Engineering Group204/08/2025
KZ Engineering101/30/2025
Ancora Engineering104/22/2024
Syed Engineering209/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Michael Zenreich Architect3003/21/2026
Perciballi Industries403/21/2026
Synergy Building Consultants103/21/2026
Consolidated Scaffold Bridge603/21/2026
M G McLaren Engineering403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Consolidated ScaffoldingScaffold2810/20/2026
Titanium Construction ServicesGeneral Contractor1810/09/2026
Consolidated Scaffoldingspecialty_contractor303/21/2026
Mack ElectricalElectrical303/22/2026
Titanium Construction ServicesScaffold207/08/2026
Mack ElectricalElectrical203/21/2026
Perciballi IndustriesGeneral Contractor207/08/2026
Plumbing NYCPlumbing106/28/2026
Paccione ChristopherElectrical103/21/2026
Park PlusGeneral Contractor108/21/2026
Perciballi IndustriesScaffold107/08/2026
Jam ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Domani Inspection Service8431710/09/2026
Engineering Consulting SE2050106/26/2026
Building Lifecycle
All (196)Filed (36)Permit Issued (37)Violation (57)Inspection (2)Objection (34)Special Inspection (30)
10/19/2026
Permit issued — Construction Fence
M00774733-S1-FN
10/09/2026
Filed — Alteration CO
Application filed herewith for the conversion of an existing public parking garage to residential use. See comments of the PW1 for continuation of job description.
M00682724-P3
10/08/2026
Permit issued — Mechanical Systems
M00820557-I1-MS
10/08/2026
Permit issued — Structural
M00820597-I1-ST
10/08/2026
Permit issued — Support of Excavation
M00820597-S2-SE
09/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
09/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
09/11/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
09/11/2026
Special inspection requirement — Interior lighting power
JOHN MCMONAGLE
09/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN MCMONAGLE
09/11/2026
Special inspection requirement — Lighting in dwelling units
JOHN MCMONAGLE
09/03/2026
Permit issued — General Construction
M00682724-I1-GC
08/20/2026
Filed — Alteration
INSTALLATION OF A MEDIUM DUTY PIPE SCAFFOLD AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PIPE SCAFFOLD SHALL COMPLY WITH 2022 NYC BUILDING CODE,CHAPTER 33.
M00774733-P6
08/20/2026
Permit issued — General Construction
M01407165-I1-GC
08/03/2026
Permit issued — Sidewalk Shed
M00774733-I1-SH
08/03/2026
Objection resolved — Resolved
08/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
08/03/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
PAUL MARINO
07/30/2026
Objection resolved — Resolved
07/28/2026
Objection raised — Inspections
07/28/2026
Objection raised — Scope
07/15/2026
Violation issued (ECB, closed)
Unknown
07/14/2026
Violation issued (ECB, open)
Construction
06/26/2026
Filed — Alteration
PROPOSED NEW AUTOMATED PARKING SYSTEM IN EXISTING GARAGE
M01407165-I1
06/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
PAUL MARINO
06/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
06/24/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
06/24/2026
Special inspection requirement — Interior lighting power
JOHN MCMONAGLE
06/24/2026
Special inspection requirement — Lighting in dwelling units
JOHN MCMONAGLE
06/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN MCMONAGLE
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
06/08/2026
Filed — Alteration CO
Application filed herewith for the conversion of an existing public parking garage to residential use. See comments of the PW1 for continuation of job description.
M00682724-P2
06/01/2026
Permit issued — Protection and Mechanical Methods
M01384670-I1-PMM
05/29/2026
Violation issued (ECB, open)
Construction
05/27/2026
Permit issued — Structural
M01148348-I1-ST
05/21/2026
Permit issued — Supported Scaffold
M01114386-I1-SF
05/19/2026
Permit issued — Protection and Mechanical Methods
M00682724-S3-PMM
05/19/2026
Permit issued — Protection and Mechanical Methods
M00774733-S3-PMM
05/19/2026
Permit issued — Protection and Mechanical Methods
M00774733-S4-PMM
05/19/2026
Permit issued — Supported Scaffold
M00774733-S2-SF
05/19/2026
Permit issued — Sidewalk Shed
M00774733-I1-SH
05/12/2026
Violation issued (ECB, closed)
Construction
05/07/2026
Filed — Alteration
INSTALLATION OF A MEDIUM DUTY PIPE SCAFFOLD AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PIPE SCAFFOLD SHALL COMPLY WITH 2022 NYC BUILDING CODE,CHAPTER 33.
M00774733-P5
05/07/2026
Filed — Alteration
INSTALLATION OF A MEDIUM DUTY PIPE SCAFFOLD AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PIPE SCAFFOLD SHALL COMPLY WITH 2022 NYC BUILDING CODE,CHAPTER 33.
M00774733-P4
05/05/2026
Filed — Alteration
Protection & Mechanical Methods application for installation of elevator hoist in conjunction w/ JOB#: M01384654-I1-VT
M01384670-I1
04/02/2026
Violation issued (ECB, closed)
Construction
03/12/2026
Objection resolved — Addressed
02/10/2026
Objection raised — Other
01/13/2026
Filed — Alteration CO
Application filed herewith for the conversion of an existing public parking garage to residential use. See comments of the PW1 for continuation of job description.
M00682724-S3
01/07/2026
Violation issued (ECB, closed)
Unknown
12/23/2025
Violation issued (ECB, closed)
Construction
12/09/2025
Violation issued (ECB, closed)
Construction
11/28/2025
Violation issued (ECB, closed)
Unknown
11/28/2025
Violation issued (ECB, closed)
Construction
11/28/2025
Violation issued (ECB, closed)
Unknown
11/21/2025
Filed — Alteration
INSTALLATION OF A MEDIUM DUTY PIPE SCAFFOLD AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PIPE SCAFFOLD SHALL COMPLY WITH 2022 NYC BUILDING CODE,CHAPTER 33.
M00774733-P2
11/21/2025
Permit issued — Foundation
M00820597-S1-FO
11/12/2025
Filed — Alteration
INSTALLATION OF A MEDIUM DUTY PIPE SCAFFOLD AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PIPE SCAFFOLD SHALL COMPLY WITH 2022 NYC BUILDING CODE,CHAPTER 33.
M00774733-P1
11/10/2025
Filed — Alteration
Application filed herewith for the new installation of a new sanitary and storm system. No change in use, egress or occupancy. Filed in conjunction with Alt CO applic. #M00682724.
M00820568-P2
11/10/2025
Filed — Alteration
Application filed herewith for the installation of a new combined sprinkler/standpipe system. No change in use, egress or occupancy. Filed in conjunction M00682724.
M00820586-P2
Latest 60 of 196 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedConsolidated Scaffolding10/19/2026
DOB NOWMechanical SystemsPermit IssuedTitanium Construction Services10/08/2026
DOB NOWStructuralPermit IssuedTitanium Construction Services10/08/2026
DOB NOWSupport of ExcavationPermit IssuedTitanium Construction Services10/08/2026
DOB NOWGeneral ConstructionPermit IssuedTitanium Construction Services09/03/2026
DOB NOWGeneral ConstructionPermit IssuedPark Plus08/20/2026
DOB NOWSidewalk ShedPermit IssuedConsolidated Scaffolding08/03/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedConsolidated Scaffolding06/01/2026
DOB NOWStructuralPermit IssuedPerciballi Industries05/27/2026
DOB NOWSupported ScaffoldPermit IssuedTitanium Construction Services05/21/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPerciballi Industries05/19/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedConsolidated Scaffolding05/19/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedConsolidated Scaffolding05/19/2026
DOB NOWSupported ScaffoldPermit IssuedConsolidated Scaffolding05/19/2026
DOB NOWSidewalk ShedPermit IssuedConsolidated Scaffolding05/19/2026
DOB NOWFoundationPermit IssuedTitanium Construction Services11/21/2025
DOB NOWConstruction FencePermit IssuedConsolidated Scaffolding10/31/2025
DOB NOWMechanical SystemsPermit IssuedTitanium Construction Services10/17/2025
DOB NOWStructuralPermit IssuedTitanium Construction Services10/17/2025
DOB NOWSupport of ExcavationPermit IssuedTitanium Construction Services10/17/2025
DOB NOWGeneral ConstructionPermit IssuedTitanium Construction Services09/15/2025
DOB NOWPlumbingPermit IssuedPlumbing Works NYC06/24/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedConsolidated Scaffolding05/16/2025
DOB NOWStructuralPermit IssuedPerciballi Industries04/24/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedConsolidated Scaffolding04/11/2025
DOB NOWSupported ScaffoldPermit IssuedConsolidated Scaffolding03/27/2025
DOB NOWSupported ScaffoldPermit IssuedTitanium Construction Services02/28/2025
DOB NOWConstruction FencePermit IssuedConsolidated Scaffolding11/22/2024
DOB NOWFoundationPermit IssuedTitanium Construction Services11/21/2024
DOB NOWSupport of ExcavationPermit IssuedTitanium Construction Services11/21/2024
DOB NOWMechanical SystemsPermit IssuedTitanium Construction Services11/04/2024
DOB NOWGeneral ConstructionPermit IssuedTitanium Construction Services10/17/2024
DOB NOWStructuralPermit IssuedTitanium Construction Services10/09/2024
DOB NOWSidewalk ShedPermit IssuedConsolidated Scaffolding04/17/2024
DOB NOWSupported ScaffoldPermit IssuedConsolidated Scaffolding09/07/2022
DOB NOWSidewalk ShedPermit IssuedConsolidated Scaffolding07/15/2022
DOB NOWSupported ScaffoldPermit IssuedConsolidated Scaffolding09/08/2021
1 project · most recent 10/15/2024
Heating and Air Conditioning Systems
FiledStatusContractorScope
10/15/2024Permit IssuedTitanium Construction ServicesHeating and Air Conditioning Systems
2 projects · most recent 11/10/2025
FiledStatusContractorScope
11/10/2025——344 heads
02/08/2024——2 outlets
1 project · most recent 11/10/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/10/2025Permit IssuedPlumbing Works SurbGas, Storm, Water/Sanitary
7 projects · most recent 04/21/2026
General Wiring
FiledStatusContractorScope
04/21/2026Permit IssuedSolas Electrical—
01/11/2026Permit IssuedJam Electrical—
12/20/2025Permit IssuedMack ElectricalGeneral Wiring
12/20/2025Permit IssuedMack ElectricalGeneral Wiring
12/04/2024Permit IssuedMack Electrical1 meters, 1 new_meters
12/04/2024Permit IssuedMack Electrical—
07/13/2022Permit IssuedSolas Electrical—
2 projects · most recent 05/06/2025
Concrete Steel Masonry
FiledStatusContractorScope
05/06/2025Permit IssuedTitanium Construction ServicesSteel, Concrete, Masonry
04/08/2025Permit IssuedPerciballi IndustriesConcrete
3 projects · most recent 08/20/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/20/2026Permit IssuedConsolidated ScaffoldingScaffold, Sidewalk Shed
01/30/2025Permit IssuedTitanium Construction ServicesScaffold
09/14/2021Permit IssuedConsolidated ScaffoldingScaffold
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/11/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/11/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 85
DateRequirementInspectorRole
09/11/2026Lighting in dwelling unitsJOHN MCMONAGLEenergy_progress
09/11/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
09/11/2026Structural Stability – Alterations of existing buildingsJOHN MCMONAGLEspecial
09/11/2026Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
09/11/2026Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
09/11/2026Interior lighting powerJOHN MCMONAGLEenergy_progress
08/03/2026Alternative Materials - OTCR Buildings Bulletin NumberPAUL MARINOspecial
08/03/2026Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
06/26/2026Tenant Protection Plan CompliancePAUL MARINOspecial
06/24/2026Lighting in dwelling unitsJOHN MCMONAGLEenergy_progress
06/24/2026Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
06/24/2026Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
06/24/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
06/24/2026Structural Stability – Alterations of existing buildingsJOHN MCMONAGLEspecial
06/24/2026Interior lighting powerJOHN MCMONAGLEenergy_progress
10/27/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
10/27/2025Sprinkler SystemsJOHN MCMONAGLEspecial
06/03/2025Structural Stability – Alterations of existing buildingsJOHN MCMONAGLEspecial
06/03/2025Subsurface Conditions – Fill Placement & In-Place DensityJOHN MCMONAGLEspecial
06/03/2025Subgrade InspectionsJOHN MCMONAGLEspecial
06/03/2025FinalJOHN MCMONAGLEprogress
06/03/2025Footing and FoundationJOHN MCMONAGLEprogress
04/15/2025Structural Steel - WeldingJOHN MCMONAGLEspecial
04/15/2025Structural Steel - DetailsJOHN MCMONAGLEspecial
04/15/2025Structural Stability – Alterations of existing buildingsJOHN MCMONAGLEspecial
Latest 25 of 85.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Agv ParkingParkingCellar, Floors 1–5, Penthouse, Roof
Project M01407165 Alteration · Permit Entire · 06/26/2026
Project M00820568 Alteration · Permit Entire · 09/07/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 173 on file (BIS + DOB NOW)
▸Plans & Drawings36
▸DOB NOWPlans/Sketch36
09/03/2026M00565902-I1Request digital key ↗
09/03/2026M00565902-P1Request digital key ↗
08/28/2026M00971707-I1Request digital key ↗
Showing 3 of 36 on file for this type
▸Applications & Permits19
▸DOB NOWLPC Approval/Permit17
10/11/2026M00682724-P3Open ↗
08/25/2026M01148348-I1Open ↗
08/23/2026M00820597-S1Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
08/16/2017123300748Open ↗
09/25/2014122139836Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
10/11/2026M00682724-P3Open ↗
08/16/2026M00682724-P2Open ↗
08/13/2026M00682724-I1Open ↗
▸Seals & Professional Certifications71
▸DOB NOWDPL-1: Design Professional Seal & Signature38
10/11/2026M00682724-P3Open ↗
09/03/2026M00565902-P1Open ↗
09/03/2026M00565902-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
10/11/2026M00682724-P3Open ↗
09/01/2026M00682724-P1Open ↗
09/01/2026M00971707-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
10/11/2026M00682724-P3Open ↗
10/11/2026M00682724-P3Open ↗
09/01/2026M00682724-P1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
08/16/2017123300748Open ↗
09/25/2014122139836Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026M00682724-I1—
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist4
10/11/2026M00682724-P3Open ↗
08/16/2026M00682724-P2Open ↗
08/13/2026M00682724-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M00682724-I1Open ↗
▸Environmental & Asbestos22
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
10/11/2026M00682724-P3Open ↗
08/28/2026M00971707-I1Open ↗
08/26/2026M00820557-P1Open ↗
Showing 3 of 19 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
08/16/2017123300748Open ↗
09/25/2014122139836Open ↗
09/25/2014122139836Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/16/2017123300748Open ↗
09/25/2014122139836Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/16/2017123300748Open ↗
09/25/2014122139836Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
08/16/2017123300748Open ↗
09/25/2014122139836Open ↗
▸Other Documents10
▸DOB NOWProperty Ownership Certification4
10/11/2026M00682724-P3Open ↗
08/16/2026M00682724-P1Open ↗
08/16/2026M00682724-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProof of Historic Building3
08/21/2026M00820568-P1Open ↗
08/21/2026M00820568-I1Open ↗
08/13/2026M00820568-P2Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026M00682724-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M01148348-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026M00820597-S2Open ↗