← Back
Elevator apt, fireproof without stores
3321 GLENWOOD ROAD
BROOKLYN · East Flatbush-Farragut · BIN 3429240
💬 Discuss this project
0Year Built
8Stories
D3Building Class
R6Zoning
22,000 sfGross Floor Area
27Units
Rent Stabilized6 Open Violations ▸FDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: 3321 GLENWOOD LLC · 4,400 sf lot · 5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Roof29p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 4 docs
Floor 728p · 2 filings · 20 docs
Floor 628p · 2 filings · 20 docs
Floor 526p · 1 filing · 20 docs
Floor 426p · 1 filing · 20 docs
Floor 326p · 1 filing · 20 docs
Floor 227p · 2 filings · 20 docs
Floor 128p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CANDOR CAPITAL ONE3707/08/2026
CANDOR CAPITAL1007/08/2026
OWNERS REP807/08/2026
3321 GLENWOOD LLC503/22/2026
TARGET CONSTRUCTION303/22/2026
543 ALBANY HOLDINGS LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/16/2019$750K—Private party → 3321 GLENWOOD LLC$34/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LESTER KATZ, NCARB411/04/2022
P GEORGOPOULOS ARCHITECT PC910/24/2022
PAUL PERDEK, PROF. ENG. PLLC406/07/2022
SOUTH BAY ENGINEERING PLLC110/19/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITING 4 U1303/21/2026
AE DESIGN SOLUTION803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TARGET CONSTRUCTION LLCGeneral Contractor1707/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor707/08/2026
TFK ELECTRIC CORP 004849General Contractor403/22/2026
ENDRE BANYAElectrical403/21/2026
BEST MECHANICAL SVCS INCPlumbing107/08/2026
TFK ELECTRIC CORPElectrical103/22/2026
RIGHTWAY PLBG AND HTG INCFire Protection107/08/2026
D & F CONSTRUCTION GROUPGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616811/04/2022
Building Lifecycle
All (139)Filed (18)Permit Issued (13)Signed Off (11)Violation (8)Inspection (11)Objection (48)Special Inspection (30)
04/17/2026
Violation issued (ECB, open)
Elevators
04/16/2026
Violation issued (HPD, closed)
A
04/30/2025
Violation issued (HPD, closed)
A
04/30/2025
Violation issued (HPD, closed)
A
04/30/2025
Violation issued (HPD, closed)
B
05/09/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/04/2022
Filed — New Building
B00490655-P2
11/03/2022
Signed off — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB JOB #B00490655.
B00643943-I1
11/02/2022
Signed off — Alteration
Mechanical application filed in conjunction with NB job #B00490655.
B00642562-I1
11/01/2022
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
11/01/2022
Special inspection requirement — Maintenance information
FAHAD FATEH
11/01/2022
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
11/01/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
11/01/2022
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
10/26/2022
Signed off — Alteration
SPRINKLER APPLICATION FILED IN CONJUNCTION WITH NB JOB #B00490655.
B00643950-I1
10/24/2022
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB JOB #B00490655.
B00643943-P2
10/24/2022
Special inspection requirement — Maintenance information
FAHAD FATEH
10/24/2022
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
10/24/2022
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
10/24/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
10/24/2022
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
10/20/2022
Signed off — Alteration
Curb Cut application filed in conjunction with NB #B00490655
B00643835-I1
10/20/2022
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
10/20/2022
Special inspection requirement — Exterior lighting power
FAHAD FATEH
10/20/2022
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
10/20/2022
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
10/20/2022
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
10/20/2022
Special inspection requirement — Metering
FAHAD FATEH
10/20/2022
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
10/20/2022
Special inspection requirement — Maintenance information
FAHAD FATEH
10/20/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
10/20/2022
Special inspection requirement — Interior lighting power
FAHAD FATEH
10/20/2022
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
10/20/2022
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
FAHAD FATEH
10/20/2022
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
10/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
10/20/2022
Special inspection requirement — Sprayed fire-resistant materials
FAHAD FATEH
10/20/2022
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
10/20/2022
Special inspection requirement — Air barrier — testing
FAHAD FATEH
10/20/2022
Special inspection requirement — Lighting controls
FAHAD FATEH
10/20/2022
Special inspection requirement — Fenestration areas
FAHAD FATEH
10/20/2022
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
10/19/2022
Permit issued — Mechanical Systems
B00642562-I1-MS
10/19/2022
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
10/19/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/14/2022
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
10/14/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/29/2022
Filed — Alteration
Curb Cut application filed in conjunction with NB #B00490655
B00643835-P1
09/23/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/20/2022
Signed off — Alteration
B00706885-I1
09/20/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00706877-I1
09/20/2022
Filed — Alteration
SPRINKLER APPLICATION FILED IN CONJUNCTION WITH NB JOB #B00490655.
B00643950-P1
09/20/2022
Signed off — Alteration
B00706878-I1
09/15/2022
Signed off — Alteration
B00404037-I1
09/14/2022
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
09/13/2022
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB JOB #B00490655.
B00643943-P1
09/02/2022
Permit issued — Curb Cut
B00643835-I1-CC
08/29/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/23/2022
Signed off — Alteration
Structural application filed in conjunction with NB application #B00490655.
B00643955-I1
06/17/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 139 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offTARGET CONSTRUCTION LLC10/19/2022
DOB NOWCurb CutSigned-offTARGET CONSTRUCTION LLC09/02/2022
DOB NOWGeneral ConstructionPermit IssuedTARGET CONSTRUCTION LLC05/13/2022
DOB NOWStructuralSigned-offTARGET CONSTRUCTION LLC03/31/2022
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC03/29/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC03/29/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC03/29/2022
DOB NOWPlumbingSigned-offBEST MECHANICAL SVCS INC03/25/2022
DOB NOWSprinklersSigned-offRIGHTWAY PLBG AND HTG INC03/25/2022
DOB NOWFoundationSigned-offTARGET CONSTRUCTION LLC03/13/2022
DOB NOWSupport of ExcavationSigned-offTARGET CONSTRUCTION LLC03/09/2022
DOB NOWConstruction FenceSigned-offTARGET CONSTRUCTION LLC10/19/2021
DOB NOWConstruction FenceSigned-offTARGET CONSTRUCTION LLC10/27/2020
5 projects · most recent 12/02/2022
General Wiring
FiledStatusContractorScope
12/02/2022CompleteTFK ELECTRIC CORP28 meters, 28 new_meters
11/16/2022CompleteSTAR ELEC'L CONTRACTORS C—
05/29/2022CompleteTFK ELECTRIC CORPGeneral Wiring
05/02/2022CompleteTFK ELECTRIC CORP—
03/27/2022CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
05/09/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/19/2022Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
10/19/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
10/14/2022Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
10/14/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/23/2022Pass-Final CND-Occupancy InspectionPassView ↗
09/14/2022Fail-Final Curb Cut Non-Directive 14FailView ↗
08/29/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/17/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/07/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/07/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
11/01/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
11/01/2022Maintenance informationFAHAD FATEHenergy_progress
11/01/2022HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
11/01/2022HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
11/01/2022HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
10/24/2022Maintenance informationFAHAD FATEHenergy_progress
10/24/2022HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
10/24/2022HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
10/24/2022HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
10/24/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
10/20/2022Electrical motors and elevatorsFAHAD FATEHenergy_progress
10/20/2022Exterior lighting powerFAHAD FATEHenergy_progress
10/20/2022Lighting in dwelling unitsFAHAD FATEHenergy_progress
10/20/2022Insulation placement and R valuesFAHAD FATEHenergy_progress
10/20/2022Fenestration air leakageFAHAD FATEHenergy_progress
10/20/2022MeteringFAHAD FATEHenergy_progress
10/20/2022Protection of exposed foundation insulationFAHAD FATEHenergy_progress
10/20/2022Maintenance informationFAHAD FATEHenergy_progress
10/20/2022Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
10/20/2022Interior lighting powerFAHAD FATEHenergy_progress
10/20/2022Fire-Resistance Rated ConstructionFAHAD FATEHprogress
10/20/2022Alternative Materials - OTCR Buildings Bulletin NumberFAHAD FATEHspecial
10/20/2022Concrete - Cast-In-PlaceFAHAD FATEHspecial
10/20/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
10/20/2022Sprayed fire-resistant materialsFAHAD FATEHspecial
Latest 25 of 43.
▾Documents — 102 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch17
08/31/2026B00643835-P1Request digital key ↗
08/31/2026B00643835-I1Request digital key ↗
08/31/2026B00643943-P1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00404037-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
12/29/2021340830122Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
08/16/2022340830122Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00490655-I1Open ↗
08/13/2026B00490655-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00490655-I1Open ↗
08/13/2026B00490655-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00490655-I1Open ↗
▸Seals & Professional Certifications40
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/31/2026B00643835-I1Open ↗
08/31/2026B00643835-P1Open ↗
08/31/2026B00643943-P2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/02/2026B00490655-P2Open ↗
09/02/2026B00490655-P2Open ↗
09/02/2026B00642562-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B00490655-P2Open ↗
09/02/2026B00490655-P2Open ↗
09/02/2026B00642562-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/29/2021340830122Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/29/2021340830122Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B00490655-P2Open ↗
08/13/2026B00490655-I1Open ↗
▸DOB NOWFDNY: Letter of No Objection2
08/13/2026B00643950-I1Open ↗
08/13/2026B00643950-P1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/28/2026B00490655-I1—
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist2
08/28/2026B00490655-P2Open ↗
08/28/2026B00490655-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
08/15/2022340830122Open ↗
▸BISSTREET TREE CHECKLIST1
12/29/2021340830122Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00490655-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00490655-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00490655-I1Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis3
08/15/2026B00642562-I1Open ↗
08/13/2026B00643943-I1Open ↗
08/13/2026B00490655-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/15/2026B00642562-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00643971-I1Open ↗
08/13/2026B00643963-I1Open ↗
▸DOB NOWTR4 Plot Diagram2
08/13/2026B00643971-I1Open ↗
08/13/2026B00643963-I1Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026B00643963-I1Open ↗
08/13/2026B00643971-I1Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertificate of Insurance1
08/13/2026B00490655-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026B00490655-I1Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
08/15/2022340830122Open ↗
12/29/2021340830122Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/29/2021340830122Open ↗
▸Other Documents10
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00490655-P2Open ↗
08/13/2026B00490655-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00643963-I1Open ↗
08/13/2026B00643971-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B00490655-I1Open ↗
08/13/2026B00490655-P2Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
08/15/2022340830122Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
08/15/2022340830122Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00490655-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026B00490655-I1Open ↗