← Back
BuildNYC
Elevator apt, fireproof without stores
3321 GLENWOOD ROAD
BROOKLYN · BIN 3429240
💬 Discuss this project
0Year Built
8Stories
D3Building Class
R6Zoning
22,000 sfGross Floor Area
27Units
Rent Stabilized6 Active Violations ▸FDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: 3321 Glenwood · 4,400 sf lot · 5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofCandor Capital One LLC60p · 6 filings · 20 docs
BulkheadCandor Capital One LLC2p · 2 filings · 20 docs
Floor 7Candor Capital One LLC62p · 6 filings · 20 docs
Floor 6Candor Capital One LLC62p · 6 filings · 20 docs
Floor 5Candor Capital One LLC60p · 6 filings · 20 docs
Floor 4Candor Capital One LLC60p · 6 filings · 20 docs
Floor 3Candor Capital One LLC60p · 6 filings · 20 docs
Floor 2Candor Capital One LLC61p · 6 filings · 20 docs
Floor 1Candor Capital One LLC66p · 9 filings · 20 docs
Site & exteriorCandor Capital One LLC26p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Candor Capital One4707/08/2026
3321 Glenwood503/22/2026
1565 New York203/21/2026
543 Albany Holdings103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/16/2019$750K—Private party → 3321 GLENWOOD LLC$34/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediting 4 U1303/21/2026
AE Design Solution803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Target ConstructionGeneral Contractor1207/08/2026
Core Scaffold SystemsScaffold707/08/2026
TFK ElectricElectrical503/22/2026
Target ConstructionScaffold307/08/2026
Target Constructionspecialty_contractor203/21/2026
D & F Construction GroupGeneral Contractor103/22/2026
Best Mechanical ServicesPlumbing107/08/2026
Rightway Plumbing and HeatingFire Protection107/08/2026
Design N SafetyGeneral Contractor110/15/2018
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616811/04/2022
Building Lifecycle
07/15/2026
Elevator Category 1 inspection report filed
04/17/2026
1) provide access to elevator mr so that proper inspection can be conducted.
ECB violation · open
04/16/2026
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT SOUTH WALL IN THE BATHROOM LOCATED AT…
HPD violation · closed
04/30/2025
§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE…
HPD violation · closed
04/30/2025
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE BATHROOM LOCATED AT APT 6D,…
HPD violation · closed
114 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offTarget Construction10/19/2022
DOB NOWCurb CutSigned-offTarget Construction09/02/2022
DOB NOWGeneral ConstructionPermit IssuedTarget Construction05/13/2022
DOB NOWStructuralSigned-offTarget Construction03/31/2022
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems03/29/2022
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems03/29/2022
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems03/29/2022
DOB NOWSprinklersSigned-offRightway Plumbing and Heating03/25/2022
DOB NOWPlumbingSigned-offBest Mechanical Services03/25/2022
DOB NOWFoundationSigned-offTarget Construction03/13/2022
DOB NOWSupport of ExcavationSigned-offTarget Construction03/09/2022
DOB NOWConstruction FenceSigned-offTarget Construction10/19/2021
DOB NOWConstruction FenceSigned-offTarget Construction10/27/2020
BIS—ISSUEDDesign N Safety10/15/2018
5 projects · most recent 12/02/2022
General Wiring
FiledStatusContractorScope
12/02/2022CompleteTFK Electric—
11/16/2022CompleteStar Electrical Contractors—
05/29/2022CompleteTFK ElectricGeneral Wiring
05/02/2022CompleteTFK Electric—
03/27/2022CompleteV. Vass Electric—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
10/19/2022Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
10/19/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
10/14/2022Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
10/14/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/23/2022Pass-Final CND-Occupancy InspectionPassView ↗
09/14/2022Fail-Final Curb Cut Non-Directive 14FailView ↗
08/29/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/17/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/07/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/07/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
11/01/2022HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
11/01/2022HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
11/01/2022HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
11/01/2022Maintenance informationFAHAD FATEHenergy_progress
11/01/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
10/24/2022Maintenance informationFAHAD FATEHenergy_progress
10/24/2022HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
10/24/2022HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
10/24/2022HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
10/24/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
10/20/2022Electrical motors and elevatorsFAHAD FATEHenergy_progress
10/20/2022Exterior lighting powerFAHAD FATEHenergy_progress
10/20/2022Alternative Materials - OTCR Buildings Bulletin NumberFAHAD FATEHspecial
10/20/2022Insulation placement and R valuesFAHAD FATEHenergy_progress
10/20/2022Fenestration air leakageFAHAD FATEHenergy_progress
10/20/2022MeteringFAHAD FATEHenergy_progress
10/20/2022Protection of exposed foundation insulationFAHAD FATEHenergy_progress
10/20/2022Maintenance informationFAHAD FATEHenergy_progress
10/20/2022Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
10/20/2022Interior lighting powerFAHAD FATEHenergy_progress
10/20/2022Lighting in dwelling unitsFAHAD FATEHenergy_progress
10/20/2022Concrete - Cast-In-PlaceFAHAD FATEHspecial
10/20/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
10/20/2022Sprayed fire-resistant materialsFAHAD FATEHspecial
10/20/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
Latest 25 of 48.
118 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account