1950Year Built
2Stories
A5Building Class
R4Zoning
1,420 sfGross Floor Area
1Units
One family attached or semi-detached · 1,800 sf lot · 0.79 FAR built · Flood zone X
Locations of Work
Electrical
Roof3p · 1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR208/19/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ISLAND ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281208/19/2025
Building Lifecycle
All (9)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (5)
10/14/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 8 Panels, 3.28 kW
X01129810-I1
08/19/2025
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 8 Panels, 3.28 kW
X01129810-P1
08/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
08/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
08/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
08/19/2025
Special inspection requirement — Final
Mina Makar
08/19/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
11/13/2024
Permit issued — Solar
X01129810-I1-SL
11/05/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 8 Panels, 3.28 kW
X01129810-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR11/13/2024
1 project · most recent 10/21/2024
FiledStatusContractorScope
10/21/2024CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/19/2025Fire-Resistant Penetrations and JointsMina Makarspecial
08/19/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
08/19/2025Energy Code Compliance InspectionsMina Makarprogress
08/19/2025FinalMina Makarprogress
08/19/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/18/2026X01129810-I1Request digital key ↗
08/18/2026X01129810-P1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/18/2026X01129810-I1Open ↗
08/18/2026X01129810-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/26/2026X01129810-P1Open ↗
09/26/2026X01129810-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/26/2026X01129810-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/18/2026X01129810-I1Open ↗
08/18/2026X01129810-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01129810-I1Open ↗