DOB05/02/2025REQUESTING ENGINEERING REPORT DUE TO COMPROMISED RETAINING WALL. AT THE TIME OF INSPECTION OBSERVED AT EXPOSURE # 3 RETAINING WALL WITH A LARGE STEP CRACK FROM TOP TO BOTTOM OF THE WALL(APPROX 5 FEET), ALSO CMU BLOCKS THAT HAVE SHIFTED AND BULGING OUT.
Two family brick · 2,500 sf lot · 1.23 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.