333 3RD STREET
BROOKLYN · Park Slope · BIN 3020912
💬 Discuss this project
1921Year Built
4Stories
C6Building Class
R6BZoning
8,560 sfGross Floor Area
8Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Walk-up cooperative · Owner of record: 333 Third St · 2,532 sf lot · 3.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofRoof mounted photovoltaic system installation8p · 2 filings · 13 docs
Floor 4Unit 6E9p · 3 filings · 11 docs
Floor 3
Floor 2
Floor 1Heavy duty sidewalk shed installationUnder Construction2p · 1 filing · 2 docs
BasementRoof mounted photovoltaic system installation1p · 1 filing · 10 docs
Sub-BasementRoof mounted photovoltaic system installation1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
333 3rd St1207/08/2026
333 Third St704/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Asr Engineering108/17/2026
NY Building Associates203/02/2026
M C Structural Engineering103/30/2021
Kimoy Studios Architecture203/29/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Cornerstone Consulting303/21/2026
Brooklyn Solarworks203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Gaudioso ContractingGeneral Contractor407/08/2026
Arc Electrical & Mechanical Conspecialty_contractor303/22/2026
Brookyln SolarworksElectrical203/21/2026
ZKW EnterprisesScaffold208/20/2026
Brooklyn SolarworksGeneral Contractor104/09/2026
Plumbing-It MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM Engineering6244203/02/2026
M C Structural Engineering4890103/30/2021
Kimoy Studios3572203/29/2021
Building Lifecycle
All (33)Filed (6)Permit Issued (7)Signed Off (4)Violation (8)Inspection (3)Special Inspection (5)
08/19/2026
Permit issued — Supported Scaffold
B01446563-I1-SH
08/18/2026
Permit issued — Supported Scaffold
B01446563-I1-SF
08/17/2026
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01446563-I1
03/03/2026
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01275523-I1
03/02/2026
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01275523-P1
02/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
02/25/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
02/25/2026
Special inspection requirement — Final
NARESH MAHANGU
02/25/2026
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
09/03/2025
Permit issued — Solar
B01275523-I1-SL
08/25/2025
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01275523-I1
04/03/2024
Violation issued (HPD, closed)
A
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/24/2022
Signed off — Alteration
HEREBY FILING PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. APPLICATION IS FILED ALONGSIDE GENERAL CONSTRUCTION APPLICATION: B00469069-I1 AND STRUCTURAL APPLICATION: B00471013-I1
B00471961-I1
05/24/2022
Signed off — Alteration
B00469069-I1
05/18/2022
Permit issued — General Construction
B00469069-I1-GC
04/03/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/10/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/23/2022
Signed off — Alteration
B00471013-I1
02/18/2022
Violation issued (HPD, closed)
A
01/20/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/21/2021
Permit issued — Structural
B00471013-I1-ST
07/21/2021
Permit issued — Plumbing
B00471961-I1-PL
07/12/2021
Permit issued — General Construction
B00469069-I1-GC
04/05/2021
Violation issued (HPD, closed)
A
03/30/2021
Filed — Alteration
B00471013-I1
03/29/2021
Filed — Alteration
HEREBY FILING PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. APPLICATION IS FILED ALONGSIDE GENERAL CONSTRUCTION APPLICATION: B00469069-I1 AND STRUCTURAL APPLICATION: B00471013-I1
B00471961-I1
03/29/2021
Filed — Alteration
B00469069-I1
03/23/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Kim
10/06/2015
Violation issued (HPD, closed)
I
06/01/1994
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
08/16/1993
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedZKW Enterprises08/19/2026
DOB NOWSupported ScaffoldPermit IssuedZKW Enterprises08/18/2026
DOB NOWSolarSigned-offBrooklyn Solarworks09/03/2025
DOB NOWGeneral ConstructionSigned-offGaudioso Contracting05/18/2022
DOB NOWStructuralSigned-offGaudioso Contracting07/21/2021
DOB NOWPlumbingSigned-offJVR Plumbing and Heating07/21/2021
DOB NOWGeneral ConstructionSigned-offGaudioso Contracting07/12/2021
4 projects · most recent 08/18/2026
General Wiring
FiledStatusContractorScope
08/18/2026Permit IssuedRichard Neu—
11/25/2025CompleteBrookyln Solarworks3 meters
09/28/2021CompleteCatello Electrical ContGeneral Wiring
08/21/2019CompleteElectrical SecurityGeneral Wiring
1 project · most recent 08/17/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/17/2026Permit IssuedZKW EnterprisesScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/03/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/10/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/25/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
02/25/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
02/25/2026FinalNARESH MAHANGUprogress
02/25/2026Air barrier - visual inspectionNARESH MAHANGUenergy_progress
03/23/2021Fire-Resistant Penetrations and JointsJohn Kimspecial
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch3
08/20/2026B01275523-P1Request digital key ↗
08/20/2026B01275523-I1Request digital key ↗
08/18/2026B01446563-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/01/2026B00469069-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/01/2026B00471961-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/01/2026B00471013-I1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00469069-I1Open ↗
09/01/2026B00471961-I1Open ↗
09/01/2026B00471013-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/30/2026B00471961-I1Open ↗
08/23/2026B01275523-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026B01275523-P1Open ↗
08/23/2026B01275523-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00469069-I1Open ↗
09/01/2026B00471961-I1Open ↗
09/01/2026B00471013-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00469069-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01275523-I1Open ↗