← Back
Three families
333 48 STREET
BROOKLYN · Sunset Park (West) · BIN 3012200
💬 Discuss this project
1910Year Built
3Stories
C0Building Class
R6BZoning
3,096 sfGross Floor Area
3Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Three families · Owner of record: C&Z 333 REAL PROPERTY LLC · 2,003 sf lot · 1.55 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 31p · 1 filing · 12 docs
Floor 2
Floor 11p · 2 filings · 18 docs
Cellar9p · 2 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
C&Z 333 REAL PROPERTY LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/07/2025$1.5M—Private party → C&Z 333 REAL PROPERTY LLC$472/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FARHAD BASSIRI-TEHRANI606/07/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor303/21/2026
S & L PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394306/07/2025
Building Lifecycle
All (27)Filed (6)Permit Issued (2)Signed Off (2)Violation (5)Inspection (3)Special Inspection (9)
05/01/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, closed)
I
06/30/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT FRONT AND REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01168039-I1
06/30/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBINGWORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW YARD DRAIN; NEWWASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01168057-I1
06/26/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
06/09/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
06/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
06/07/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT FRONT AND REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01168039-P2
06/07/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBINGWORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW YARD DRAIN; NEWWASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01168057-P2
06/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
06/07/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
06/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
06/06/2025
Violation issued (HPD, open)
A
04/28/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/28/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/18/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBINGWORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW YARD DRAIN; NEWWASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01168057-P1
04/18/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT FRONT AND REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01168039-P1
04/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
04/18/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
04/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
01/23/2025
Permit issued — Plumbing
B01168057-I1-PL
01/22/2025
Permit issued — General Construction
B01168039-I1-GC
01/17/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT FRONT AND REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01168039-I1
01/17/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBINGWORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW YARD DRAIN; NEWWASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01168057-I1
04/08/2024
Violation issued (HPD, closed)
A
03/20/2023
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offS & L PLUMBING INC01/23/2025
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC01/22/2025
1 project · most recent 02/01/2025
General Wiring
FiledStatusContractorScope
02/01/2025CompleteA.C. MORGAN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/26/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/28/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/28/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/09/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
06/09/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
06/09/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
06/07/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
06/07/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
06/07/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
04/18/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
04/18/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
04/18/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/23/2026B01168039-P2Request digital key ↗
08/23/2026B01168039-P1Request digital key ↗
08/23/2026B01168039-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026B01168039-P2Open ↗
08/23/2026B01168039-P1Open ↗
08/23/2026B01168039-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/30/2026B01168039-I1Open ↗
08/30/2026B01168039-P1Open ↗
08/24/2026B01168039-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/30/2026B01168039-P1Open ↗
08/30/2026B01168039-I1Open ↗
08/24/2026B01168039-P2Open ↗