2 Open Violations 1 unresolved · 1 paperwork only▸
ECB03/06/2025FENCE EXCEEDS PERMITTED HEIGHT. RCA PAST DUE 60 DAYS ISSUED 12/26/24 BY #3285 WHO NOTED FRONT OF PREMISES FENCE IS APPROXIMATELY 6' IN HEIGHT IN VIOLATION OF THE 4' MAX HEIGHT REQUIREMENT. NO PERMITS ISSUED OR$500 due
ECB10/02/2015BC3301.2 FAILURE TO PROVIDE 3'6" GUARDRAIL OR EQUIVALENT AROUND ALL FLOOR AND PERIMETER OPENINGS. AT THE TIME OF INSPECTION THERE WAS NO GUARDRAIL AROUND THE OPENING FLOOR AT THE SECOND FLOOR LEVEL.IN ADDITINothing owed — awaiting certificate of correction
Two family frame · 1,800 sf lot · 1.32 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.