💬 Discuss this project
1965Year Built
17Stories
D4Building Class
C1-6AZoning
197,904 sfGross Floor Area
210Units
LL97 CoveredRent Stabilized35 Active Violations 33 unresolved · 2 paperwork only ▸FISP: SAFE
Elevator cooperative · Owner of record: Stuyvesant Owners · 15,487 sf lot · 12.78 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofJordan Cooper LLCUnder Construction21p · 4 filings · 20 docs
BulkheadJordan Cooper LLCUnder Construction3p · 1 filing · 9 docs
Floor 16Unit 16L, Unit 16M6p · 1 filing · 10 docs
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6Unit 6A, Unit 6D, Unit 6G +112p · 4 filings · 20 docs
Floor 5
Floor 4
Floor 3Unit 3MUnder Construction5p · 1 filing · 16 docs
Floor 2Unit 2E3p · 1 filing · 10 docs
Floor 1Installation of Heavy Duty Sidewalk Shed6p · 2 filings · 6 docs
CellarRemove existing fuel oil storage tank4p · 2 filings · 6 docs
Site & exteriorRoof replacementUnder Construction6p · 4 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Stuyvesant Owners12003/22/2026
Jordan Cooper & Associates1203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Richard Wainer Architect403/21/2026
Clarke Construction Consultants203/21/2026
Building Brothers403/21/2026
Rigid Structural Design203/21/2026
Framework Consultants603/21/2026
Gee2000 Architect403/21/2026
Ame Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Central Construction ManagementScaffold907/08/2026
Evolution InteriorsGeneral Contractor303/21/2026
Reliable EnterprisesScaffold207/25/2026
Central Construction ManagementGeneral Contractor203/21/2026
Lower East Side ConstructionGeneral Contractor203/21/2026
BK Plumbing & Heating CoPlumbing207/08/2026
Paul SignsSign hanger207/08/2026
WCK ElectricElectrical103/22/2026
Volvie Herman ContractingElectrical103/21/2026
Alti ConstructionGeneral Contractor107/08/2026
Any Temp Any TimeGeneral Contractor107/08/2026
Liebhaber CompanyGeneral Contractor104/09/2026
MNR Restoration Groupspecialty_contractor107/02/2026
Solomon ContractingGeneral Contractor107/08/2026
MNR GroupScaffold108/30/2026
A.M.NPlumbing107/08/2026
Cara Plumbing GroupPlumbing107/08/2026
Carreras Home ImprovementPlumbing107/08/2026
Avellino Electrical ContractingElectrical103/21/2026
Parkset Plumbing CoPlumbing107/08/2026
Star Electrical ContractorsElectrical103/21/2026
Berger CarlosElectrical103/21/2026
Herman WilliamElectrical103/21/2026
Avalon ElectricElectrical103/21/2026
Gsa ElectricElectrical103/21/2026
RM Electric CoElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Howard L Zimmerman Architects1712309/25/2026
Ronald Nemec Architect, P8386209/11/2026
Gregory V. Perotto, P.E947308/12/2026
Bazini Engineering1808103/27/2025
Urban Integrations7993111/21/2024
Domani Inspection Service843101/29/2024
Ace Structural Engineering496101/26/2024
Gee2000 Architect691107/26/2023
Napach Architectu2945107/09/2021
Building Lifecycle
All (219)Filed (29)Permit Issued (27)Signed Off (12)Facade (FISP) (15)Violation (60)Inspection (12)Objection (34)Special Inspection (30)
09/29/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01394974-P1
09/29/2026
Objection resolved — Addressed
09/28/2026
Objection resolved — Resolved
09/25/2026
Filed — Alteration
PROBES AND PATCHING IN FIRE RATED CONSTRUCTION AS INDICATED AT 6TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01401711-P2
09/25/2026
Objection raised — Inspections
09/24/2026
Objection raised — Scope
09/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
Jon Colatrella
09/24/2026
Special inspection requirement — Final
Jon Colatrella
09/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jon Colatrella
09/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/23/2026
Objection resolved — Addressed
09/21/2026
Objection raised — Scope
09/11/2026
Filed — Alteration
PL WORK FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01357390-P2
09/11/2026
Filed — Alteration
PL WORK FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01357390-P1
09/02/2026
Filed — Alteration
INTERIOR RENOVATION OF APARTMENT #6G. NO CHANGE IN EGRESS, USE OR OCCUPANCY INVOLVED UNDER THIS APPLICATION. PLUMBING WORK TO BE FILED ON AN LAA
M01442950-I1
09/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/28/2026
Filed — Alteration
PROBES AND PATCHING IN FIRE RATED CONSTRUCTION AS INDICATED AT 6TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01401711-P1
08/27/2026
Permit issued — Supported Scaffold
M01389914-I1-SF
08/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/27/2026
Special inspection requirement — Final
08/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/14/2026
Special inspection requirement — Mechanical Systems
Gregory Perotto
08/14/2026
Special inspection requirement — Final
Gregory Perotto
08/12/2026
Filed — Alteration
Proposed work to comply with ECB violation #39171514R. Replacement two ventilation fans on the roof, one Greenheck fan model GB-360-15-1-46-X and one Jenco fan model SDB22QH3S. No change in egress, use, or occupancy.
M01356981-P1
08/12/2026
Special inspection requirement — Final
Ronald Nemec
08/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ronald Nemec
08/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Ronald Nemec
08/12/2026
Special inspection requirement — Lighting in dwelling units
Ronald Nemec
08/11/2026
Special inspection requirement — Mechanical Systems
Gregory Perotto
08/11/2026
Special inspection requirement — Final
Gregory Perotto
08/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/07/2026
Special inspection requirement — Final
08/05/2026
Violation issued (ECB, closed)
Construction
07/29/2026
Violation issued (ECB, open)
Construction
07/23/2026
Permit issued — Sidewalk Shed
M01394974-I1-SH
07/06/2026
Permit issued — Plumbing
M01357390-S1-PL
06/30/2026
Permit issued — General Construction
M01309804-I1-GC-CX
06/17/2026
Violation issued (HPD, open)
C
06/17/2026
Objection resolved — Addressed
06/15/2026
Violation issued (HPD, open)
B
06/15/2026
Violation issued (HPD, open)
B
06/15/2026
Violation issued (HPD, open)
B
06/15/2026
Violation issued (HPD, open)
A
06/15/2026
Violation issued (HPD, open)
A
06/15/2026
Violation issued (HPD, open)
A
06/11/2026
Objection raised — Other
06/10/2026
Objection resolved — Addressed
06/10/2026
Objection resolved — Addressed
06/10/2026
Objection resolved — Addressed
06/04/2026
Signed off — Alteration
Installation of an 8 foot glass wall and door creating a package room in the lobby. No change in egress, use or occupancy.
M01357662-I1
06/03/2026
Violation issued (HPD, open)
B
05/29/2026
Violation issued (HPD, closed)
C
05/29/2026
Violation issued (HPD, open)
A
05/29/2026
Violation issued (HPD, open)
B
05/29/2026
Violation issued (HPD, open)
B
05/29/2026
Violation issued (HPD, closed)
C
05/28/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01389914-I1
Latest 60 of 219 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedMNR Group08/27/2026
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises07/23/2026
DOB NOWPlumbingPermit IssuedCara Plumbing Group07/06/2026
DOB NOWGeneral ConstructionPermit IssuedMNR Restoration Group06/30/2026
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises05/21/2026
DOB NOWSuspended ScaffoldPermit IssuedMNR Group05/11/2026
DOB NOWGeneral ConstructionPermit IssuedSolomon Contracting04/22/2026
DOB NOWGeneral ConstructionSigned-offLiebhaber Company04/03/2026
DOB NOWMechanical SystemsPermit IssuedAny Temp Any Time03/25/2026
DOB NOWBoiler EquipmentSigned-offParkset Plumbing Co04/17/2025
DOB NOWSuspended ScaffoldSigned-offNew Amsterdam Restoration12/03/2024
DOB NOWPlumbingSigned-offParkset Plumbing Co06/25/2024
DOB NOWPlumbingSigned-offA.M.N05/20/2024
DOB NOWGeneral ConstructionSigned-offAlti Construction05/16/2024
DOB NOWStructuralSigned-offCentral Construction Management02/06/2024
DOB NOWPlumbingSigned-offCarreras Home Improvements08/17/2023
DOB NOWGeneral ConstructionSigned-offJD Window Clea & Construction Co08/09/2023
DOB NOWSignSigned-offPaul Signs01/24/2023
DOB NOWSignSigned-offPaul Signs01/24/2023
DOB NOWPlumbingSigned-offBK Plumbing & Heating Co10/21/2022
DOB NOWPlumbingSigned-offBK Plumbing & Heating Co10/06/2021
DOB NOWGeneral ConstructionSigned-offEvolution Interiors09/29/2021
DOB NOWSidewalk ShedSigned-offCentral Construction Management03/19/2021
DOB NOWSidewalk ShedSigned-offCentral Construction Management11/06/2020
DOB NOWSidewalk ShedSigned-offCentral Construction Management08/19/2020
DOB NOWSidewalk ShedSigned-offCentral Construction Management10/29/2019
DOB NOWSidewalk ShedSigned-offCentral Construction Management11/14/2018
BISOTISSUEDSkyline Windows11/19/2021
BISOTISSUEDSkyline Windows10/29/2021
BISOTISSUEDSkyline Windows06/25/2021
BISOTISSUEDDJM NYC06/22/2021
BISOTISSUEDSyros Construction02/12/2021
BISOTISSUEDDJM NYC10/30/2020
BISOTISSUEDCentral Construction Management08/27/2020
BISPLISSUEDCarreras Home Improvement01/24/2020
BISPLISSUEDArco Plumbing and Heating10/23/2019
BISOTISSUEDNew Rising Construction10/08/2019
BISPLISSUEDQMB Plumbing & Heating08/02/2019
BISOTISSUEDNew Rising Construction08/01/2019
BISOTISSUEDNo Limit Contracting06/14/2019
+ 37 more permits on file
1 project · most recent 08/12/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/12/2026Permit IssuedAny Temp Any TimeVentilation Systems
Ventilation
Greenheck GB-360-15-1-46-X 8,950 CFM · Exhaust Fan ×2
Jen Co #SDB22QH3S 5,264 CFM · Exhaust Fan ×2
2 projects · most recent 09/11/2026
Water/Sanitary Gas
FiledStatusContractorScope
09/11/2026Permit IssuedCara Plumbing GroupGas, Water/Sanitary
07/25/2022Signed-offBK Plumbing & Heating CoWater/Sanitary
20 projects · most recent 08/27/2026
General Wiring
FiledStatusContractorScope
08/27/2026Permit IssuedWatts Up Electric NYGeneral Wiring
05/04/2026Permit IssuedRichard Neu—
12/11/2025Permit IssuedAvalon ElectricGeneral Wiring
05/29/2024CompleteAmsterdam ElectricGeneral Wiring
05/10/2024CompleteVertex Electric—
08/14/2023CompleteStanco System Electrical ContGeneral Wiring
01/11/2023CompleteK-10 Electric—
12/20/2022CompleteRainbow Electric Co—
12/20/2022CompleteRainbow Electric Co—
02/06/2022CompleteRM Electric CoGeneral Wiring
02/04/2021CompleteGlendale Electl Contng—
11/25/2020CompleteMartinez Electrical Cont—
10/28/2019CompleteWCK ElectricGeneral Wiring
09/19/2019CompleteVertex Electric—
08/09/2019Permit IssuedGeorge HolnessGeneral Wiring
1 project · most recent 05/14/2026
Masonry
FiledStatusContractorScope
05/14/2026Permit IssuedMNR Restoration GroupMasonry
2 projects · most recent 09/29/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
09/29/2026Permit IssuedReliable EnterprisesSidewalk Shed
05/28/2026Permit IssuedMNR GroupScaffold
1 project · most recent 04/24/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/24/2026Permit IssuedMNR GroupSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
04/29/2025Pass-Final Boiler Equipment InspectionPassView ↗
10/25/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/21/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/26/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/05/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/22/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/18/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
09/24/2026Fire-Resistance Rated ConstructionJon Colatrellaprogress
09/24/2026FinalJon Colatrellaprogress
09/24/2026Fire-Resistant Penetrations and JointsJon Colatrellaspecial
09/24/2026Tenant Protection Plan Compliance—special
09/02/2026Tenant Protection Plan Compliance—special
08/27/2026Fire-Resistant Penetrations and Joints—special
08/27/2026Tenant Protection Plan Compliance—special
08/27/2026Final—progress
08/27/2026Fire-Resistance Rated Construction—progress
08/17/2026Fire-Resistant Penetrations and Joints—special
08/14/2026Tenant Protection Plan Compliance—special
08/14/2026Mechanical SystemsGregory Perottospecial
08/14/2026FinalGregory Perottoprogress
08/12/2026FinalRonald Nemecprogress
08/12/2026Fire-Resistant Penetrations and JointsRonald Nemecspecial
08/12/2026Energy Code Compliance InspectionsRonald Nemecprogress
08/12/2026Lighting in dwelling unitsRonald Nemecenergy_progress
08/11/2026Mechanical SystemsGregory Perottospecial
08/11/2026FinalGregory Perottoprogress
08/11/2026Tenant Protection Plan Compliance—special
08/07/2026Final—progress
05/13/2026Fire-Resistance Rated ConstructionJon Colatrellaprogress
05/13/2026Fire-Resistant Penetrations and JointsJon Colatrellaspecial
05/13/2026Tenant Protection Plan ComplianceJon Colatrellaspecial
05/13/2026FinalJon Colatrellaprogress
Latest 25 of 41.
▾Documents — 922 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch26
10/04/2026M01442950-I1Request digital key ↗
09/06/2026M00095453-I1Request digital key ↗
09/03/2026M00538099-I1Request digital key ↗
Showing 3 of 26 on file for this type
▸Applications & Permits183
▸BISPLAN / WORK APPROVAL APPLICATION91
08/10/2021123833450Open ↗
05/19/2021141002536Open ↗
03/30/2021123573034Open ↗
Showing 3 of 91 on file for this type
▸BISWORK PERMIT APPLICATION88
10/29/2021123573034Open ↗
06/25/2021123573034Open ↗
06/04/2021123573034Open ↗
Showing 3 of 88 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSIDEWALK SHED APPLICATION & PERMIT1
02/17/2021123573034Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
10/22/2019121797519Open ↗
▸Seals & Professional Certifications174
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION81
03/06/2020123573034Open ↗
10/11/2019123754703Open ↗
09/10/2019123455420Open ↗
Showing 3 of 81 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature28
10/05/2026M01401711-P1Open ↗
10/05/2026M01394974-P1Open ↗
10/05/2026M01401711-P2Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
10/05/2026M01357390-P1Open ↗
10/05/2026M01357390-P1Open ↗
10/05/2026M01357390-P1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
03/11/2019123754703Open ↗
Showing 1 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
05/19/2021141002536Open ↗
03/11/2019123754703Open ↗
Showing 2 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
10/05/2026M01357390-P1Open ↗
10/05/2026M01401711-P2Open ↗
09/30/2026M01401711-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
05/19/2021141002536Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
05/19/2021141002536Open ↗
Showing 1 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
05/16/2019140846707Open ↗
Showing 1 of 2 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment69
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE32
03/20/2020123894893Open ↗
07/31/2019123455420Open ↗
06/07/2019123455420Open ↗
Showing 3 of 32 on file for this type
▸BISSCHEDULE B - PLUMBING15
05/16/2019140846707Open ↗
Showing 1 of 15 on file for this type
▸BISSELF-CERT PLUMBING NOTICE15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSIGN HANGER CERTIFICATE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection17
▸BISTenant Protection Plan and Notes17
06/05/2019123894893Open ↗
03/11/2019123754703Open ↗
04/13/2021123573034Open ↗
Showing 3 of 17 on file for this type
▸Environmental & Asbestos58
▸BISASBESTOS: CERTIFICATION (DEP ACP5)21
06/05/2019123894893Open ↗
05/16/2019140846707Open ↗
03/11/2019123754703Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
10/05/2026M01401711-P1Open ↗
10/05/2026M01401711-P2Open ↗
10/04/2026M01442950-I1Open ↗
Showing 3 of 19 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
02/17/2021123573034Open ↗
Showing 1 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0966MN191
02/17/2022123531534Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
04/30/2020123833450Open ↗
▸BISDEP FORM V5 - ASBESTOS VARIANCE1
05/10/2019123531534Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/17/2026M01309804-I1Open ↗
▸Energy Compliance76
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS38
03/06/2020123573034Open ↗
10/11/2019123754703Open ↗
09/10/2019123455420Open ↗
Showing 3 of 38 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS19
03/01/2022123573034Open ↗
02/16/2022123531534Open ↗
05/20/2021140846707Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY12
03/01/2022123573034Open ↗
02/16/2022123531534Open ↗
05/20/2021140846707Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/13/2021123833450Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00538099-I1Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY13
03/01/2022123573034Open ↗
02/17/2022123531534Open ↗
02/17/2022123531534Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs79
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST48
03/03/2022123573034Open ↗
02/17/2022123531534Open ↗
08/13/2021123833450Open ↗
Showing 3 of 48 on file for this type
▸BISADMINISTRATIVE OBJECTIONS12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
10/29/2021123573034Open ↗
Showing 1 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSUPERSEDING LETTER3
06/25/2021123573034Open ↗
11/02/2020123531534Open ↗
Showing 2 of 3 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership85
▸BISCOST AFFIDAVIT81
03/01/2022123573034Open ↗
02/16/2022123531534Open ↗
08/13/2021123833450Open ↗
Showing 3 of 81 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Filing & Intake Forms123
▸BISADDITIONAL INFORMATION41
02/16/2022123531534Open ↗
08/12/2021123833450Open ↗
08/12/2021123833450Open ↗
Showing 3 of 41 on file for this type
▸BISBOROUGH INTAKE FORM41
06/25/2021123573034Open ↗
03/20/2020123894893Open ↗
01/15/2020123290018Open ↗
Showing 3 of 41 on file for this type
▸BISEFILING COVER SHEET37
05/01/2020123833450Open ↗
03/06/2020123573034Open ↗
06/04/2019123894893Open ↗
Showing 3 of 37 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
05/19/2021141002536Open ↗
05/16/2019140846707Open ↗
Showing 2 of 4 on file for this type
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWManufacturer's Specifications2
08/17/2026M01391648-I1Open ↗
08/13/2026M01142272-I1Open ↗
▸DOB NOWCalculations2
08/17/2026M01391648-I1Open ↗
08/13/2026M01142272-I1Open ↗
▸BISUnknown1
10/18/2019123531534Open ↗
▸BISARA Supporting Document1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type