← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Bronx Park
333 EAST 181ST STREET · BIN 2013306
💬 Discuss this project
1972Year Built
19Stories
D1Building Class
C8-3Zoning
125,685 sfGross Floor Area
120Units
LL97 CoveredRent Stabilized15 Active Violations 14 unresolved · 1 paperwork only 2 old, status unconfirmed ▸FISP: UNSAFE
Elevator apt, semi-fireproof without stores · Owner of record: Bronx Phase III Housing Company · 52,150 sf lot · 2.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofReliant Realty1p · 1 filing · 2 docs
Floor 3Unit 3J, Unit 3M, Unit 3N33p · 1 filing · 10 docs
Floor 228p · 1 filing · 10 docs
Floor 1Heavy duty sidewalk shed installationUnder Construction11p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Bronx Park Phase 111 HDFC203/21/2026
Bronx Phase III Housing Company103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Prise Construction Management203/30/2026
Christopher Compton210/06/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HS Design Studio203/21/2026
Riggining Consultants103/21/2026
ECC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Terra Construction GroupGeneral Contractor303/21/2026
Ultra PlumbingPlumbing203/22/2026
Shalbro Construction GroupScaffold207/08/2026
Aujla ElectricElectrical103/22/2026
Angler ElectricElectrical103/21/2026
Skyview Developers GroupScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Environmental Code Consulting5516210/06/2022
Building Lifecycle
All (87)Filed (6)Permit Issued (6)Signed Off (2)Facade (FISP) (9)Violation (60)Special Inspection (4)
05/26/2026
Violation issued (HPD, open)
C
05/26/2026
Violation issued (HPD, open)
C
05/08/2026
Violation issued (HPD, closed)
B
05/08/2026
Violation issued (HPD, closed)
A
05/08/2026
Violation issued (HPD, closed)
B
03/30/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X01108014-P1
02/15/2026
Violation issued (HPD, closed)
B
01/30/2026
Violation issued (HPD, closed)
C
01/26/2026
Permit issued — Suspended Scaffold
X01348312-I1-SC
01/19/2026
Filed — Alteration
INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS
X01348312-I1
01/08/2026
Permit issued — Sidewalk Shed
X01108014-I1-SH
11/21/2025
Cycle 9 facade report submitted
11/20/2025
Violation issued (ECB, closed)
Elevators
10/30/2025
Cycle 9 facade inspection completed
10/29/2025
Permit issued — Sidewalk Shed
X01108014-I1-SH
08/26/2025
Cycle 9 facade report signed — UNSAFE
08/13/2025
Violation issued (HPD, closed)
C
08/13/2025
Violation issued (HPD, closed)
C
08/13/2025
Violation issued (HPD, closed)
B
06/19/2025
Violation issued (HPD, open)
B
06/19/2025
Violation issued (HPD, closed)
C
11/26/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/11/2024
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X01108014-I1
09/11/2024
Permit issued — Sidewalk Shed
X01108014-I1-SH
09/05/2024
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS, SEE ATTACHED PLANS Designated Primary Site supervisor: Kenneth Cole
X00978377-I1
08/23/2024
Violation issued (ECB, open)
Elevators
08/16/2024
Violation issued (HPD, open)
C
08/16/2024
Violation issued (HPD, closed)
A
07/24/2024
Violation issued (ECB, open)
Construction
07/12/2024
Cycle 9 facade report signed — UNSAFE
07/10/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/28/2024
Cycle 9 facade inspection completed
05/08/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/06/2024
Violation issued (ECB, open)
Construction
04/16/2024
Violation issued (HPD, closed)
A
02/21/2024
Cycle 9 facade report submitted
02/21/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/11/2024
Permit issued — Suspended Scaffold
X00978377-I1-SC
01/02/2024
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS, SEE ATTACHED PLANS Designated Primary Site supervisor: Kenneth Cole
X00978377-I1
03/03/2023
Signed off — Alteration
RENOVATION OF FIRE-DAMAGED APARTMENTS AND PUBLIC CORRIDOR. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
X00758070-I1
02/01/2023
Violation issued (HPD, closed)
B
02/01/2023
Violation issued (HPD, closed)
B
10/21/2022
Permit issued — General Construction
X00758070-I1-GC
10/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTOPHER COMPTON
10/11/2022
Special inspection requirement — Final
CHRISTOPHER COMPTON
10/06/2022
Filed — Alteration
RENOVATION OF FIRE-DAMAGED APARTMENTS AND PUBLIC CORRIDOR. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
X00758070-P1
10/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTOPHER COMPTON
10/05/2022
Special inspection requirement — Final
CHRISTOPHER COMPTON
08/25/2022
Filed — Alteration
RENOVATION OF FIRE-DAMAGED APARTMENTS AND PUBLIC CORRIDOR. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
X00758070-I1
03/08/2022
Violation issued (HPD, closed)
A
02/28/2022
Violation issued (HPD, closed)
B
02/28/2022
Violation issued (HPD, closed)
C
02/28/2022
Violation issued (HPD, closed)
B
02/28/2022
Violation issued (HPD, closed)
A
02/28/2022
Violation issued (HPD, closed)
C
02/28/2022
Violation issued (HPD, closed)
A
02/04/2022
Violation issued (HPD, closed)
A
02/04/2022
Violation issued (HPD, open)
B
02/04/2022
Violation issued (HPD, closed)
B
02/04/2022
Violation issued (HPD, closed)
C
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedCentral Construction Management01/26/2026
DOB NOWSidewalk ShedPermit IssuedSkyview Developers Group01/08/2026
DOB NOWSidewalk ShedPermit IssuedShalbro Construction Group10/29/2025
DOB NOWSidewalk ShedPermit IssuedShalbro Construction Group09/11/2024
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System01/11/2024
DOB NOWGeneral ConstructionSigned-offTerra Construction Group10/21/2022
BISPLISSUEDTradeline Plumbing02/02/2016
BISEQISSUEDEmpire Scaffolding System01/15/2016
BISOTISSUEDAffordable Construction Co11/25/2015
BISOTISSUEDArta Restoration06/18/2015
BISOTISSUEDArta Restoration02/03/2015
BISEQISSUEDEmpire Scaffolding System12/31/2014
BISOTISSUEDArta Restoration11/07/2014
BISOTISSUEDSNS Orgnization10/09/2014
BISOTISSUEDAffordable Construction Co09/16/2014
BISOTISSUEDMillenium Restoration07/30/2014
BISOTISSUEDSNS Orgnization01/10/2014
BISPLISSUEDTradeline Plumbing01/10/2014
BISEQISSUEDEmpire Scaffolding System12/19/2013
BISEQISSUEDEmpire Scaffolding System03/15/2013
BISOTISSUEDMillenium Restoration03/11/2013
BISOTISSUEDMillenium Restoration11/16/2011
BISEQISSUEDOutdoor Installations07/16/2007
BISEQRE-ISSUEDOutdoor Installations07/10/2006
3 projects · most recent 09/11/2024
General Wiring
FiledStatusContractorScope
09/11/2024Permit IssuedAujla Electric—
03/08/2023CompleteIzzo ElectricGeneral Wiring
01/11/2022Permit IssuedInterstate Electric—
1 project · most recent 01/19/2026
FiledStatusContractorScope
01/19/2026Permit IssuedCentral Construction Management—
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
10/11/2022Fire-Resistant Penetrations and JointsCHRISTOPHER COMPTONspecial
10/11/2022FinalCHRISTOPHER COMPTONprogress
10/05/2022Fire-Resistant Penetrations and JointsCHRISTOPHER COMPTONspecial
10/05/2022FinalCHRISTOPHER COMPTONprogress
▾Documents — 125 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026X00758070-I1Request digital key ↗
08/23/2026X00758070-P1Request digital key ↗
08/21/2026X00978377-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits30
▸BISWORK PERMIT APPLICATION17
02/03/2016240021542Open ↗
02/02/2016220352446Open ↗
11/27/2015220387846Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION10
04/04/2015220352446Open ↗
10/03/2014220408155Open ↗
09/30/2014220119878Open ↗
Showing 3 of 10 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
08/25/2017220387846Open ↗
▸BISAFTER-HOUR WORK PERMIT APPLICATION1
06/14/2013240021542Open ↗
▸BISApplication Withdrawal/Address Change Form OP-1131
03/14/2013220119878Open ↗
▸Seals & Professional Certifications27
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
11/06/2017240021542Open ↗
08/25/2017220387846Open ↗
07/13/2017220352446Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026X00758070-P1Open ↗
08/23/2026X00758070-I1Open ↗
08/17/2026X01108014-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
10/03/2014220408155Open ↗
01/11/2014220352446Open ↗
03/15/2013240021542Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/03/2014220408155Open ↗
01/11/2014220352446Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026X00758070-I1Open ↗
08/24/2026X00758070-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026X00758070-I1Open ↗
08/24/2026X00758070-P1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/15/2013240021542Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/15/2013240021542Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
04/04/2015220352446Open ↗
01/11/2014220352446Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
04/04/2015220352446Open ↗
01/11/2014220352446Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
06/25/2014220387846Open ↗
▸Environmental & Asbestos9
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
10/03/2014220408155Open ↗
06/25/2014220387846Open ↗
01/11/2014220352446Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026X00758070-P1Open ↗
08/23/2026X00758070-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/26/2011220119878Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
06/25/2014220387846Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
08/25/2017220387846Open ↗
08/25/2017220387846Open ↗
07/13/2017220352446Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
08/25/2017220387846Open ↗
07/13/2017220352446Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/15/2013240021542Open ↗
▸Approvals, Objections & Sign-offs13
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
11/06/2017240021542Open ↗
08/25/2017220387846Open ↗
07/13/2017220352446Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
07/13/2017220352446Open ↗
02/03/2016240021542Open ↗
02/03/2016240021542Open ↗
Showing 3 of 5 on file for this type
▸BISOIL TANK REMOVAL CERT : LETTER-FO1
07/13/2017220352446Open ↗
▸BISSUPERSEDING LETTER1
11/10/2014220119878Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/26/2011220119878Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
08/25/2017220387846Open ↗
07/13/2017220352446Open ↗
08/30/2016220119878Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms12
▸BISEFILING COVER SHEET5
10/03/2014220408155Open ↗
09/05/2014220387846Open ↗
06/25/2014220387846Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION4
07/27/2016220352446Open ↗
07/12/2016220352446Open ↗
03/07/2016240021542Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
11/06/2017240021542Open ↗
08/25/2017220387846Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/15/2013240021542Open ↗
▸Other Documents3
▸DOB NOWIRA Certification2
08/13/2026X00978377-I1Open ↗
08/13/2026X01348312-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
03/15/2013240021542Open ↗