Condo, office space
333 East 38th Street
673 1 AVENUE · BIN 1021925
💬 Discuss this project
1928Year Built
13Stories
RBBuilding Class
C1-9Zoning
356,238 sfGross Floor Area
15Units
LL97 Covered3 Open Violations ▸FISP: UNSAFEFDNY Report ↗
Condo, office space · 34,562 sf lot · 10.31 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction240p · 16 filings · 20 docs
BulkheadUnder Construction1p · 1 filing · 15 docs
PenthouseUnder Construction250p · 13 filings · 20 docs
Floor 141p · 1 filing · 8 docs
Floor 13Under Construction17p · 1 filing · 6 docs
Floor 12Under Construction20p · 2 filings · 20 docs
Floor 11Under Construction257p · 13 filings · 20 docs
Floor 10Under Construction212p · 13 filings · 20 docs
Floor 9Under Construction213p · 14 filings · 20 docs
Floor 8Under Construction259p · 15 filings · 20 docs
Floor 7Under Construction259p · 15 filings · 20 docs
Floor 6Under Construction405p · 22 filings · 20 docs
Floor 5Under Construction240p · 16 filings · 20 docs
Floor 4Under Construction381p · 16 filings · 20 docs
Floor 3Under Construction378p · 16 filings · 20 docs
Floor 2Under Construction414p · 17 filings · 20 docs
Floor 1Under Construction227p · 12 filings · 20 docs
MezzanineUnder Construction100p · 2 filings · 19 docs
CellarUnder Construction305p · 19 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYU LANGONE HEALTH26909/24/2026
NEW CINGULAR WIRELESS PCS, LLC907/08/2026
MICHAEL ANTHONY CONTRACTI303/22/2026
SL GREEN2903/22/2026
TISHMAN CONSTRUCTION503/22/2026
NYU LMC E GARAGE CORP103/22/2026
SL GREEN REALTY11203/22/2026
NEW YORK UNIVERSITY203/22/2026
673 FIRST AVENUE ASSOCIATES303/22/2026
S.L GREEN C/0 RICK SERRIP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EUROCELT EXPEDITING, INC9803/21/2026
OUTSOURCE CONSULTANTS, INC.11103/21/2026
RIGGING CONSULTANTS803/21/2026
HOWARD I SHAPIRO ASSOCIATES1203/21/2026
JP EXPEDITE1203/21/2026
BUILDING BROTHERS603/21/2026
AE DESIGN SOLUTION603/21/2026
CCM CONSULTING GROUP, INC.303/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATFORM SOLUTIONS, INCGeneral Contractor8808/01/2026
TISHMAN CONSTRUCTION CORPGeneral Contractor8708/08/2026
RAEL AUTOMATIC SPR.CO INCFire Protection2207/08/2026
W5 GROUP LLCGeneral Contractor1707/08/2026
PACE PLUMBING CORPFire Protection1207/08/2026
SIGNS CADScaffold1207/08/2026
TRISTATE PLBG SVCS CORPPlumbing909/09/2026
RAEL AUTOMATIC SPR. CO.INFire Protection807/08/2026
NELSON AIR DEVICE CORPGeneral Contractor707/08/2026
PAR PLUMBING CO., INCPlumbing709/24/2026
BENJAMIN CONSTRUCTION CORGeneral Contractor707/08/2026
K.G. MECHANICAL INCPlumbing607/08/2026
PJP INSTALLERS INCGeneral Contractor507/08/2026
Z-CAR-DScaffold507/08/2026
JACOBS TELECOMMUN. INCGeneral Contractor407/08/2026
ALLIANCE PLUMBING CORPPlumbing407/08/2026
PACE PLUMBING CORPPlumbing307/08/2026
E-J ELEC. INSTALLATION COElectrical303/22/2026
DIGITAL CONSTRUCTION TECHGeneral Contractor303/21/2026
JAY HELFGOTTElectrical203/21/2026
LAWRENCE J. LEVINEFire Protection203/21/2026
METRO FIRE PROTECTION INCFire Protection207/08/2026
CURRENT FIRE PROTECTION INCFire Protection207/08/2026
NEXT SOLUTIONS C.S. INCGeneral Contractor207/08/2026
CARDOZA PLUMBING CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC4237207/20/2026
PCS ENGINEERING3745401/06/2026
KMB DESIGN GROUP, LLC513302/14/2025
ATLANTIC ENGINEERINGLABOR1381604/09/2024
Building Lifecycle
All (300)Filed (70)Permit Issued (80)Signed Off (20)Facade (FISP) (6)Violation (13)Inspection (60)Objection (21)Special Inspection (30)
09/23/2026
Permit issued — Plumbing
M08027276-I1-PL
09/08/2026
Permit issued — Plumbing
M08020395-I1-PL
08/19/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/10/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/09/2026
Special inspection requirement — Mechanical Systems
Young Suh
08/09/2026
Special inspection requirement — Post-installed Anchors
Young Suh
08/09/2026
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
08/09/2026
Special inspection requirement — Final
Young Suh
08/09/2026
Special inspection requirement — Shutoff dampers
Young Suh
08/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
08/09/2026
Special inspection requirement — Duct leakage testing, insulation and design
Young Suh
08/07/2026
Permit issued — General Construction
M01060442-I1-GC
08/04/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/29/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/29/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/27/2026
Special inspection requirement — Post-installed Anchors
Young Suh
07/27/2026
Special inspection requirement — Mechanical Systems
Young Suh
07/27/2026
Special inspection requirement — Final
Young Suh
07/27/2026
Special inspection requirement — Emergency and Standby Power Systems (Generator)
Young Suh
07/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
07/24/2026
Special inspection requirement — Interior lighting power
Young Suh
07/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
07/24/2026
Special inspection requirement — Ventilation and air distribution system
Young Suh
07/24/2026
Special inspection requirement — Electrical motors and elevators
Young Suh
07/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
Young Suh
07/24/2026
Special inspection requirement — Shutoff dampers
Young Suh
07/24/2026
Special inspection requirement — Mechanical Systems
Young Suh
07/24/2026
Special inspection requirement — Lighting controls
Young Suh
07/24/2026
Special inspection requirement — Post-installed Anchors
Young Suh
07/24/2026
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
07/24/2026
Special inspection requirement — Duct leakage testing, insulation and design
Young Suh
07/24/2026
Special inspection requirement — Final
Young Suh
07/23/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/20/2026
Filed — Alteration
NYU-Infrastructure MER - INSTALLATION OF HVAC EQUIPMENT INCLUDING CHILLERS, COOLING TOWERS, AIR HANDLING UNITS, AIR TERMINAL UNITS, ETC., AND INSTALLATION OF ALL ASSOCIATED DUCTWORK, PIPING, INSULATION, CONTROLS, ETC. NO CHANGE OF USE, EGRESS OR OCCUPANCY
M08029624-P4
07/20/2026
Permit issued — Construction Fence
M07999501-I1-FN
07/20/2026
Permit issued — Sidewalk Shed
M00729130-I1-SH
07/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/17/2026
Permit issued — Structural
M08027838-I1-ST
07/15/2026
Filed — Alteration
NYU - Infrastructure - MECHANICAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M08026777-P2
07/15/2026
Permit issued — General Construction
M08025728-I1-GC
07/15/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/15/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
07/15/2026
Special inspection requirement — Interior lighting power
Young Suh
07/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
07/15/2026
Special inspection requirement — Electrical motors and elevators
Young Suh
07/15/2026
Special inspection requirement — Final
Young Suh
07/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
07/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
07/08/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/08/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
07/07/2026
Permit issued — Protection and Mechanical Methods
M00914300-I1-PMM
07/02/2026
Filed — Alteration
NYU - Ambulatory Surgery Center - MECHANICAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08030098-P1
07/02/2026
Filed — Alteration
NYU - Ambulatory Surgery Center - SPRINKLER/STANDPIPE MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M08030278-P1
07/02/2026
Filed — Alteration
NYU - Ambulatory Surgery Center - PLUMBING MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M08030306-P1
07/01/2026
Filed — Alteration
NYU - Infrastructure Package - NEW GENERATOR AND ASSOCIATED PIPING ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M08027620-P1
07/01/2026
Filed — Alteration CO
NYU - Infrastructure MER - MER ADDITION ACCORDING TO PLANS FILED HEREWITH. MINOR CHANGE TO CERTIFICATE OF OCCUPANCY UNDER THIS APPLICATION.
M08025728-P1
07/01/2026
Permit issued — General Construction
M08025728-I1-GC
07/01/2026
Permit issued — Suspended Scaffold
M01112693-I1-SC
06/30/2026
Objection resolved — Addressed
06/26/2026
Filed — Alteration
NYU - Infrastructure Package - INFRASTRUCTURE MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH AND NEW ELEVATOR BULKHEAD. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01060442-P1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC09/23/2026
DOB NOWPlumbingPermit IssuedTRISTATE PLBG SVCS CORP09/08/2026
DOB NOWGeneral ConstructionPermit IssuedTISHMAN CONSTRUCTION CORP08/07/2026
DOB NOWSidewalk ShedPermit IssuedPLATFORM SOLUTIONS, INC07/20/2026
DOB NOWConstruction FencePermit IssuedPLATFORM SOLUTIONS, INC07/20/2026
DOB NOWStructuralPermit IssuedTISHMAN CONSTRUCTION CORP07/17/2026
DOB NOWGeneral ConstructionPermit IssuedTISHMAN CONSTRUCTION CORP07/15/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPLATFORM SOLUTIONS, INC07/07/2026
DOB NOWSuspended ScaffoldSigned-offPULLMAN SST INC07/01/2026
DOB NOWGeneral ConstructionPermit IssuedTISHMAN CONSTRUCTION CORP07/01/2026
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC06/17/2026
DOB NOWStandpipePermit IssuedRAEL AUTOMATIC SPR.CO INC06/17/2026
DOB NOWStandpipePermit IssuedRAEL AUTOMATIC SPR.CO INC06/08/2026
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC06/08/2026
DOB NOWProtection and Mechanical MethodsSigned-offPLATFORM SOLUTIONS, INC06/04/2026
DOB NOWMechanical SystemsPermit IssuedTISHMAN CONSTRUCTION CORP05/29/2026
DOB NOWMechanical SystemsPermit IssuedTISHMAN CONSTRUCTION CORP05/29/2026
DOB NOWGeneral ConstructionPermit IssuedTISHMAN CONSTRUCTION CORP05/29/2026
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC05/13/2026
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC05/13/2026
DOB NOWSidewalk ShedPermit IssuedPLATFORM SOLUTIONS, INC05/05/2026
DOB NOWStructuralPermit IssuedW5 GROUP LLC04/28/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedW5 GROUP LLC04/28/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPLATFORM SOLUTIONS, INC04/27/2026
DOB NOWPlumbingPermit IssuedALLIANCE PLUMBING CORP04/24/2026
DOB NOWBoiler EquipmentSigned-offK.G. MECHANICAL INC04/24/2026
DOB NOWSidewalk ShedPermit IssuedPLATFORM SOLUTIONS, INC02/18/2026
DOB NOWSuspended ScaffoldSigned-offPULLMAN SST INC02/17/2026
DOB NOWStandpipePermit IssuedRAEL AUTOMATIC SPR.CO INC02/12/2026
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC02/12/2026
DOB NOWBoiler EquipmentSigned-offK.G. MECHANICAL INC01/23/2026
DOB NOWStructuralPermit IssuedTISHMAN CONSTRUCTION CORP01/14/2026
DOB NOWGeneral ConstructionPermit IssuedTISHMAN CONSTRUCTION CORP01/14/2026
DOB NOWMechanical SystemsPermit IssuedTISHMAN CONSTRUCTION CORP01/14/2026
DOB NOWStructuralSigned-offTISHMAN CONSTRUCTION CORP01/14/2026
DOB NOWMechanical SystemsPermit IssuedTISHMAN CONSTRUCTION CORP01/14/2026
DOB NOWStructuralPermit IssuedTISHMAN CONSTRUCTION CORP01/13/2026
DOB NOWPlumbingPermit IssuedTRISTATE PLBG SVCS CORP01/07/2026
DOB NOWGeneral ConstructionPermit IssuedTISHMAN CONSTRUCTION CORP01/07/2026
DOB NOWGeneral ConstructionPermit IssuedTISHMAN CONSTRUCTION CORP12/29/2025
+ 60 more permits on file
5 projects · most recent 07/20/2026
Air Conditioning Systems Ventilation Systems Heating Systems Cooling Towers Generators
FiledStatusContractorScopeMake / Model / Capacity
07/20/2026Permit IssuedTISHMAN CONSTRUCTION CORPAir Conditioning Systems, Cooling Towers, Heating Systems, Ventilation Systems
Cooling
Temtrol CUSTOM 23,500 CFM · Fan Coil Indoor ×17
Custom 23,500 CFM · Ahu ×2
York AMI-V17 266,100 BTU ×1
YORK AMI-V17 266,100 BTU ×2
ZJ150C00S4B5JCD2A2 140,000 BTU · Rooftop Unit ×1
KJ150C00R4BECCD5A1 140,000 BTU · Chiller ×2
XTO-33X45 146,000 BTU ×2
Iec VBA4000595927 164,990 BTU · Fan Coil Indoor ×3
FXA1200595919 33,645 BTU ×4
HDY3000595911 148,215 BTU · Fan Coil Indoor ×4
VDY1600595916 31,015 CFM · Ahu ×4
FXA1200595918 33,645 BTU ×2
HDY06 266,100 BTU ×2
VBA3000595924 98,810 BTU ×2
Trane TRANE BCHE0-54 47,340 BTU · Chiller ×2
— KC150C00A2BLD 150,000 BTU · Condensing Unit ×2
Greenheck 25556871 2,250 CFM · Exhaust Fan ×2
Hitachi TIDH048B23S 47,340 BTU · Heat Pump Outdoor ×2
Ied HBD3000595920 86,090 BTU ×2
Heating
Sterling HS-84 43,600 BTU · Electric Heater ×66
Cooling Tower
Marley NC8414SQN 684,300 CFM · Cooling Tower ×3
Ventilation
Greenheck GJI-25 2,125 CFM · Exhaust Fan ×8
USF-18 5,250 CFM · Exhaust Fan ×4
CUBE-360 10,000 CFM · Exhaust Fan ×2
QEI-16 2,295 CFM · Exhaust Fan ×2
QEI-18 7,000 CFM · Exhaust Fan ×2
SEI-14-432-A 2,000 CFM · Exhaust Fan ×2
Temtrol CUSTOM 11,000 CFM · Exhaust Fan ×2
07/15/2026Permit IssuedTISHMAN CONSTRUCTION CORPAir Conditioning Systems, Ventilation Systems
Cooling
Trane BCVE120 134,210 BTU · Rooftop Unit ×6
TTR 138,280 BTU · Condensing Unit ×2
Iec FXA12 35,340 BTU ×4
Greenheck CUBE-140 2,750 CFM · Exhaust Fan ×2
Vertiv YORK AMI-V17 266,100 BTU · Crac Unit ×2
York AMI-V17 266,100 BTU ×2
Ventilation
Greenheck BSQ-100 1,800 CFM · Exhaust Fan ×2
QEI-15 2,500 CFM · Exhaust Fan ×2
QEI-20 5,500 CFM · Exhaust Fan ×2
07/02/2026Permit IssuedTISHMAN CONSTRUCTION CORPAir Conditioning Systems
Cooling
Iec FXA04 11,300 BTU · Fan Coil Indoor ×6
FXA12 36,000 BTU · Fan Coil Indoor ×3
International Enviro-Tec HDD40 91,300 BTU ×4
Vertiv MM40C 29,200 BTU ×4
DME044C 30,000 BTU · Crac Unit ×3
07/01/2026Permit IssuedTISHMAN CONSTRUCTION CORPGenerators
Generators
Preferred Utilities NA 2,000 kW · Generator ×1
Cummins 2000DQKAB 2,000 kW · Generator ×1
06/09/2026Permit IssuedTISHMAN CONSTRUCTION CORPAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Nortek ITF-DHRE37 18,000 CFM · Ahu ×6
ITF-DHRE14 6,800 CFM · Ahu ×2
Iec FXA12 36,000 BTU · Fan Coil Indoor ×4
Greenheck CSP-A3300-VG 1,500 CFM · Exhaust Fan ×2
Heating
Sterling HS-84 43,600 BTU · Unit Heater ×4
Ventilation
Greenheck CSP-A3300-VG 1,500 CFM · Exhaust Fan ×8
BSQ-140HP 1,350 CFM · Exhaust Fan ×4
BSQ-160HP 800 CFM · Exhaust Fan ×4
SQ-130HP-VG 1,000 CFM · Exhaust Fan ×2
SQ-160HP-VG 1,800 CFM · Exhaust Fan ×2
6 projects · most recent 07/02/2026
FiledStatusContractorScope
07/02/2026Permit IssuedRAEL AUTOMATIC SPR.CO INC1,927 heads, 6 outlets
06/09/2026Permit IssuedRAEL AUTOMATIC SPR.CO INC762 heads, 2 outlets
06/17/2025Permit IssuedRAEL AUTOMATIC SPR.CO INC—
06/17/2025Permit IssuedRAEL AUTOMATIC SPR.CO INC218 heads, 1 outlets
10/16/2023———
09/02/2022Permit IssuedRAEL AUTOMATIC SPR.CO INC—
5 projects · most recent 07/02/2026
Water/Sanitary Medical Gas Gas Storm
FiledStatusContractorScope
07/02/2026Permit IssuedCARDOZA PLUMBING WMBEMedical Gas, Water/Sanitary
06/09/2026Permit IssuedTRISTATE PLBG SVCS CORPWater/Sanitary
05/04/2026Permit IssuedPAR PLUMBING CO., INCGas, Medical Gas, Storm, Water/Sanitary
05/04/2026Permit IssuedPAR PLUMBING CO., INCGas, Medical Gas, Storm, Water/Sanitary
10/27/2021Signed-offPACE PLUMBING CORPWater/Sanitary
25 projects · most recent 06/02/2025
General Wiring Lighting
FiledStatusContractorScope
06/02/2025Permit IssuedE-J ELEC. INSTALLATION CO—
05/22/2025CompleteADCO ELEC'L CORPGeneral Wiring
04/18/2025Permit IssuedROBERT B SAMUELS, INCGeneral Wiring
12/02/2024Permit IssuedTRANSEL ELEV. & ELEC. INCGeneral Wiring
11/15/2024Permit IssuedTRANSEL ELEV. & ELEC. INCGeneral Wiring
11/05/2024Permit IssuedCORPORATE ELEC. GROUP INCGeneral Wiring
10/28/2024Permit IssuedADCO ELEC'L CORP—
10/15/2024Permit IssuedALLAN BRITEWAY ELECTRICALGeneral Wiring
10/07/2024Permit IssuedADCO ELEC'L CORPGeneral Wiring
09/19/2024Permit IssuedE-J ELEC. INSTALLATION CO1 meters, 1 new_meters
09/16/2024Permit IssuedCORPORATE ELEC. GROUP INC—
09/03/2024Permit IssuedFRED GELLER ELEC'L INC.General Wiring
04/04/2024Permit IssuedA.S.R. ELEC'L CONTR'G INCGeneral Wiring, Lighting
01/19/2024Permit IssuedA.S.R. ELEC'L CONTR'G INC1 meters, 1 new_meters
05/20/2023Permit IssuedADCO ELEC'L CORP—
2 projects · most recent 05/21/2024
Steel Concrete
FiledStatusContractorScope
05/21/2024Permit IssuedW5 GROUP LLC4 scope_items
11/04/2022Permit IssuedTISHMAN CONSTRUCTION CORPSteel, Concrete
3 projects · most recent 06/10/2025
Sidewalk Shed Scaffold Fence
FiledStatusContractorScope
06/10/2025Permit IssuedPLATFORM SOLUTIONS, INCSidewalk Shed
04/22/2025Permit IssuedPLATFORM SOLUTIONS, INCScaffold
09/26/2024Permit IssuedPLATFORM SOLUTIONS, INCFence
1 project · most recent 01/06/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
01/06/2026Signed-offPULLMAN SST INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 106
DateTypeResultReport
08/19/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
08/04/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/29/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/29/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/23/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/15/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/15/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
07/08/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/08/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/23/2026Pass-Final PL - UndergroundPassView ↗
06/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/22/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/22/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/19/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/16/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/14/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/27/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/27/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 106.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/09/2026Mechanical SystemsYoung Suhspecial
08/09/2026Duct leakage testing, insulation and designYoung Suhenergy_progress
08/09/2026FinalYoung Suhprogress
08/09/2026Energy Code Compliance InspectionsYoung Suhprogress
08/09/2026Post-installed AnchorsYoung Suhspecial
08/09/2026Shutoff dampersYoung Suhenergy_progress
08/09/2026HVAC-R and service water piping design and insulationYoung Suhenergy_progress
07/27/2026FinalYoung Suhprogress
07/27/2026Post-installed AnchorsYoung Suhspecial
07/27/2026Emergency and Standby Power Systems (Generator)Young Suhspecial
07/27/2026Mechanical SystemsYoung Suhspecial
07/24/2026Post-installed AnchorsYoung Suhspecial
07/24/2026Interior lighting powerYoung Suhenergy_progress
07/24/2026HVAC-R and service water piping design and insulationYoung Suhenergy_progress
07/24/2026Ventilation and air distribution systemYoung Suhenergy_progress
07/24/2026HVAC-R and service water heating system controlsYoung Suhenergy_progress
07/24/2026Duct leakage testing, insulation and designYoung Suhenergy_progress
07/24/2026Shutoff dampersYoung Suhenergy_progress
07/24/2026Electrical motors and elevatorsYoung Suhenergy_progress
07/24/2026HVAC-R and service water heating equipmentYoung Suhenergy_progress
07/24/2026Lighting controlsYoung Suhenergy_progress
07/24/2026FinalYoung Suhprogress
07/24/2026Energy Code Compliance InspectionsYoung Suhprogress
07/24/2026Mechanical SystemsYoung Suhspecial
07/15/2026Maintenance informationYoung Suhenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NYU Langone Orthopedic CenterMedical / HealthcareCellar, Floors 1–13, Mezzanine, Penthouse, Roof
Project M01141114 Alteration · Permit Entire · 01/08/2025
Project M00944364 Alteration · Permit Entire · 10/07/2023
Project M08025728 Alteration CO · Permit Entire · 11/28/2022
Project M08028441 Alteration · Objections · 11/05/2022
Project M08029624 Alteration · Permit Entire · 11/05/2022
Project M08026777 Alteration · Permit Entire · 11/04/2022
Project M08027276 Alteration · Permit Entire · 11/04/2022
Project M08027495 Alteration · Permit Entire · 11/04/2022
Project M08027823 Alteration · Permit Entire · 11/04/2022
Project M08029627 Alteration · Permit Entire · 11/04/2022
Project M08030098 Alteration · Permit Entire · 11/04/2022
Project M08022284 Alteration · Permit Entire · 11/03/2022
NYU Langone Medical CenterMedical / HealthcareCellar
Project M00333337 Alteration · LOC Issued · 04/27/2020
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 1,877 on file (BIS + DOB NOW)
▸Plans & Drawings159
▸DOB NOWPlans/Sketch150
09/06/2026M00022078-I1Request digital key ↗
09/06/2026M00029271-I1Request digital key ↗
09/06/2026M00029264-I1Request digital key ↗
Showing 3 of 150 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
09/04/2026M00377928-P1Request digital key ↗
09/04/2026M00377928-I1Request digital key ↗
09/04/2026M00437685-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Antenna1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00333294-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00437675-I1Request digital key ↗
▸Applications & Permits253
▸BISPLAN / WORK APPROVAL APPLICATION151
02/01/2023141022266Open ↗
07/28/2021120483921Open ↗
04/23/2021122437103Open ↗
Showing 3 of 151 on file for this type
▸BISWORK PERMIT APPLICATION101
02/03/2023141022266Open ↗
02/01/2021140988028Open ↗
Showing 2 of 101 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram7
09/01/2026M08025728-P2Open ↗
09/01/2026M08025728-P1Open ↗
Showing 2 of 7 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/26/2022110360038Open ↗
▸Seals & Professional Certifications522
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION185
04/29/2020110292497Open ↗
04/29/2020110292497Open ↗
04/29/2020110292497Open ↗
Showing 3 of 185 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature152
09/06/2026M00045585-I1Open ↗
09/05/2026M00231189-I1Open ↗
09/04/2026M00377928-I1Open ↗
Showing 3 of 152 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature62
09/23/2026M08027830-I1Open ↗
09/21/2026M08027823-I1Open ↗
09/02/2026M08028271-I1Open ↗
Showing 3 of 62 on file for this type
▸DOB NOWProgress Inspector Seal & Signature58
09/02/2026M08028271-I1Open ↗
09/02/2026M08028271-P1Open ↗
09/01/2026M08030098-I1Open ↗
Showing 3 of 58 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
02/01/2023141022266Open ↗
01/11/2021140988028Open ↗
Showing 2 of 13 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
02/01/2023141022266Open ↗
01/11/2021140988028Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
02/01/2023141022266Open ↗
01/11/2021140988028Open ↗
Showing 2 of 5 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment89
▸BISEQUIPMENT USE PERMITS18
01/26/2022110360038Open ↗
11/10/2020122844413Open ↗
04/29/2020110292497Open ↗
Showing 3 of 18 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE17
11/18/2019122844413Open ↗
10/22/2019122844413Open ↗
10/15/2019122844413Open ↗
Showing 3 of 17 on file for this type
▸BISSELF-CERT PLUMBING NOTICE13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING11
07/28/2021120483921Open ↗
Showing 1 of 11 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA10
07/06/2021123514722Open ↗
02/27/2021122797704Open ↗
Showing 2 of 10 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT10
11/17/2020122844413Open ↗
11/10/2020122844413Open ↗
04/29/2020110292497Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISWATER METER PERMIT : DEP-METER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFDNY: Letter of No Objection1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection16
▸BISTenant Protection Plan and Notes5
11/20/2019122891576Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWStreet Tree Checklist5
09/01/2026M08030052-P1Open ↗
09/01/2026M08025728-P2Open ↗
09/01/2026M08025728-P1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE SIGNOFF1
01/26/2022110360038Open ↗
▸Environmental & Asbestos91
▸BISASBESTOS: CERTIFICATION (DEP ACP5)26
01/11/2021140988028Open ↗
12/24/2019122844413Open ↗
12/17/2019122844413Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report24
09/06/2026M00045585-I1Open ↗
09/04/2026M00377928-I1Open ↗
09/04/2026M00377928-P1Open ↗
Showing 3 of 24 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form10
09/02/2026M00570940-I1Open ↗
Showing 1 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance69
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS43
01/10/2020122844413Open ↗
01/10/2020122844413Open ↗
01/10/2020122844413Open ↗
Showing 3 of 43 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
06/15/2021140988028Open ↗
10/13/2020122844413Open ↗
06/12/2020122437256Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
11/10/2020122844413Open ↗
10/13/2020122844413Open ↗
06/12/2020122437256Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
01/11/2021140988028Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY14
01/11/2024141022266Open ↗
01/11/2024141022266Open ↗
01/08/2024141022266Open ↗
Showing 3 of 14 on file for this type
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs312
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter142
09/04/2026M00377928-P1Open ↗
09/03/2026M00333337-I1Open ↗
09/03/2026M00333337-P1Open ↗
Showing 3 of 142 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST93
01/11/2024141022266Open ↗
08/24/2021120483921Open ↗
07/23/2021123514722Open ↗
Showing 3 of 93 on file for this type
▸DOB NOWDEP Variance (V5) letter31
09/02/2026M00570940-I1Open ↗
09/02/2026M00767025-I1Open ↗
09/01/2026M08030278-I1Open ↗
Showing 3 of 31 on file for this type
▸BISADMINISTRATIVE OBJECTIONS28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership129
▸BISCOST AFFIDAVIT120
02/01/2023141022266Open ↗
08/24/2021120483921Open ↗
06/15/2021140988028Open ↗
Showing 3 of 120 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
01/08/2024141022266Open ↗
01/26/2022110360038Open ↗
03/02/2021122797704Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms157
▸BISEFILING COVER SHEET65
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 65 on file for this type
▸BISBOROUGH INTAKE FORM57
04/29/2020110292497Open ↗
04/27/2020110360038Open ↗
04/13/2020110360038Open ↗
Showing 3 of 57 on file for this type
▸BISADDITIONAL INFORMATION28
01/22/2021122437103Open ↗
01/11/2021122437103Open ↗
Showing 2 of 28 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
02/01/2023141022266Open ↗
01/11/2021140988028Open ↗
Showing 2 of 7 on file for this type
▸Other Documents47
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWSite Survey: Initial7
09/01/2026M08025728-P1Open ↗
09/01/2026M08025728-P2Open ↗
Showing 2 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
09/01/2026M08025728-P1Open ↗
09/01/2026M08025728-P2Open ↗
Showing 2 of 7 on file for this type
▸DOB NOWPlot Diagram7
09/01/2026M08025728-P1Open ↗
09/01/2026M08025728-P2Open ↗
Showing 2 of 7 on file for this type
▸DOB NOWProperty Ownership Certification5
09/01/2026M08030052-P1Open ↗
09/01/2026M08025728-P1Open ↗
09/01/2026M08025728-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWCalculations4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWManufacturer's Specifications4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFEE EXEMPTION DOCUMENTATION2
02/01/2023141022266Open ↗
Showing 1 of 2 on file for this type
▸BISVIOLATIONS SEARCH1
01/26/2022110360038Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type