ECB08/04/2026Reissue#35721047P failure to maintain building in code-compliant manner.noted:in the 3RD floor gym,there are vertical cracks in the block walls at several locations.rem:repair/replace.Nothing owed — awaiting certificate of correction
ECB09/10/2025Re-issue #35688877M. Failure to maintain building in code-compliant manner. Noted: the gym at 3RD floor has vertical cracks at several locations of the walls. Remedy: repair/replace.Nothing owed — awaiting certificate of correction
ECB09/17/2024Reissue #35674868N. Failure to maintain building in code-compliant manner. Noted: AT3RD floor. Gym have vertical cracks at wall at numerous locations. Remedy: make necessary repairs.Nothing owed — awaiting certificate of correction
ECB04/18/2023Reissue#335655131P failure to maintain building in code-compliant manner. At time of my i oberserved that at 3RD floor gym have vertical cracks 'n masonry wall above windows violation #35655131P issued 05/19/20Nothing owed — awaiting certificate of correction
ECB05/18/2022Reissue#35560993R date:05.03.2021 failure to maintain building in codecompliant manner at the time of inspection i observed that and note 3RD floor gym vertical cracks in masonry walls above windows & padded waNothing owed — awaiting certificate of correction
ECB05/03/2021Reissue 35495943K failure to maintain bldg in code compliant manner note at 3RD fl gym vertical cracks in masonry walls above windows & padded walls.remedy: repair and/or replaceNothing owed — awaiting certificate of correction
ECB06/02/2020Reissue#35422247J failure to maintain building inc ode compliant manner noet at 3RD floor gym vertical cracks in masonry walls above windows and padded walls repair and or replaceNothing owed — awaiting certificate of correction
ECB05/02/2019Reissue #35322511L date of issue 03.12.18. Failure to maintain building in code-compliant manner at 3RD floor gym vertical cracks in masonry wall throughout. Rmdy: repair and/or replace.Nothing owed — awaiting certificate of correction
ECB03/12/2018Reissue #35252774M. Failure to maintain building in code-compliant manner. At 3RD floor gym, vertical cracks in masonry wall throughout. Rem: repair/replace.Nothing owed — awaiting certificate of correction
ECB04/21/2017Failure to maintain bldg in code-compliant manner. Noted: @ 3RD flr, gym area, vertical cracked masonry in the wall @ various places. Rem: comply w/ code/repair the wall.Nothing owed — awaiting certificate of correction
Likely answered · the city's own records show a filing, but DOB's feed still lists these as active
DOB04/25/2023Violation issued-failure to file 2022 external low pressure inspectionThe owner has filed since: boiler inspection reports are on file for later years (latest 2026). This one is not shown as answered2 identical filings