← Back
BuildNYC
Two family brick
333 HOYT STREET
BROOKLYN · BIN 3007454
💬 Discuss this project
1869Year Built
2Stories
B1Building Class
R6BZoning
2,400 sfGross Floor Area
2Units
Two family brick · 1,360 sf lot · 1.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof18p · 1 filing · 20 docs
Floor 3Floor framing structural work7p · 1 filing · 20 docs
Floor 2Floor framing structural work25p · 2 filings · 20 docs
Floor 1Floor framing structural work25p · 2 filings · 20 docs
CellarFloor framing structural work26p · 3 filings · 20 docs
Basement2p · 1 filing · 20 docs
Sub-Basement16p · 1 filing · 20 docs
Site & exteriorFloor framing structural work7p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/07/2024$4.6M—HER FATHER DREAMS LLC → Private party$1,917/sf building
06/07/2024$4.6M—HER FATHER DREAMS LLC → Private party$1,917/sf building
06/12/2019$2.1M—Private party → HER FATHER DREAMS LLC$892/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EP Engineering506/26/2023
Celin Munoz Consulting Engineering310/12/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Pentinco Group NYCGeneral Contractor607/08/2026
Amer-A-Pipe Plumbing & HeatingPlumbing607/08/2026
Millenium Restorationspecialty_contractor203/22/2026
Empire Lic Electrical ContractorsElectrical103/22/2026
Gotham Wiring LicensedElectrical103/22/2026
Empire Lic Electrical ContractorsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Architectural Engineering6111506/26/2023
Celin Munoz Consulting EN1064610/12/2021
Building Lifecycle
05/09/2024
Signed off — Alteration
PROPOSED PL WORK INCLUDES,BUT NOT LIMITED TO,NEW PL FIX THROUGHOUT, RUN NEW WATER, GAS, VENT AND DRAIN LINES FROM CEL,001-002,ROF AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00523217-I1
08/29/2023
Signed off — Alteration
STR WORK INCLUDES,BUT NOT LIMITED TO, CONCRETE WORK IN CEL ON GRADE.STEEL BEAM FRAMING FROM CEL,001-003.EX FRAMING TO BE SISTERED W. NEW JOISTS .NEW CMU'S AS PER PLANS AND REPOINT AND REPAIR EXISTING REAR MASONRY WALLS.NO CHANGE IN USE, EGRESS OR OCC.
B00511318-I1
08/29/2023
Signed off — Alteration
B00521668-I1
06/26/2023
Filed — Alteration
PROPOSED PL WORK INCLUDES,BUT NOT LIMITED TO,NEW PL FIX THROUGHOUT, RUN NEW WATER, GAS, VENT AND DRAIN LINES FROM CEL,001-002,ROF AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00523217-P4
06/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
William Shoard
51 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAmer-A-Pipe Plumbing & Heating07/14/2022
DOB NOWStructuralSigned-offPentinco Group NYC11/04/2021
DOB NOWFoundationSigned-offPentinco Group NYC11/04/2021
DOB NOWStructuralSigned-offPentinco Group NYC10/14/2021
DOB NOWFoundationSigned-offPentinco Group NYC08/24/2021
DOB NOWPlumbingSigned-offAmer-A-Pipe Plumbing & Heating07/28/2021
BISOTISSUEDMea Construction01/13/2023
BISOTISSUEDMea Construction10/25/2021
BISOTISSUEDMea Construction04/22/2021
2 projects · most recent 03/11/2024
General Wiring
FiledStatusContractorScope
03/11/2024CompleteEmpire Lic Electrical ContractorsGeneral Wiring
02/18/2021CompleteGotham Wiring LicensedGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/30/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/30/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/30/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
06/26/2023HVAC-R and service water piping design and insulationWilliam Shoardenergy_progress
06/26/2023HVAC-R and service water heating equipmentWilliam Shoardenergy_progress
06/26/2023Maintenance informationWilliam Shoardenergy_progress
06/26/2023Fire-Resistant Penetrations and JointsWilliam Shoardspecial
06/26/2023HVAC-R and service water heating system controlsWilliam Shoardenergy_progress
05/09/2023HVAC-R and service water heating equipmentWilliam Shoardenergy_progress
05/09/2023Maintenance informationWilliam Shoardenergy_progress
05/09/2023Fire-Resistant Penetrations and JointsWilliam Shoardspecial
05/09/2023HVAC-R and service water piping design and insulationWilliam Shoardenergy_progress
05/09/2023HVAC-R and service water heating system controlsWilliam Shoardenergy_progress
03/07/2023HVAC-R and service water piping design and insulationWilliam Shoardenergy_progress
03/07/2023HVAC-R and service water heating equipmentWilliam Shoardenergy_progress
03/07/2023HVAC-R and service water heating system controlsWilliam Shoardenergy_progress
03/07/2023Maintenance informationWilliam Shoardenergy_progress
03/07/2023Fire-Resistant Penetrations and JointsWilliam Shoardspecial
10/13/2021Structural Cold-Formed SteelCelin Munozspecial
10/13/2021MasonryCelin Munozspecial
10/13/2021Concrete - Cast-In-PlaceCelin Munozspecial
10/13/2021Structural Stability – Alterations of existing buildingsCelin Munozspecial
10/13/2021Structural Steel - WeldingCelin Munozspecial
10/13/2021Structural Steel - High Strength BoltingCelin Munozspecial
10/13/2021Structural Steel - DetailsCelin Munozspecial
10/13/2021FinalCelin Munozprogress
10/08/2021Concrete - Cast-In-PlaceCelin Munozspecial
10/08/2021Structural Steel - High Strength BoltingCelin Munozspecial
Latest 25 of 36.
83 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account