← Back
One family attached or semi-detached
333 PENNYFIELD AVENUE
BRONX · Throgs Neck-Schuylerville · BIN 2078721
💬 Discuss this project
1965Year Built
2Stories
A5Building Class
R3-1Zoning
1,188 sfGross Floor Area
1Units
One family attached or semi-detached · 2,434 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Roof2p · 1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREEN RIVER ENVIRONMENTAL ENGINEERI212/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NY State Solar LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYSS LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN RIVER ENVIRONMENTAL7841212/22/2025
Building Lifecycle
All (8)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (4)
01/06/2026
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
X01233866-I1
12/22/2025
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
X01233866-P1
07/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
07/29/2025
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
07/29/2025
Special inspection requirement — Final
ROBERT MASONE
07/29/2025
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
06/03/2025
Permit issued — Solar
X01233866-I1-SL
05/30/2025
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
X01233866-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS LLC06/03/2025
2 projects · most recent 09/18/2025
General Wiring
FiledStatusContractorScope
09/18/2025Permit IssuedEMPIRE LIC ELECL CONTRSGeneral Wiring
07/03/2025CompleteNY SOLAR ELECTRICAL LLC—
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
07/29/2025Fire-Resistant Penetrations and JointsROBERT MASONEspecial
07/29/2025Energy Code Compliance InspectionsROBERT MASONEprogress
07/29/2025FinalROBERT MASONEprogress
07/29/2025Air barrier - visual inspectionROBERT MASONEenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026X01233866-P1Request digital key ↗
08/19/2026X01233866-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026X01233866-I1Open ↗
08/13/2026X01233866-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026X01233866-P1Open ↗
08/26/2026X01233866-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026X01233866-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026X01233866-I1Open ↗
08/13/2026X01233866-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01233866-I1Open ↗