0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
StructuralPlumbingFire Protection
Roof3p · 3 filings · 16 docs
Floor 41p · 1 filing · 3 docs
Floor 33p · 3 filings · 16 docs
Floor 21p · 1 filing · 3 docs
Floor 12p · 2 filings · 9 docs
Cellar1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP807/08/2026
TOWER2307/08/2026
B CONTRACTORS GROUP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION603/21/2026
ADVANCED BUILDERS SERVICES403/21/2026
ATLANTIC BUILDING SUPPLY INC.403/21/2026
Z ARCHITECTURE603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
B CONTRACTORS GROUP LLCGeneral Contractor2107/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor407/08/2026
PRIME PIPING & HEATING INPlumbing407/08/2026
PRIME PIPING HEATING INPlumbing203/22/2026
PRIME PIPING & HEATING INFire Protection207/08/2026
AMOK INCPlumbing107/08/2026
AMOK INCFire Protection107/08/2026
ALEXANDER ZHITNIKElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.394610/03/2022
Building Lifecycle
All (70)Filed (12)Permit Issued (17)Signed Off (7)Violation (1)Inspection (2)Objection (8)Special Inspection (23)
02/28/2023
Signed off — Alteration
sprinkler application filed in conjunction with NB application
B00396958-I1
02/28/2023
Signed off — Alteration
Plumbing system for new 4 story building
B00396925-I1
02/21/2023
Signed off — Alteration
PROPOSED MECHANICAL DESIGN FOR NEW 4 STORY , 4 APARTMENTS BUILDING IN CONJUNCTION WITH NB APPLICATION 321594878
B00215433-I1
02/10/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/08/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
02/02/2023
Special inspection requirement — Sprinkler Systems
Paul Raymond
02/02/2023
Special inspection requirement — Post-installed Anchors
Paul Raymond
01/31/2023
Signed off — Alteration
B00214785-I1
01/26/2023
Objection resolved — Addressed
01/12/2023
Signed off — Alteration
B00294357-I1
01/06/2023
Objection resolved — Addressed
12/27/2022
Objection resolved — Addressed
12/12/2022
Signed off — Alteration
B00431151-I1
12/12/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00431170-I1
12/06/2022
Objection raised — Structural
12/06/2022
Objection raised — Mechanical
12/06/2022
Objection raised — Fire_Protection
10/03/2022
Filed — Alteration
sprinkler application filed in conjunction with NB application
B00396958-P1
09/29/2022
Permit issued — Structural
B00214785-I1-ST
09/25/2022
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
09/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
09/22/2022
Objection resolved — Addressed
09/16/2022
Objection raised — Scope
09/14/2022
Filed — Alteration
Plumbing system for new 4 story building
B00396925-P1
07/26/2022
Permit issued — Mechanical Systems
B00215433-I1-MS
06/28/2022
Permit issued — Plumbing
B00396925-I1-PL
06/28/2022
Permit issued — Sprinklers
B00396958-I1-EW-SP
06/01/2022
Permit issued — Construction Fence
B00294357-I1-FN
12/02/2021
Permit issued — Supported Scaffold
B00431170-I1-SF
12/02/2021
Permit issued — Sidewalk Shed
B00431151-I1-SH
09/22/2021
Violation issued (ECB, closed)
Construction
08/17/2021
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00431170-P1
06/30/2021
Permit issued — Plumbing
B00396925-I1-PL
06/30/2021
Permit issued — Sprinklers
B00396958-I1-EW-SP
06/08/2021
Permit issued — Construction Fence
B00294357-I1-FN
05/11/2021
Permit issued — Sprinklers
B00396958-I1-EW-SP
01/15/2021
Permit issued — Plumbing
B00396925-I1-PL
12/09/2020
Permit issued — Sidewalk Shed
B00431151-I1-SH
12/08/2020
Permit issued — Supported Scaffold
B00431170-I1-SF
12/07/2020
Filed — Alteration
B00431151-I1
12/07/2020
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00431170-I1
11/16/2020
Permit issued — Construction Fence
B00294357-I1-FN
11/13/2020
Special inspection requirement — HVAC and service water heating equipment
Paul Raymond
11/13/2020
Special inspection requirement — Electrical energy consumption
Paul Raymond
11/13/2020
Special inspection requirement — HVAC insulation and sealing
Paul Raymond
11/13/2020
Special inspection requirement — Electrical motors
Paul Raymond
11/13/2020
Special inspection requirement — HVAC and service water heating system controls
Paul Raymond
11/13/2020
Special inspection requirement — Maintenance information
Paul Raymond
11/13/2020
Special inspection requirement — Final
Paul Raymond
11/13/2020
Special inspection requirement — Mechanical Systems
Paul Raymond
11/13/2020
Special inspection requirement — Shutoff dampers
Paul Raymond
11/11/2020
Filed — Alteration
PROPOSED MECHANICAL DESIGN FOR NEW 4 STORY , 4 APARTMENTS BUILDING IN CONJUNCTION WITH NB APPLICATION 321594878
B00215433-P1
09/22/2020
Filed — Alteration
B00214785-I1
09/16/2020
Special inspection requirement — Electrical energy consumption
09/16/2020
Special inspection requirement — HVAC and service water heating equipment
09/16/2020
Special inspection requirement — HVAC insulation and sealing
09/16/2020
Special inspection requirement — Electrical motors
09/16/2020
Special inspection requirement — Maintenance information
09/16/2020
Special inspection requirement — HVAC and service water heating system controls
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offB CONTRACTORS GROUP LLC09/29/2022
DOB NOWMechanical SystemsSigned-offB CONTRACTORS GROUP LLC07/26/2022
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN06/28/2022
DOB NOWSprinklersSigned-offA M B MECHANICAL INC06/28/2022
DOB NOWConstruction FenceSigned-offB CONTRACTORS GROUP LLC06/01/2022
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC12/02/2021
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC12/02/2021
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN06/30/2021
DOB NOWSprinklersSigned-offA M B MECHANICAL INC06/30/2021
DOB NOWConstruction FenceSigned-offB CONTRACTORS GROUP LLC06/08/2021
DOB NOWSprinklersSigned-offAMOK INC05/11/2021
DOB NOWPlumbingSigned-offAMOK INC01/15/2021
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC12/09/2020
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC12/08/2020
DOB NOWConstruction FenceSigned-offB CONTRACTORS GROUP LLC11/16/2020
DOB NOWConstruction FenceSigned-offB CONTRACTORS GROUP LLC06/25/2020
DOB NOWConstruction FenceSigned-offB CONTRACTORS GROUP LLC03/24/2020
BIS—ISSUEDB CONTRACTORS GROUP LLC06/02/2022
BIS—ISSUEDB CONTRACTORS GROUP LLC11/10/2020
BIS—ISSUEDB CONTRACTORS GROUP LLC08/31/2020
BIS—ISSUEDB CONTRACTORS GROUP LLC08/14/2020
2 projects · most recent 02/18/2023
General Wiring
FiledStatusContractorScope
02/18/2023CompleteFRIED ELECTRIC CO.General Wiring
12/03/2020CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/10/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/08/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
02/02/2023Fire-Resistant Penetrations and JointsPaul Raymondspecial
02/02/2023Sprinkler SystemsPaul Raymondspecial
02/02/2023Post-installed AnchorsPaul Raymondspecial
09/25/2022Energy Code Compliance InspectionsPaul Raymondprogress
09/25/2022Fire-Resistant Penetrations and JointsPaul Raymondspecial
11/13/2020HVAC and service water heating equipment Paul Raymondenergy_progress
11/13/2020Electrical energy consumptionPaul Raymondenergy_progress
11/13/2020HVAC insulation and sealing Paul Raymondenergy_progress
11/13/2020Electrical motorsPaul Raymondenergy_progress
11/13/2020HVAC and service water heating system controls Paul Raymondenergy_progress
11/13/2020Maintenance informationPaul Raymondenergy_progress
11/13/2020FinalPaul Raymondprogress
11/13/2020Mechanical SystemsPaul Raymondspecial
11/13/2020Shutoff dampersPaul Raymondenergy_progress
09/16/2020Electrical energy consumption—energy_progress
09/16/2020HVAC and service water heating equipment —energy_progress
09/16/2020HVAC insulation and sealing —energy_progress
09/16/2020Electrical motors—energy_progress
09/16/2020Maintenance information—energy_progress
09/16/2020HVAC and service water heating system controls —energy_progress
09/16/2020Shutoff dampers—energy_progress
09/16/2020Mechanical Systems—special
09/16/2020Final—progress
▾Documents — 235 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026B00396958-I1Request digital key ↗
08/14/2026B00396958-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
09/02/2026B00294357-I1Request digital key ↗
08/15/2026B00294357-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/02/2026B00431170-I1Request digital key ↗
08/15/2026B00431170-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00396925-I1Request digital key ↗
08/14/2026B00396925-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00215433-I1Request digital key ↗
08/15/2026B00215433-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00431151-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00214785-I1Request digital key ↗
▸Applications & Permits55
▸BISPLAN / WORK APPROVAL APPLICATION36
03/22/2023321594878Open ↗
03/07/2023321594878Open ↗
08/23/2022321594878Open ↗
Showing 3 of 36 on file for this type
▸BISWORK PERMIT APPLICATION14
01/22/2021321594878Open ↗
01/22/2021321594878Open ↗
11/12/2020321594878Open ↗
Showing 3 of 14 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation4
02/19/2021322021940Open ↗
01/07/2020322021940Open ↗
05/28/2019340658960Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/29/2022321594878Open ↗
▸Zoning, Tax Lot & Property Records18
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED4
07/22/2022322108811Open ↗
01/23/2020321594878Open ↗
01/03/2020321594878Open ↗
Showing 3 of 4 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION3
07/22/2022322108811Open ↗
01/03/2020321594878Open ↗
06/21/2019321384355Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED3
01/23/2020321594878Open ↗
01/03/2020321594878Open ↗
05/29/2019321384355Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT3
07/22/2022322108811Open ↗
01/03/2020321594878Open ↗
05/29/2019321384355Open ↗
▸BISZONING DIAGRAM2
02/14/2020321594878Open ↗
01/23/2020321594878Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
10/23/2020321594878Open ↗
▸BISVERIFY TAX LOT1
11/22/2022321594878Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/06/2023321594878Open ↗
▸Seals & Professional Certifications34
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/02/2026B00431151-I1Open ↗
09/02/2026B00431170-I1Open ↗
09/02/2026B00431170-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/30/2026B00396925-I1Open ↗
08/24/2026B00215433-I1Open ↗
08/24/2026B00215433-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/30/2026B00396925-I1Open ↗
08/24/2026B00215433-I1Open ↗
08/22/2026B00396958-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
09/28/2020321594878Open ↗
09/28/2020321594878Open ↗
09/28/2020321594878Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/26/2018340646634Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/31/2019340658960Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/26/2018340646634Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/26/2018340646634Open ↗
▸Trade Schedules & Equipment5
▸BIS* SEWER CONNECTION: DEP SD1 & SD22
01/23/2020321594878Open ↗
05/29/2019321384355Open ↗
▸BISSCHEDULE B - PLUMBING1
12/26/2018340646634Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
02/27/2023321594878Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
02/27/2023321594878Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST5
02/08/2021322021940Open ↗
12/08/2020321594878Open ↗
02/22/2020321594878Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREES SITE PLAN2
02/08/2021322021940Open ↗
05/14/2019340658960Open ↗
▸BISSTREET TREE SIGNOFF1
09/01/2022321594878Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
08/13/2020321594878Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
02/27/2023321594878Open ↗
08/13/2020321594878Open ↗
01/23/2020321594878Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
09/28/2020321594878Open ↗
09/28/2020321594878Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/26/2018340646634Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/27/2023321594878Open ↗
▸Inspections & Test Reports28
▸BISTECHNICAL REPORT: RESPONSIBILITY15
03/01/2023321594878Open ↗
03/01/2023321594878Open ↗
02/27/2023321594878Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
03/27/2023321594878Open ↗
09/28/2020321594878Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS2
12/26/2018340646634Open ↗
10/01/2018321384355Open ↗
▸BISHYDRO FLOW TEST LETTER2
05/29/2019321384355Open ↗
12/26/2018340646634Open ↗
▸BISSOIL REPORT2
01/23/2020321594878Open ↗
10/01/2018321384355Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
08/13/2020321594878Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
08/13/2020321594878Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
09/28/2020321594878Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
03/27/2023321594878Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
08/13/2020321594878Open ↗
▸Approvals, Objections & Sign-offs19
▸BISSCHEDULE A - OCCUPANCY / USE12
03/22/2023321594878Open ↗
08/23/2022321594878Open ↗
08/19/2022321594878Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
07/29/2022321594878Open ↗
06/28/2022322108811Open ↗
06/28/2022322108811Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
02/13/2023322021940Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE2
11/12/2020321594878Open ↗
10/26/2020321594878Open ↗
▸BISCOST AFFIDAVIT2
02/27/2019321907905Open ↗
12/26/2018340646634Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
09/28/2020321594878Open ↗
▸Filing & Intake Forms31
▸BISADDITIONAL INFORMATION15
03/27/2023321594878Open ↗
03/27/2023321594878Open ↗
03/22/2023321594878Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING COVER SHEET6
07/09/2022322108811Open ↗
01/07/2020322021940Open ↗
01/02/2020321594878Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM5
01/19/2021340658960Open ↗
01/19/2021340658960Open ↗
08/15/2019321907905Open ↗
Showing 3 of 5 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT33
02/19/2021322021940Open ↗
01/07/2020322021940Open ↗
05/22/2019340658960Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
01/31/2019340658960Open ↗
12/26/2018340646634Open ↗
▸Other Documents11
▸BISBPP - SUPPORTING DOCUMENTATION5
02/19/2021322021940Open ↗
02/19/2021322021940Open ↗
02/08/2021322021940Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM3
06/28/2022322108811Open ↗
01/03/2020321594878Open ↗
10/02/2018321384355Open ↗
▸BISRP-6021
05/29/2019321384355Open ↗
▸BISPD-11
05/29/2019321384355Open ↗
▸BISPARKS DEPT PAYMENT OF ONE OFF SITE TREE1
03/27/2023321594878Open ↗