← Back
Public elementary, junior or senior high
P.S. 1
334 46 STREET · BIN 3011821
💬 Discuss this project
1964Year Built
3Stories
W1Building Class
R6BZoning
118,146 sfGross Floor Area
1Units
LL97 Covered6 Open Violations 0 unresolved · 6 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 58,100 sf lot · 2.03 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction20p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 3Under Construction24p · 2 filings · 20 docs
Floor 2Under Construction23p · 2 filings · 20 docs
Floor 1Under Construction24p · 2 filings · 20 docs
CellarUnder Construction25p · 2 filings · 20 docs
3 jobs · most recent 10/30/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/30/2025Permit IssuedEON MECHANICAL INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Lg ×2
Heating
Lg ×2
Ventilation
Greenheck SQ100 135 CFM · Exhaust Fan ×2
04/05/2023——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Lg ×1
Heating
Lg ×1
Ventilation
03/15/2023——Air Conditioning Systems
Cooling
Fujitsu AOU48RGLX 53,000 BTU · Heat Pump Outdoor ×3
1 job · most recent 10/30/2025
FiledStatusContractorScope
10/30/2025——187 heads
2 jobs · most recent 01/13/2026
Storm Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
01/13/2026——Storm
10/30/2025Permit IssuedMAR-SAL PLBG & HTG, INCPlumbing-Sprinkler, Water/Sanitary
13 jobs · most recent 05/27/2026
General Wiring
FiledStatusContractorScope
05/27/2026CompleteCHARAN ELEC'L ENTERP'S IN—
03/27/2026Permit IssuedG & F.A.ST ELECTRIC INC—
02/17/2026Permit IssuedG & F.A.ST ELECTRIC INC—
07/18/2022CompleteCHARAN ELEC'L ENTERP'S IN—
06/09/2021Permit IssuedCHARAN ELEC'L ENTERP'S INGeneral Wiring
09/14/2020CompleteCHARAN ELEC'L ENTERP'S IN—
06/18/2020CompleteHIGH VOLT ELEC CORP. OFGeneral Wiring
08/15/2019CompleteMAINSTREAM ELECTRIC, INC.General Wiring
08/14/2019CompleteJ&H ELECTRICAL CONT INCGeneral Wiring
06/25/2018CompleteCHARAN ELEC'L ENTERP'S IN—
06/22/2018CompleteAM NY ELECTRIC CORPGeneral Wiring
04/20/2018CompleteCHARAN ELEC'L ENTERP'S IN—
04/16/2018CompleteSAMCO ELECTRIC CORP.—
3 jobs · most recent 10/30/2025
FiledStatusContractorScope
10/30/2025Permit IssuedEON MECHANICAL INC1 scope_items
10/23/2025Permit IssuedZARCO CONTRACTING INC1 scope_items
02/08/2023——1 scope_items
Building Lifecycle
All (178)Filed (28)Permit Issued (15)Signed Off (4)Violation (60)Inspection (3)Objection (38)Special Inspection (30)
08/04/2026
Permit issued — Mechanical Systems
B00854243-S2-MS
07/06/2026
Permit issued — Plumbing
B00854243-S3-PL
07/02/2026
Permit issued — Foundation
B00854243-S5-FO
07/02/2026
Permit issued — General Construction
B00854243-I1-GC
07/02/2026
Permit issued — Structural
B00854243-S1-ST
06/16/2026
Violation issued (ECB, open)
Construction
06/16/2026
Violation issued (ECB, open)
Construction
03/23/2026
Permit issued — Support of Excavation
B01288987-I1-SE
03/09/2026
Special inspection requirement — Masonry
MAXIM KORNGOLD
03/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAXIM KORNGOLD
03/09/2026
Special inspection requirement — Fenestration air leakage
MAXIM KORNGOLD
03/09/2026
Special inspection requirement — Sprayed fire-resistant materials
MAXIM KORNGOLD
03/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAXIM KORNGOLD
03/09/2026
Special inspection requirement — Energy Code Compliance Inspections
MAXIM KORNGOLD
03/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
MAXIM KORNGOLD
03/09/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MAXIM KORNGOLD
03/09/2026
Special inspection requirement — Insulation placement and R values
MAXIM KORNGOLD
03/09/2026
Special inspection requirement — Air barrier - visual inspection
MAXIM KORNGOLD
03/02/2026
Objection resolved — Addressed
02/23/2026
Special inspection requirement — Insulation placement and R values
Hakeem Alshawabkeh
02/23/2026
Special inspection requirement — Masonry
Hakeem Alshawabkeh
02/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Hakeem Alshawabkeh
02/23/2026
Special inspection requirement — Energy Code Compliance Inspections
Hakeem Alshawabkeh
02/23/2026
Special inspection requirement — Post-installed Anchors
Hakeem Alshawabkeh
02/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/17/2026
Objection resolved — Addressed
01/13/2026
Filed — Alteration
Roof Drain Replacement
B00854685-P2
12/31/2025
Permit issued — Construction Fence
B01266903-I1-FN
12/31/2025
Permit issued — Sidewalk Shed
B01266926-I1-SH
12/31/2025
Permit issued — Supported Scaffold
B01266917-I1-SF
12/26/2025
Objection resolved — Addressed
12/26/2025
Objection resolved — Addressed
12/08/2025
Objection resolved — Addressed
12/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAXIM KORNGOLD
12/02/2025
Objection raised — Other
11/26/2025
Filed — Alteration
Roof Drain Replacement
B00854685-P1
11/03/2025
Filed — Alteration
B01266917-I1
11/03/2025
Filed — Alteration
B01266903-I1
11/03/2025
Filed — Alteration
B01266926-I1
11/03/2025
Objection raised — Other
10/31/2025
Objection raised — Other
10/30/2025
Filed — Alteration
PROVIDE NEW EXHAUST FANS TO ACCOMMODATE NEW & UPGRADED TOILETS, INSTALL NEW OR MODIFY EXISTING DUCTWORK, MODIFY & REPLACE SUPPLY DUCTWORK DISTRUBUTION & FIN TUBE CONVECTORS, PROVIDE SPLIT AC UNIT FOR ELEVATOR, & PROVIDE NEW FSD FOR EXHAUST DUCTWORK.
B00854243-P6
10/28/2025
Special inspection requirement — Insulation placement and R values
10/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
10/28/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
10/28/2025
Special inspection requirement — Air barrier - visual inspection
10/28/2025
Special inspection requirement — Energy Code Compliance Inspections
10/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
10/28/2025
Special inspection requirement — Sprayed fire-resistant materials
10/28/2025
Special inspection requirement — Masonry
10/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/28/2025
Special inspection requirement — Fenestration air leakage
10/23/2025
Filed — Alteration
SOE/PS1K - FOR SUPPORT OF EXCAVATION SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO DOB# B00854243, B01266903 NO CHANGE IN USE,OCCUPANCY OR EGRESS
B01288987-I1
10/21/2025
Special inspection requirement — Masonry
10/21/2025
Special inspection requirement — Post-installed Anchors
10/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
10/21/2025
Special inspection requirement — Energy Code Compliance Inspections
09/11/2025
Violation issued (FDNY_ORDER, closed)
09/11/2025
Violation issued (FDNY_ORDER, closed)
07/07/2025
Violation issued (ECB, open)
Construction
Latest 60 of 178 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY4908/05/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
D.O.E. P.S.1 0303/22/2026
DEPT OF EDUCATION PS 1803/22/2026
DEPT OF EDUCATION PS1 ANN103/22/2026
DOE P.S.1803/22/2026
DEPARTMENT OF EDUCATION 0303/22/2026
DOE - PS 1 ANNEX103/22/2026
DEPARTMENT OF EDUCATION303/22/2026
PS.1 DOE103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
URBAHN ARCHITECTS1001/13/2026
DSENY ENGINEERING SERVICES, PC411/03/2025
SHENOY ENGINEERING, P.C.605/15/2024
JAMES A. CROCKER505/09/2023
ABC ENGINEERING PLLC103/15/2023
NYGB102/08/2023
INFINITY DESIGN CONSULTANT INC111/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PROMINA ENGINEERING P C803/21/2026
DSENY ENGINEERING SERVICES803/21/2026
CONVERSANO ASSOCIATES, INC.2003/21/2026
URBAHN ARCHITECTS803/21/2026
W J PROFESSIONAL EXPEDITING COMPANY203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRANCIS RICHARDSElectrical903/21/2026
LEADING CONSTRUCTION CORPGeneral Contractor707/08/2026
ZARCO CONTRACTING INCGeneral Contractor707/04/2026
METROCITY GROUP,INCPlumbing207/08/2026
EON MECHANICAL INCGeneral Contractor108/05/2026
SAMCO ELECTRIC CORP.Electrical103/22/2026
J&H ELECTRICAL CONT INCElectrical103/22/2026
MAR-SAL PLBG & HTG, INCPlumbing107/08/2026
HIGH VOLT ELEC CORP. OFElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.3171010/23/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedEON MECHANICAL INC08/04/2026
DOB NOWPlumbingPermit IssuedMAR-SAL PLBG & HTG, INC07/06/2026
DOB NOWFoundationPermit IssuedZARCO CONTRACTING INC07/02/2026
DOB NOWGeneral ConstructionPermit IssuedZARCO CONTRACTING INC07/02/2026
DOB NOWStructuralPermit IssuedZARCO CONTRACTING INC07/02/2026
DOB NOWSupport of ExcavationPermit IssuedZARCO CONTRACTING INC03/23/2026
DOB NOWConstruction FencePermit IssuedZARCO CONTRACTING INC12/31/2025
DOB NOWSidewalk ShedPermit IssuedZARCO CONTRACTING INC12/31/2025
DOB NOWSupported ScaffoldPermit IssuedZARCO CONTRACTING INC12/31/2025
DOB NOWGeneral ConstructionSigned-offLEADING CONSTRUCTION CORP07/09/2024
DOB NOWPlumbingSigned-offMETROCITY GROUP,INC02/15/2024
DOB NOWGeneral ConstructionSigned-offLEADING CONSTRUCTION CORP06/05/2023
DOB NOWPlumbingSigned-offMETROCITY GROUP,INC06/05/2023
DOB NOWGeneral ConstructionSigned-offLEADING CONSTRUCTION CORP05/25/2023
DOB NOWConstruction FenceSigned-offLEADING CONSTRUCTION CORP01/17/2023
BISOTISSUEDNYC SCHOOL CONSTRUCTION AUTHORIT04/29/2020
BISOTISSUEDROCON CORP03/15/2019
BISPLISSUEDROCON CORP03/15/2019
BISOTISSUEDROCON CORP03/15/2019
BISMHISSUEDROCON CORP03/15/2019
BISMHISSUEDSAM'S TECHNICAL SERVICES08/23/2018
BISPLISSUEDROCON CORP03/22/2018
BISMHISSUEDROCON CORP03/22/2018
BISOTISSUEDROCON CORP03/22/2018
BISOTISSUEDROCON CORP03/22/2018
BISOTISSUEDWHITESTONE CONSTRUCTION CORP04/03/2017
BISOTISSUEDWHITESTONE CONSTRUCTION CORP04/03/2017
BISMHISSUEDROCON CORP03/17/2017
BISOTISSUEDROCON CORP03/17/2017
BISOTISSUEDROCON CORP03/17/2017
BISOTISSUEDROCON CORP03/07/2017
BISMHISSUEDROCON CORP03/07/2017
BISOTISSUEDROCON CORP03/07/2017
BISOTISSUEDROCON CORP03/07/2017
BISEQISSUEDPOSILLICO ENVIRONMENTAL I08/16/2016
BISPLISSUEDROCON CORP07/01/2016
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/28/2016
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/28/2016
BISOTISSUEDROCON CORP03/08/2016
BISMHISSUEDROCON CORP03/08/2016
+ 25 more permits on file
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/01/2025Pass-Final General Construction Non-Directive 14PassView ↗
12/18/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 99
DateRequirementInspectorRole
03/09/2026MasonryMAXIM KORNGOLDspecial
03/09/2026Fenestration and door U-factor and product ratingsMAXIM KORNGOLDenergy_progress
03/09/2026Insulation placement and R valuesMAXIM KORNGOLDenergy_progress
03/09/2026Fenestration air leakageMAXIM KORNGOLDenergy_progress
03/09/2026Air barrier - visual inspectionMAXIM KORNGOLDenergy_progress
03/09/2026Fire-Resistance Rated ConstructionMAXIM KORNGOLDprogress
03/09/2026Energy Code Compliance InspectionsMAXIM KORNGOLDprogress
03/09/2026Sprayed fire-resistant materialsMAXIM KORNGOLDspecial
03/09/2026Structural Stability – Alterations of existing buildingsMAXIM KORNGOLDspecial
03/09/2026Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
02/23/2026Insulation placement and R valuesHakeem Alshawabkehenergy_progress
02/23/2026Energy Code Compliance InspectionsHakeem Alshawabkehprogress
02/23/2026Post-installed AnchorsHakeem Alshawabkehspecial
02/23/2026Structural Stability – Alterations of existing buildingsHakeem Alshawabkehspecial
02/23/2026MasonryHakeem Alshawabkehspecial
12/08/2025Structural Stability – Alterations of existing buildingsMAXIM KORNGOLDspecial
10/28/2025Sprayed fire-resistant materials—special
10/28/2025Energy Code Compliance Inspections—progress
10/28/2025Air barrier - visual inspection—energy_progress
10/28/2025Fenestration and door U-factor and product ratings—energy_progress
10/28/2025Insulation placement and R values—energy_progress
10/28/2025Fenestration air leakage—energy_progress
10/28/2025Fire-Resistance Rated Construction—progress
10/28/2025Fire-Resistant Penetrations and Joints—special
10/28/2025Masonry—special
Latest 25 of 99.
▾Documents — 208 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch28
08/31/2026B00672791-S3Request digital key ↗
08/31/2026B00672791-P2Request digital key ↗
08/31/2026B00672791-P1Request digital key ↗
Showing 3 of 28 on file for this type
▸Seals & Professional Certifications68
▸DOB NOWDPL-1: Design Professional Seal & Signature29
08/31/2026B00672791-S3Open ↗
08/31/2026B00672791-P2Open ↗
08/31/2026B00672791-P1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
09/01/2026B00854243-S2Open ↗
08/30/2026B00854243-S1Open ↗
08/30/2026B00854243-S1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026B00854243-S2Open ↗
09/01/2026B00854243-S2Open ↗
08/30/2026B00854243-S1Open ↗
Showing 3 of 15 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWNYCSCA - Approved Site Safety Plans4
08/13/2026B01266926-I1Open ↗
Showing 1 of 4 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/31/2026B00672791-S2Open ↗
08/31/2026B00672791-S3Open ↗
08/31/2026B00672791-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/27/2026B00854685-I1Open ↗
08/13/2026B00854685-S3Open ↗
▸Approvals, Objections & Sign-offs67
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter29
08/31/2026B00672791-S3Open ↗
08/31/2026B00672791-P2Open ↗
08/31/2026B00672791-P1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)27
08/27/2026B00854685-I1Open ↗
08/27/2026B00854685-S3Open ↗
08/27/2026B00854243-S5Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)8
08/13/2026B00672791-S3Open ↗
08/13/2026B00854243-S3Open ↗
08/13/2026B00854243-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/27/2026B00854243-S3Open ↗
08/27/2026B00854243-I1Open ↗
08/15/2026B00854243-S2Open ↗
▸Other Documents34
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal27
08/27/2026B00854685-S3Open ↗
08/27/2026B00854685-I1Open ↗
08/27/2026B00854243-P2Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWNYCSCA Exhibit 24
08/13/2026B00672791-S2Open ↗
08/13/2026B08027116-I1Open ↗
08/13/2026B00672791-S3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00821068-I1Open ↗
08/13/2026B01288987-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00854243-S1Open ↗