← Back
BuildNYC
Two family frame
334 BETHEL AVENUE
STATEN ISLAND · BIN 5175346
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3AZoning
2,438 sfGross Floor Area
2Units
Two family frame · 7,519 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Floor 28p · 3 filings · 20 docs
Floor 142p · 3 filings · 20 docs
Basement5p · 3 filings · 20 docs
Sub-Basement3p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Sasnak Construction103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joseph M. Morace, A.I.A., Architect609/22/2023
C&P Design Consultants204/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Patricia L Gass1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Steadfast ConstructionGeneral Contractor707/08/2026
Flow-Right Plumbing & HeatingPlumbing207/08/2026
Flow-Right Fire SupplyFire Protection107/08/2026
Quality PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA Planning & Expediting5677509/22/2023
Building Lifecycle
10/11/2023
Permit expired, never signed off — Foundation
The city's record still shows this permit as issued, with no sign-off on its filing
S00639877-I1-GC-CX
09/29/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM MONTAGUE
09/29/2023
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM MONTAGUE
09/29/2023
Special inspection requirement — Footing and Foundation
WILLIAM MONTAGUE
09/29/2023
Special inspection requirement — Structural Wood Frame
WILLIAM MONTAGUE
61 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offSteadfast Construction06/01/2023
DOB NOWFoundationPermit IssuedSteadfast Construction10/11/2022
DOB NOWSprinklersSigned-offFlow-Right Fire Supply10/05/2022
DOB NOWPlumbingSigned-offQuality Plumbing08/31/2022
DOB NOWPlumbingSigned-offFlow-Right Plumbing & Heating08/10/2022
DOB NOWPlumbingSigned-offFlow-Right Plumbing & Heating08/09/2022
DOB NOWStructuralPermit IssuedSteadfast Construction07/20/2022
1 project · most recent 09/22/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/22/2023Signed-offFlow-Right Plumbing & HeatingGas, Storm, Water/Sanitary
1 project · most recent 09/08/2022
General Wiring
FiledStatusContractorScope
09/08/2022CompleteJ.P.E. Electrical ContractorsGeneral Wiring
1 project · most recent 09/22/2023
Concrete Wood
FiledStatusContractorScope
09/22/2023Signed-offSteadfast ConstructionConcrete, Wood
1 project · most recent 09/22/2023
Earthwork
FiledStatusContractorScope
09/22/2023Signed-offSteadfast ConstructionEarthwork
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/12/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
04/18/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/13/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
11/16/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/14/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/13/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/16/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
09/29/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM MONTAGUEspecial
09/29/2023Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
09/29/2023Footing and FoundationWILLIAM MONTAGUEprogress
09/29/2023Structural Wood FrameWILLIAM MONTAGUEprogress
09/29/2023Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
09/29/2023Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
09/29/2023FinalWILLIAM MONTAGUEprogress
09/29/2023Interior lighting powerWILLIAM MONTAGUEenergy_progress
09/29/2023Electric vehicle service equipment requirementsWILLIAM MONTAGUEenergy_progress
09/29/2023Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
09/29/2023Ventilation and air distribution systemWILLIAM MONTAGUEenergy_progress
09/29/2023Protection of exposed foundation insulationWILLIAM MONTAGUEenergy_progress
09/29/2023Air barrier - visual inspectionWILLIAM MONTAGUEenergy_progress
09/29/2023Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
09/29/2023HVAC-R and service water heating system controlsWILLIAM MONTAGUEenergy_progress
09/29/2023Duct leakage testing, insulation and designWILLIAM MONTAGUEenergy_progress
09/29/2023FireplacesWILLIAM MONTAGUEenergy_progress
09/29/2023Fenestration air leakageWILLIAM MONTAGUEenergy_progress
09/29/2023HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
09/29/2023Air barrier — testing WILLIAM MONTAGUEenergy_progress
09/29/2023Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
09/29/2023Maintenance informationWILLIAM MONTAGUEenergy_progress
09/29/2023Permanent certificateWILLIAM MONTAGUEenergy_progress
09/29/2023HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
09/29/2023Exterior Insulation and Finish Systems (EIFS)WILLIAM MONTAGUEspecial
Latest 25 of 60.
87 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account