← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Baez Place
334 EAST 176TH STREET · BIN 2826970
💬 Discuss this project
2022Year Built
9Stories
D1Building Class
R7-1Zoning
127,574 sfGross Floor Area
154Units
LL97 Covered0 Active Violations
Elevator apt, semi-fireproof without stores · Owner of record: Community Access Housing Development Fun D Company · 2,003 sf lot · 63.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsCommunity Access, INC.6 filings
RoofCommunity Access, INC.1p · 2 filings
BulkheadCommunity Access, INC.1p · 1 filing · 8 docs
CellarCommunity Access, INC.1p · 1 filing
Sub-CellarCommunity Access, INC.1 filing
Site & exteriorCommunity Access, INC.7 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Community Access14307/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design 21473003/21/2026
Patuxent Engineering603/21/2026
VCD603/21/2026
A1 Expediting Service403/21/2026
BMB Building Consulting2603/21/2026
Sandeep Kaur503/21/2026
Lombardo Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Joy ConstructionGeneral Contractor3007/08/2026
Smart Plumbing & HeatingPlumbing807/08/2026
HF Group Plumbing & SpnklerFire Protection807/08/2026
BLZ ElectricGeneral Contractor503/22/2026
4 Brothers & Sons FenceScaffold504/09/2026
Key Civil Engineering PGeneral Contractor303/22/2026
Parsons ConstructionScaffold303/21/2026
J.k.construction New YorkScaffold203/21/2026
P Goom Hoists ServicesScaffold204/09/2026
Woodhaven MasonScaffold204/09/2026
High Quality Electric ofElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Vibranalysis Inc., Dba VT68641707/21/2025
Mueser Rutledge Consulting977502/28/2025
Building Lifecycle
All (170)Filed (42)Permit Issued (1)Signed Off (16)Inspection (1)Objection (80)Special Inspection (30)
03/11/2026
Signed off — Alteration
FILING HEREWITH PLUMBING WORK IN CONJINCTION WITH NEW BUILDING APPLICATION NUMBER 210182041.
X00476793-I1
02/18/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE ON SIDEWALK/ROADWAY.
X00703441-I1
02/18/2026
Signed off — Alteration
INSTALLATION OF SINGLE PERSONNEL/MATERIAL HOIST IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
X00897482-I1
01/27/2026
Signed off — Alteration
HEREWITH FILING APPLICATION TO INSTALL SCAFFOLDING AS PER PLANS.
X01015701-I1
01/08/2026
Signed off — Alteration
FILING HEREWITH BOILER IN CONJUNCTION WITH NEW BUILDING AS PER PLANS.
X00494812-I1
12/11/2025
Filed — Alteration
FILING HEREWITH PLUMBING WORK IN CONJINCTION WITH NEW BUILDING APPLICATION NUMBER 210182041.
X00476793-P7
12/04/2025
Signed off — Alteration
FILING HEREWITH STRUCTURAL WORK IN CONJUNCTION WITH NEW BUILDING 210182041 AS PER PLANS.
X00502531-I1
11/07/2025
Signed off — Alteration
FILING HEREWITH MECHANICAL WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION #210182041..
X00478660-I1
11/07/2025
Signed off — Alteration
FILING HEREWITH BOILER IN CONJUNCTION WITH NEW BUILDING AS PER PLANS.
X00494812-S1
10/09/2025
Signed off — Alteration
FILING HEREWITH INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEM IN CONJUNCTION WITH NEW BUILDING AS PER PLANS.
X00482748-I1
08/21/2025
Filed — Alteration
FILING HEREWITH PLUMBING WORK IN CONJINCTION WITH NEW BUILDING APPLICATION NUMBER 210182041.
X00476793-P6
08/08/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/08/2025
Special inspection requirement — Structural Cold-Formed Steel
JUAN GOMEZ
08/08/2025
Special inspection requirement — Structural Steel - Welding
JUAN GOMEZ
08/08/2025
Special inspection requirement — Post-installed Anchors
JUAN GOMEZ
08/08/2025
Special inspection requirement — Concrete - Cast-In-Place
JUAN GOMEZ
08/08/2025
Special inspection requirement — Sprayed fire-resistant materials
JUAN GOMEZ
08/08/2025
Special inspection requirement — Structural Steel - High Strength Bolting
JUAN GOMEZ
08/08/2025
Special inspection requirement — Final
JUAN GOMEZ
08/08/2025
Special inspection requirement — Masonry
JUAN GOMEZ
08/08/2025
Special inspection requirement — Concrete - Precast
JUAN GOMEZ
08/08/2025
Special inspection requirement — Structural Steel - Details
JUAN GOMEZ
07/29/2025
Special inspection requirement — Maintenance information
JUAN GOMEZ
07/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
JUAN GOMEZ
07/29/2025
Special inspection requirement — Heating Systems
JUAN GOMEZ
07/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
JUAN GOMEZ
07/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JUAN GOMEZ
07/25/2025
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
X00962873-I1
07/21/2025
Filed — Alteration
FILING HEREWITH BOILER IN CONJUNCTION WITH NEW BUILDING AS PER PLANS.
X00494812-P3
07/18/2025
Signed off — Alteration
X00569269-I1
07/18/2025
Signed off — Alteration
FILING HEREWITH FOUNDATION WORK IN CONJUNCTION WITH NEW BUILDING AS PER PLANS.
X00535497-I1
07/18/2025
Special inspection requirement — Heating Systems
JUAN GOMEZ
07/18/2025
Special inspection requirement — Maintenance information
JUAN GOMEZ
07/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
JUAN GOMEZ
07/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
JUAN GOMEZ
07/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JUAN GOMEZ
07/17/2025
Objection resolved — Addressed
07/16/2025
Permit issued — Boiler Equipment
X00494812-S1-BE
07/14/2025
Objection raised — Other
07/01/2025
Signed off — Alteration
FILING HEREWITH TEMPORARY STANDPIPE AND PRESSURIZATION ALARM AS PER PLANS. ALL WORK DONE IN CONJUNCTION WITH NEW BUILDING 210182041.
X00696315-I1
06/30/2025
Filed — Alteration
FILING HEREWITH PLUMBING WORK IN CONJINCTION WITH NEW BUILDING APPLICATION NUMBER 210182041.
X00476793-P5
06/25/2025
Signed off — Alteration
FILING HEREWITH PLUMBING WORK FOR INSTALLATION OF STORMWATER DETENTION TANK WITH ASSOCIATED PIPING, INLETS AND A COMBINED SEWER CONNECTION & SEPARATE SANITARY CONNECTION FOR A PROPOSED 8-STORY APARTMENT BUILDING.
X00569264-I1
06/25/2025
Objection resolved — Addressed
06/23/2025
Filed — Alteration
FILING HEREWITH STRUCTURAL WORK IN CONJUNCTION WITH NEW BUILDING 210182041 AS PER PLANS.
X00502531-P1
06/17/2025
Special inspection requirement — Structural Steel - High Strength Bolting
JUAN GOMEZ
06/17/2025
Special inspection requirement — Sprayed fire-resistant materials
JUAN GOMEZ
06/17/2025
Special inspection requirement — Post-installed Anchors
JUAN GOMEZ
06/17/2025
Special inspection requirement — Structural Cold-Formed Steel
JUAN GOMEZ
06/17/2025
Special inspection requirement — Masonry
JUAN GOMEZ
06/17/2025
Special inspection requirement — Structural Steel - Details
JUAN GOMEZ
06/17/2025
Special inspection requirement — Concrete - Cast-In-Place
JUAN GOMEZ
06/17/2025
Special inspection requirement — Concrete - Precast
JUAN GOMEZ
06/17/2025
Special inspection requirement — Structural Steel - Welding
JUAN GOMEZ
06/17/2025
Special inspection requirement — Final
JUAN GOMEZ
04/18/2025
Filed — Alteration
FILING HEREWITH PLUMBING WORK IN CONJINCTION WITH NEW BUILDING APPLICATION NUMBER 210182041.
X00476793-P4
04/09/2025
Objection raised — Other
04/07/2025
Filed — Alteration
FILING HEREWITH BOILER IN CONJUNCTION WITH NEW BUILDING AS PER PLANS.
X00494812-P2
04/02/2025
Filed — Alteration
FILING HEREWITH BOILER IN CONJUNCTION WITH NEW BUILDING AS PER PLANS.
X00494812-S1
04/02/2025
Filed — Alteration
FILING HEREWITH INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEM IN CONJUNCTION WITH NEW BUILDING AS PER PLANS.
X00482748-P1
04/02/2025
Filed — Alteration
FILING HEREWITH PLUMBING WORK IN CONJINCTION WITH NEW BUILDING APPLICATION NUMBER 210182041.
X00476793-P3
Latest 60 of 170 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offSmart Plumbing & Heating07/16/2025
BIS—ISSUEDJoy Construction02/10/2025
BIS—ISSUEDJoy Construction10/31/2024
BIS—ISSUEDJoy Construction07/17/2024
BIS—ISSUEDJoy Construction08/22/2023
BIS—ISSUEDJoy Construction08/22/2023
BIS—ISSUEDJoy Construction05/01/2023
BIS—ISSUEDJoy Construction05/01/2023
BIS—ISSUEDJoy Construction12/28/2022
BIS—ISSUEDJoy Construction12/28/2022
BIS—ISSUEDJoy Construction12/12/2022
BIS—ISSUEDJoy Construction12/12/2022
BIS—ISSUEDJoy Construction08/23/2022
BIS—ISSUEDJoy Construction08/23/2022
BIS—ISSUEDJoy Construction04/27/2022
BIS—ISSUEDJoy Construction04/27/2022
5 projects · most recent 06/09/2026
General Wiring
FiledStatusContractorScope
06/09/2026CompleteTuxedo Electrical Contracting—
01/13/2026CompleteBLZ Electric—
08/18/2025CompleteBLZ ElectricGeneral Wiring
02/16/2024CompleteMartin Dorkin—
02/08/2024CompleteHigh Quality Electric of—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/08/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 75
DateRequirementInspectorRole
08/08/2025Structural Steel - High Strength BoltingJUAN GOMEZspecial
08/08/2025FinalJUAN GOMEZprogress
08/08/2025Concrete - PrecastJUAN GOMEZspecial
08/08/2025Structural Steel - DetailsJUAN GOMEZspecial
08/08/2025MasonryJUAN GOMEZspecial
08/08/2025Structural Steel - WeldingJUAN GOMEZspecial
08/08/2025Concrete - Cast-In-PlaceJUAN GOMEZspecial
08/08/2025Structural Cold-Formed SteelJUAN GOMEZspecial
08/08/2025Sprayed fire-resistant materialsJUAN GOMEZspecial
08/08/2025Post-installed AnchorsJUAN GOMEZspecial
07/29/2025HVAC-R and service water piping design and insulationJUAN GOMEZenergy_progress
07/29/2025Heating SystemsJUAN GOMEZspecial
07/29/2025HVAC-R and service water heating equipmentJUAN GOMEZenergy_progress
07/29/2025Maintenance informationJUAN GOMEZenergy_progress
07/29/2025HVAC-R and service water heating system controlsJUAN GOMEZenergy_progress
07/18/2025Maintenance informationJUAN GOMEZenergy_progress
07/18/2025HVAC-R and service water piping design and insulationJUAN GOMEZenergy_progress
07/18/2025HVAC-R and service water heating system controlsJUAN GOMEZenergy_progress
07/18/2025Heating SystemsJUAN GOMEZspecial
07/18/2025HVAC-R and service water heating equipmentJUAN GOMEZenergy_progress
06/17/2025MasonryJUAN GOMEZspecial
06/17/2025Structural Steel - WeldingJUAN GOMEZspecial
06/17/2025Structural Steel - High Strength BoltingJUAN GOMEZspecial
06/17/2025Structural Steel - DetailsJUAN GOMEZspecial
06/17/2025Structural Cold-Formed SteelJUAN GOMEZspecial
Latest 25 of 75.
▾Documents — 182 on file (BIS + DOB NOW)
▸Plans & Drawings42
▸DOB NOWPlans/Sketch34
08/25/2026X00478660-I1Request digital key ↗
08/25/2026X00494812-P3Request digital key ↗
08/25/2026X00494812-P2Request digital key ↗
Showing 3 of 34 on file for this type
▸DOB NOWPlans/Sketch - Plumbing8
08/19/2026X00476793-P4Request digital key ↗
08/19/2026X00476793-P6Request digital key ↗
08/19/2026X00476793-P5Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
04/01/2025240304247Open ↗
03/24/2025240304247Open ↗
06/24/2024240304247Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
04/07/2025240304247Open ↗
09/13/2022240304247Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
06/11/2021240304247Open ↗
▸Seals & Professional Certifications106
▸DOB NOWSpecial Inspector Seal & Signature43
09/05/2026X00502531-P1Open ↗
09/05/2026X00502531-P1Open ↗
09/05/2026X00502531-P1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature41
08/25/2026X00478660-I1Open ↗
08/25/2026X00494812-P2Open ↗
08/25/2026X00494812-I1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
09/05/2026X00502531-P1Open ↗
09/02/2026X00478660-I1Open ↗
09/02/2026X00478660-I1Open ↗
Showing 3 of 21 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/11/2021240304247Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
06/27/2024240304247Open ↗
09/13/2022240304247Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
05/23/2022240304247Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00478660-I1Open ↗
08/13/2026X00494812-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00494812-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWTR5 Test Report1
08/13/2026X00535497-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/21/2026X00962873-P1Open ↗
08/21/2026X00962873-I1Open ↗
08/21/2026X00962873-P4Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
04/07/2025240304247Open ↗
06/27/2024240304247Open ↗
09/13/2022240304247Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/11/2021240304247Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/13/2022240304247Open ↗
▸Other Documents10
▸BISBPP - SUPPORTING DOCUMENTATION4
04/08/2025240304247Open ↗
04/07/2025240304247Open ↗
03/18/2025240304247Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
07/15/2022240304247Open ↗
07/15/2022240304247Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026X00569269-I1Open ↗
08/13/2026X00516229-I1Open ↗
▸DOB NOWCalculations1
08/13/2026X01074983-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01074983-I1Open ↗