← Back
BuildNYC
Elevator apt, fireproof without stores
Fort Independence Houses
3340 BAILEY AVENUE · BIN 2086835
💬 Discuss this project
1975Year Built
21Stories
D3Building Class
R6Zoning
376,185 sfGross Floor Area
344Units
LL97 CoveredRent Stabilized21 Active Violations 1 likely answered ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 139,150 sf lot · 2.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsTenant-in-place roof replacementUnder Construction1 filing
RoofSuspended scaffold for facade repair1p · 1 filing · 15 docs
Floor 2Heating, Ventilation, and Air Conditioning System2p · 1 filing
Floor 1
CellarHeating, Ventilation, and Air Conditioning System1p · 1 filing
Site & exteriorNew York City Housing AuthorityUnder Construction2 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority7610/04/2026
NYC Department of Housing Preservation and Development203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ame Services110/20/2026
PCS Engineering309/28/2026
Aufgang Architects1109/24/2026
Robert Germain Jr. PE1108/25/2026
Wellworth Consulting107/29/2025
Lighthouse101/31/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
W J Professional Expediting1803/21/2026
Rigging Consultants403/21/2026
United Safety Consultants103/21/2026
CB Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold408/14/2026
Nee ElectricalElectrical403/21/2026
Chateau GCGeneral Contractor307/08/2026
P.H. WorksPlumbing307/11/2026
Leardon Boiler Worksspecialty_contractor306/02/2026
Tuxedo Electrical ContractingElectrical203/22/2026
KNS Building RestorationGeneral Contractor204/09/2026
C.G.S. Electrical ContractingElectrical103/21/2026
Shelby ElectricalElectrical103/21/2026
Tuxedo Electrical ContractingElectrical103/21/2026
SNS OrgnizationGeneral Contractor107/08/2026
Thorn ElectricElectrical103/21/2026
M. Bhuiyan Construction CoScaffold107/08/2026
Elmac ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PCS Engineering3745309/28/2026
Metric Consulting and Ins1803709/24/2026
Robert F. Germain Jr. PE51001108/25/2026
Building Lifecycle
All (157)Filed (28)Permit Issued (20)Signed Off (3)Facade (FISP) (12)Violation (60)Inspection (4)Special Inspection (30)
10/20/2026
Filed — Alteration
Installation of suspended scaffolding
X01475450-I1
10/20/2026
Permit issued — Suspended Scaffold
X01475450-I1-SC
09/28/2026
Filed — Alteration
Suspended Scaffold for Facade Restoration as Shown on Plans
X01288822-P2
09/24/2026
Signed off — Alteration
REPLACEMENT (2) NEW HOT WATER LOW PRESSURE BOILERS. REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
X01193164-S2
09/24/2026
Filed — Alteration
Tenant-in-place facade recover over existing to remain. No change in egress, use, zoning, or occupancy.
X01047027-P4
09/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/22/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
09/22/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
09/22/2026
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
09/10/2026
Signed off — Alteration
REPLACEMENT (2) NEW HOT WATER LOW PRESSURE BOILERS. REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
X01193164-S1
09/10/2026
Signed off — Alteration
REPLACEMENT (2) NEW HOT WATER LOW PRESSURE BOILERS. REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
X01193164-I1
08/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
08/26/2026
Special inspection requirement — Chimneys and vents
08/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/26/2026
Special inspection requirement — Final
Robert Germain Jr.
08/25/2026
Filed — Alteration
REPLACEMENT (2) NEW HOT WATER LOW PRESSURE BOILERS. REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
X01193164-P7
08/25/2026
Filed — Alteration
REPLACEMENT (2) NEW HOT WATER LOW PRESSURE BOILERS. REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
X01193164-P8
08/25/2026
Special inspection requirement — Chimneys and vents
08/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
08/25/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
08/25/2026
Special inspection requirement — Final
Robert Germain Jr.
08/25/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/14/2026
Inspection — Pass PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/13/2026
Permit issued — Sidewalk Shed
X01228232-I1-SH
08/11/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/06/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
Robert Germain Jr.
08/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Germain Jr.
08/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
Robert Germain Jr.
08/06/2026
Special inspection requirement — Maintenance information
Robert Germain Jr.
08/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
08/03/2026
Filed — Alteration
REPLACEMENT (2) NEW HOT WATER LOW PRESSURE BOILERS. REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
X01193164-P6
08/03/2026
Filed — Alteration
REPLACEMENT (2) NEW HOT WATER LOW PRESSURE BOILERS. REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
X01193164-P5
08/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
Robert Germain Jr.
08/03/2026
Special inspection requirement — Chimneys and vents
Robert Germain Jr.
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
08/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Germain Jr.
08/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
Robert Germain Jr.
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
08/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/03/2026
Special inspection requirement — Maintenance information
Robert Germain Jr.
08/03/2026
Special inspection requirement — Final
Robert Germain Jr.
07/27/2026
Filed — Alteration
REPLACEMENT (2) NEW HOT WATER LOW PRESSURE BOILERS. REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
X01193164-P4
07/10/2026
Permit issued — Boiler Equipment
X01193164-S2-BE
07/08/2026
Permit issued — Plumbing
X01193164-S1-PL
07/02/2026
Filed — Alteration
Tenant-in-place facade recover over existing to remain. No change in egress, use, zoning, or occupancy.
X01047027-P3
06/30/2026
Filed — Alteration
REPLACEMENT (2) NEW HOT WATER LOW PRESSURE BOILERS. REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
X01193164-P2
06/30/2026
Filed — Alteration
REPLACEMENT (2) NEW HOT WATER LOW PRESSURE BOILERS. REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
X01193164-P1
06/30/2026
Filed — Alteration
REPLACEMENT (2) NEW HOT WATER LOW PRESSURE BOILERS. REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
X01193164-P3
06/04/2026
Permit issued — General Construction
X01047027-I1-GC
05/21/2026
Permit issued — General Construction
X01047027-S3-GC
05/20/2026
Permit issued — Sidewalk Shed
X01228232-I1-SH
05/10/2026
Violation issued (HPD, closed)
C
04/23/2026
Permit issued — Mechanical Systems
X01047027-S1-MS
03/03/2026
Permit issued — Sidewalk Shed
X01228232-I1-SH
02/12/2026
Violation issued (HPD, closed)
C
Latest 60 of 157 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedYash & B Construction10/20/2026
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding08/13/2026
DOB NOWBoiler EquipmentSigned-offP.H. Works07/10/2026
DOB NOWPlumbingSigned-offP.H. Works07/08/2026
DOB NOWGeneral ConstructionPermit IssuedChateau GC06/04/2026
DOB NOWGeneral ConstructionPermit IssuedChateau GC05/21/2026
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding05/20/2026
DOB NOWMechanical SystemsPermit IssuedSNS Orgnization04/23/2026
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding03/03/2026
DOB NOWGeneral ConstructionSigned-offLeardon Boiler Works02/10/2026
DOB NOWBoiler EquipmentSigned-offLeardon Boiler Works02/10/2026
DOB NOWGeneral ConstructionPermit IssuedKNS Building Rest11/26/2025
DOB NOWGeneral ConstructionPermit IssuedKNS Building Rest10/15/2025
DOB NOWSuspended ScaffoldPermit IssuedKNS Building Restoration09/26/2025
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding07/30/2025
DOB NOWPlumbingSigned-offP.H. Works07/08/2025
DOB NOWBoiler EquipmentSigned-offLeardon Boiler Works06/30/2025
DOB NOWGeneral ConstructionSigned-offLeardon Boiler Works06/30/2025
DOB NOWGeneral ConstructionPermit IssuedChateau GC06/06/2025
DOB NOWConstruction FencePermit IssuedM. Bhuiyan Construction02/04/2019
BISMHISSUEDAwl Industries06/25/2020
BISOTISSUEDAwl Industries06/25/2020
BISOTISSUEDAwl Industries06/25/2020
BISMHISSUEDAwl Industries06/04/2020
BISOTISSUEDAwl Industries06/04/2020
BISOTISSUEDAwl Industries06/04/2020
BISOTISSUEDAAA Windows & Doors02/08/2017
BISEQISSUEDAAA Windows & Doors01/29/2016
BISOTISSUEDAAA Windows & Doors11/24/2015
BISEQISSUEDAAA Windows & Doors10/16/2015
BISEQISSUEDAAA Windows & Doors10/16/2015
BISEQISSUEDAAA Windows & Doors01/20/2015
BISPLISSUEDOlympia Mechanical07/08/2005
BISFSISSUEDWinston Contractiong01/26/2002
BISOTISSUEDWinston Contracting10/24/2001
BISOTISSUEDG&S Mechanical03/28/2001
BISFBISSUEDPeter Agliardo JR03/22/2001
BISPLISSUEDArista Plumbing & Heating03/22/2001
BISOTISSUEDG&S Mechanical11/30/2000
BISPLISSUEDDM Plumbing05/10/1999
+ 9 more permits on file
1 project · most recent 09/24/2026
Generators Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/24/2026Permit IssuedChateau GCGenerators, Heating and Air Conditioning Systems
Heat / Cool
__Junk__ ARNU243TAA4 24,200 BTU · Ahu ×22
Lg ARUM144BTES 16,200 BTU · Vrf Outdoor ×2
Generators
Rehlko 150RE0ZJF 154 kW · Generator ×1
2 projects · most recent 09/24/2026
Water/Sanitary Gas
FiledStatusContractorScope
09/24/2026——Water/Sanitary
08/25/2026Signed-offP.H. WorksGas
8 projects · most recent 04/29/2026
General Wiring
FiledStatusContractorScope
04/29/2026CompleteAccurate ElectricalGeneral Wiring
12/15/2025Permit IssuedShelby ElectricalGeneral Wiring
10/13/2025CompleteTuxedo Electrical Contracting—
10/13/2025CompleteTuxedo Electrical Contracting—
05/15/2025Permit IssuedTop Shelf Electric—
03/04/2022Permit IssuedA.T.J. Electrical Co—
12/03/2021Permit IssuedN.Y.C. Housing AuthorityGeneral Wiring
07/01/2020Permit IssuedEia ElectricGeneral Wiring
1 project · most recent 09/24/2026
FiledStatusContractorScope
09/24/2026Permit IssuedChateau GC1 scope_items
1 project · most recent 07/29/2025
Sidewalk Shed
FiledStatusContractorScope
07/29/2025Permit IssuedSpring ScaffoldingSidewalk Shed
1 project · most recent 09/28/2026
Suspended Scaffold
FiledStatusContractorScope
09/28/2026Permit IssuedKNS Building RestorationSuspended Scaffold
2 projects · most recent 10/20/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
10/20/2026Permit IssuedYash & B ConstructionSuspended Scaffold (SC)
09/28/2026Permit IssuedKNS Building RestorationSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/14/2026Pass PL - Up to 3 Requested FloorsPassView ↗
08/11/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/06/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 105
DateRequirementInspectorRole
09/22/2026FinalSAMI HAJJAR P.Eprogress
09/22/2026Tenant Protection Plan Compliance—special
09/22/2026Mechanical SystemsSAMI HAJJAR P.Especial
09/22/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
08/26/2026Fire-Resistant Penetrations and JointsRobert Germain Jr.special
08/26/2026Tenant Protection Plan Compliance—special
08/26/2026Chimneys and vents—special
08/26/2026FinalRobert Germain Jr.progress
08/25/2026FinalRobert Germain Jr.progress
08/25/2026Fire-Resistant Penetrations and JointsRobert Germain Jr.special
08/25/2026Tenant Protection Plan Compliance—special
08/25/2026Fire-Resistant Penetrations and JointsRobert Germain Jr.special
08/25/2026Chimneys and vents—special
08/25/2026Tenant Protection Plan Compliance—special
08/06/2026HVAC-R and service water heating system controlsRobert Germain Jr.energy_progress
08/06/2026Tenant Protection Plan Compliance—special
08/06/2026Maintenance informationRobert Germain Jr.energy_progress
08/06/2026Fire-Resistant Penetrations and JointsRobert Germain Jr.special
08/06/2026HVAC-R and service water piping design and insulationRobert Germain Jr.energy_progress
08/06/2026HVAC-R and service water heating equipmentRobert Germain Jr.energy_progress
08/03/2026Fire-Resistant Penetrations and JointsRobert Germain Jr.special
08/03/2026HVAC-R and service water heating equipmentRobert Germain Jr.energy_progress
08/03/2026Maintenance informationRobert Germain Jr.energy_progress
08/03/2026HVAC-R and service water piping design and insulationRobert Germain Jr.energy_progress
08/03/2026HVAC-R and service water heating system controlsRobert Germain Jr.energy_progress
Latest 25 of 105.
▾Documents — 326 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch23
08/19/2026X01193164-S1Request digital key ↗
08/19/2026X01193164-P6Request digital key ↗
08/19/2026X01193164-P5Request digital key ↗
Showing 3 of 23 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026X00124055-I1Request digital key ↗
▸Applications & Permits26
▸BISPLAN / WORK APPROVAL APPLICATION16
11/29/2024220696085Open ↗
11/22/2024220696085Open ↗
11/06/2024220696085Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION8
06/04/2020220696085Open ↗
06/04/2020220696085Open ↗
06/04/2020220696085Open ↗
Showing 3 of 8 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION1
12/30/2015240117182Open ↗
▸BISPLACE OF ASSEMBLY1
10/03/2016220553657Open ↗
▸Seals & Professional Certifications115
▸DOB NOWProgress Inspector Seal & Signature37
10/04/2026X01047027-P4Open ↗
09/23/2026X01193164-P8Open ↗
09/01/2026X01047027-S2Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
10/04/2026X01047027-P4Open ↗
08/19/2026X01193164-S1Open ↗
08/19/2026X01193164-P5Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
10/04/2026X01288822-P2Open ↗
10/04/2026X01288822-P2Open ↗
10/04/2026X01047027-P4Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
04/16/2020220696085Open ↗
04/02/2019220696085Open ↗
04/02/2019220696085Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
11/02/2015240117191Open ↗
10/28/2015240117182Open ↗
10/15/2015240117173Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
11/02/2015240117191Open ↗
10/28/2015240117182Open ↗
10/15/2015240117173Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
11/02/2015240117191Open ↗
10/28/2015240117182Open ↗
10/15/2015240117173Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/04/2013220338828Open ↗
▸Trade Schedules & Equipment16
▸BISEQUIPMENT USE PERMITS5
02/11/2025220696085Open ↗
02/11/2025220696085Open ↗
02/11/2025220696085Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
02/11/2025220696085Open ↗
01/07/2025220696085Open ↗
12/17/2024220696085Open ↗
Showing 3 of 5 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT2
02/14/2024220696085Open ↗
02/14/2024220696085Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
02/14/2024220696085Open ↗
02/14/2024220696085Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/25/2023220553657Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
01/10/2018220424832Open ↗
▸Environmental & Asbestos24
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
10/04/2026X01047027-P4Open ↗
08/19/2026X01193164-S1Open ↗
08/19/2026X01193164-P5Open ↗
Showing 3 of 19 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
04/02/2019220696085Open ↗
01/24/2018240117182Open ↗
05/01/2017220424832Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
10/28/2015240117182Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/19/2026X01047027-S3Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/02/2019220696085Open ↗
04/02/2019220696085Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/22/2020220696085Open ↗
05/22/2020220696085Open ↗
▸BIS* HVAC INSULATION AND SEALING2
02/14/2024220696085Open ↗
02/14/2024220696085Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/07/2024220696085Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/18/2024220696085Open ↗
▸BISELECTRIC MOTORS1
02/26/2024220696085Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY11
04/25/2023220553657Open ↗
03/29/2023220553657Open ↗
06/04/2020220696085Open ↗
Showing 3 of 11 on file for this type
▸BISMECHANICAL SYSTEMS1
02/14/2024220696085Open ↗
▸BISPOST-INSTALLED ANCHORS1
02/14/2024220696085Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
01/16/2015240087062Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
02/14/2024220696085Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/18/2024220696085Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
02/14/2024220696085Open ↗
▸Approvals, Objections & Sign-offs55
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter23
10/04/2026X01047027-P4Open ↗
08/19/2026X01193164-P4Open ↗
08/19/2026X01193164-P6Open ↗
Showing 3 of 23 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
11/22/2024220696085Open ↗
04/26/2023220553657Open ↗
03/29/2023220553657Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
02/11/2025220696085Open ↗
01/16/2025220696085Open ↗
04/26/2023220553657Open ↗
Showing 3 of 13 on file for this type
▸BISFLAME SPREAD/FIRE LETTER2
04/26/2023220553657Open ↗
03/29/2023220553657Open ↗
▸BISFINAL2
01/08/2025220696085Open ↗
01/16/2015240087062Open ↗
▸BISSHED LETTER1
01/29/2016240087062Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT7
04/02/2019220696085Open ↗
04/02/2019220696085Open ↗
04/02/2019220696085Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/15/2025220696085Open ↗
▸Filing & Intake Forms16
▸BISEFILING JOB APPLICATION COVER SHEET5
11/02/2015240117191Open ↗
10/28/2015240117182Open ↗
10/15/2015240117173Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET5
04/02/2019220696085Open ↗
04/02/2019220696085Open ↗
04/02/2019220696085Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM5
02/11/2025220696085Open ↗
01/29/2025220696085Open ↗
03/26/2020220696085Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION1
01/06/2025220696085Open ↗
▸Other Documents16
▸DOB NOWManufacturer's Specifications4
10/04/2026X01288822-P2Open ↗
08/18/2026X01288822-P2Open ↗
08/13/2026X01288822-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
10/04/2026X01288822-P2Open ↗
08/18/2026X01288822-P2Open ↗
08/13/2026X01288822-P1Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
04/26/2023220553657Open ↗
03/29/2023220553657Open ↗
06/04/2020220696085Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
04/26/2023220553657Open ↗
03/29/2023220553657Open ↗
▸BISSupporting Document: Fee Exempt1
04/26/2023220553657Open ↗
▸BISPERMANENT CERTIFICATE1
02/26/2024220696085Open ↗
▸BISSupporting Document: Fee Deferment1
03/29/2023220553657Open ↗