← Back
Beach club
3341 COUNTRY CLUB ROAD
BRONX · Pelham Bay-Country Club-City Island · BIN 2097509
💬 Discuss this project
1920Year Built
2Stories
P4Building Class
R2Zoning
3,196 sfGross Floor Area
1Units
0 Open Violations
Beach club · Owner of record: FORDHAM WATERFRONT HOLDINGS, LLC · 52,300 sf lot · 0.06 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalFire ProtectionGeneral
Filed — no permit issued37p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER OF 3341 COUNTRYCLUB103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/13/2019$1.5M—WESTCHESTER COUNTRY CLUB LAND ASSOCIATION, INC. → FORDHAM WATERFRONT HOLDINGS, LLC$469/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
REUTHER BOWEN103/01/2022
KOUZMANOFF BAINTON ARCHITECTS111/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYCCODE403/21/2026
Building Lifecycle
All (53)Filed (2)Violation (14)Objection (18)Special Inspection (19)
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/12/2022
Objection raised — Scope
03/12/2022
Objection raised — Structural
03/12/2022
Objection raised — Scope
03/12/2022
Objection raised — Inspections
03/12/2022
Objection raised — Admin
03/12/2022
Objection raised — Admin
03/12/2022
Objection raised — Structural
03/12/2022
Objection raised — Other
03/01/2022
Filed — Alteration CO
Change of Use from Use Group 4A (Boat House Club) to Use Group 3B (Accessory Equipment Storage and accessory offices to university sailing and rowing club) and associated repair and stabilization of the structure as shown on plans filed herewith.
X00602404-S3
02/11/2022
Objection resolved — Addressed
02/11/2022
Objection resolved — Addressed
02/11/2022
Objection resolved — Addressed
02/11/2022
Special inspection requirement — Final
02/11/2022
Special inspection requirement — Post-installed Anchors
02/11/2022
Special inspection requirement — Subgrade Inspections
02/11/2022
Special inspection requirement — Deep Foundation Elements
02/11/2022
Special inspection requirement — Helical Piles Foundation (BB # 2014-020)
02/11/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
02/11/2022
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
02/11/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/11/2022
Special inspection requirement — Lowest Floor Elevation
02/10/2022
Objection resolved — Addressed
11/27/2021
Objection raised — Structural
11/27/2021
Objection raised — Other
11/27/2021
Objection raised — Zoning
11/27/2021
Objection raised — Zoning
11/27/2021
Objection raised — Fire_Protection
11/27/2021
Objection raised — Structural
11/10/2021
Filed — Alteration CO
Change of Use from Use Group 4A (Boat House Club) to Use Group 3B (Accessory Equipment Storage and accessory offices to university sailing and rowing club) and associated repair and stabilization of the structure as shown on plans filed herewith.
X00602404-I1
10/26/2021
Special inspection requirement — Insulation placement and R values
10/26/2021
Special inspection requirement — Energy Code Compliance Inspections
10/26/2021
Special inspection requirement — Fire-Resistance Rated Construction
10/26/2021
Special inspection requirement — Fenestration air leakage
10/26/2021
Special inspection requirement — Air barrier - visual inspection
10/26/2021
Special inspection requirement — Interior lighting power
10/26/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
10/26/2021
Special inspection requirement — Lighting controls
10/26/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/29/2021
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2001
Violation issued (ECB, closed)
Construction
05/17/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/13/1991
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISMHISSUEDCONTROODED SYSTEM, INC.07/19/1991
2 projects · most recent 08/08/2024
FiledStatusContractorScope
08/08/2024Permit IssuedFOREST ELECTRIC CORP.—
06/07/2021Permit IssuedE-J ELEC. INSTALLATION CO—
1 project · most recent 03/01/2022
Wood
FiledStatusContractorScope
03/01/2022——Wood
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
02/11/2022Final—progress
02/11/2022Post-installed Anchors—special
02/11/2022Subgrade Inspections—special
02/11/2022Deep Foundation Elements—special
02/11/2022Helical Piles Foundation (BB # 2014-020)—special
02/11/2022Subsurface Investigations (Borings/Test Pits)—special
02/11/2022Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
02/11/2022Structural Stability – Alterations of existing buildings—special
02/11/2022Lowest Floor Elevation—progress
10/26/2021Insulation placement and R values—energy_progress
10/26/2021Energy Code Compliance Inspections—progress
10/26/2021Fire-Resistance Rated Construction—progress
10/26/2021Fenestration air leakage—energy_progress
10/26/2021Air barrier - visual inspection—energy_progress
10/26/2021Interior lighting power—energy_progress
10/26/2021Fenestration and door U-factor and product ratings—energy_progress
10/26/2021Lighting controls—energy_progress
10/26/2021Fire-Resistant Penetrations and Joints—special
09/29/2021Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
▾Documents — 6 on file (BIS + DOB NOW)
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
12/21/2018220683259Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/21/2018220683259Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026X00602404-S3Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSCHEDULE A - OCCUPANCY / USE1
12/21/2018220683259Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
12/21/2018220683259Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
12/21/2018220683259Open ↗