Condo, residential unit in elevator building
Senate East Condominium
335 EAST 51ST STREET · BIN 1039682
💬 Discuss this project
1963Year Built
14Stories
R4Building Class
R8BZoning
49,892 sfGross Floor Area
97Units
LL97 CoveredRent Stabilized1 Active Violation 2 old, status unconfirmed ▸FISP: SWARMP
Condo, residential unit in elevator building · Owner of record: The Senate East Condominium · 7,531 sf lot · 6.62 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFacade repairs and railing repairs1 filing · 6 docs
PenthouseFacade repairs and railing repairs1 filing · 6 docs
Floor 12Facade repairs and railing repairs1 filing · 6 docs
Floor 11Facade repairs and railing repairs1 filing · 6 docs
Floor 10Facade repairs and railing repairs1 filing · 6 docs
Floor 9Unit 9D3p · 2 filings · 8 docs
Floor 8Facade repairs and railing repairs1 filing · 6 docs
Floor 7Facade repairs and railing repairs1 filing · 6 docs
Floor 6Facade repairs and railing repairs1 filing · 6 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Unit 1B10p · 3 filings · 17 docs
CellarBoiler and fuel oil grade replacement6p · 1 filing · 20 docs
Site & exteriorTemporary supported scaffold installation4p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Senate East Condominium1303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PCS Engineering110/08/2026
Hlzae108/28/2026
Robert Germain Jr. PE603/04/2026
Pramodray Shah, P.E106/19/2025
Mehdi Ghazi, P.E311/23/2021
Navi Structural Engineering106/06/2018
KZ Engineering104/05/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Advanced Builders Services103/21/2026
Eurocelt Expediting203/21/2026
Ibuild Consulting603/21/2026
Synergy Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Power Direct ElectricElectrical403/21/2026
Splen ConstructionGeneral Contractor303/21/2026
Ceprine ConstructionScaffold207/08/2026
Laura Electrical LightingElectrical203/21/2026
Bell Fuel OilPlumbing106/27/2026
Village P & H NYPlumbing107/08/2026
Laura Electrical LightingElectrical103/22/2026
Guaranteed Home ImprovemeGeneral Contractor104/09/2026
JSB WorksGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PCS Engineering3745110/08/2026
Howard L Zimmerman Architects1712108/28/2026
Robert F. Germain Jr. PE5100603/04/2026
Shahrish Shuvo Engineering8524106/19/2025
Mehdi Ghazi, P.E7129311/23/2021
Building Lifecycle
All (132)Filed (14)Permit Issued (9)Signed Off (8)Facade (FISP) (18)Violation (60)Inspection (4)Special Inspection (19)
10/08/2026
Filed — Alteration
Suspended Scaffold for Facade Restoration and Inspection as Shown on Plans
M01447740-I1
10/08/2026
Permit issued — Suspended Scaffold
M01447740-I1-SC
09/04/2026
Signed off — Alteration
NEW CHIMNEY LINER. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01238149-S1
08/28/2026
Filed — Alteration
FACADE REPAIRS INCLUDING INDIVIDUAL BRICK REPLACEMENT, MORTAR REPOINTING, SEALANT JOINT REPLACEMENT AND RAILING REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01421745-I1
08/06/2026
Signed off — Alteration
NEW CHIMNEY LINER. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01238149-S2
08/06/2026
Signed off — Alteration
NEW CHIMNEY LINER. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01238149-I1
06/25/2026
Cycle 9 facade report submitted
06/24/2026
Cycle 9 facade report signed — SWARMP
06/24/2026
Special inspection requirement — Masonry
Jon Colatrella
06/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
Jon Colatrella
06/24/2026
Special inspection requirement — Final
Jon Colatrella
05/20/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/30/2026
Cycle 9 facade inspection completed
03/05/2026
Special inspection requirement — Final
Robert Germain Jr.
03/05/2026
Special inspection requirement — Chimneys and vents
Robert Germain Jr.
03/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
03/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/05/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Robert Germain Jr.
03/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
03/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
Robert Germain Jr.
03/04/2026
Filed — Alteration
NEW CHIMNEY LINER. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01238149-P2
03/04/2026
Filed — Alteration
NEW CHIMNEY LINER. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01238149-P3
03/04/2026
Filed — Alteration
NEW CHIMNEY LINER. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01238149-P1
03/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/03/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Robert Germain Jr.
03/03/2026
Special inspection requirement — Chimneys and vents
Robert Germain Jr.
03/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
03/03/2026
Special inspection requirement — Final
Robert Germain Jr.
03/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
08/20/2025
Permit issued — Boiler Equipment
M01238149-S2-BE
08/19/2025
Permit issued — Plumbing
M01238149-S1-PL
08/19/2025
Permit issued — General Construction
M01238149-I1-GC
08/11/2025
Signed off — Alteration
M01242954-I1
07/16/2025
Filed — Alteration
NEW CHIMNEY LINER. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01238149-S1
07/16/2025
Filed — Alteration
NEW CHIMNEY LINER. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01238149-S2
07/16/2025
Filed — Alteration
NEW CHIMNEY LINER. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01238149-I1
07/11/2025
Permit issued — General Construction
M01242954-I1-GC
06/19/2025
Filed — Alteration
M01242954-I1
08/28/2023
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00030197-I1
07/26/2023
Violation issued (HPD, closed)
B
07/26/2023
Violation issued (HPD, open)
B
07/26/2023
Violation issued (HPD, closed)
C
07/26/2023
Violation issued (HPD, closed)
C
05/20/2022
Cycle 9 facade report submitted
05/20/2022
Cycle 9 facade report signed — SWARMP
05/19/2022
Cycle 9 facade inspection completed
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/10/2022
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURES AT 1ST FLOOR APT# 1B AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF THE BUILDING.
M00553782-I1
02/08/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/28/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/21/2022
Signed off — Alteration
M00553714-I1
01/19/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
11/23/2021
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES AT 1ST FLOOR APT# 1B AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF THE BUILDING.
M00553782-P1
09/08/2021
Permit issued — Plumbing
M00553782-I1-PL
08/31/2021
Permit issued — General Construction
M00553714-I1-GC
08/07/2021
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES AT 1ST FLOOR APT# 1B AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF THE BUILDING.
M00553782-I1
08/07/2021
Filed — Alteration
M00553714-I1
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 132 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedM & L Signs10/08/2026
DOB NOWBoiler EquipmentSigned-offApproved Oil Co of Brooklyn08/20/2025
DOB NOWPlumbingSigned-offBell Fuel Oil08/19/2025
DOB NOWGeneral ConstructionSigned-offGuaranteed Home Improveme08/19/2025
DOB NOWGeneral ConstructionSigned-offJSB Works07/11/2025
DOB NOWPlumbingSigned-offVillage P & H NY09/08/2021
DOB NOWGeneral ConstructionSigned-offSplen Construction08/31/2021
DOB NOWSidewalk ShedSigned-offCeprine Construction06/07/2018
DOB NOWSupported ScaffoldSigned-offCeprine Construction04/06/2018
BISPLISSUEDT.N.T. Plumbing & Heating04/02/2019
BISOTISSUEDLoft Contracting New York03/29/2019
BISOTISSUEDNext Generation Restoration11/13/2018
BISOTISSUEDTitanium Construction Services05/11/2018
BISOTISSUEDCerina General Contracting04/13/2018
BISPLISSUEDPlumbing NYC02/18/2018
BISOTISSUEDTitanium Construction Services02/12/2018
BISOTISSUEDExcel Builders & Renovato12/06/2016
BISOTISSUEDExcel Builders & Renovato12/06/2016
BISPLISSUEDMacreddin Plumbing & Heating08/11/2016
BISOTISSUEDExcel Builders & Renovato06/13/2016
BISOTISSUEDExcel Builders & Renovato06/10/2016
BISOTISSUEDKay Waterproofing09/28/2011
BISOTISSUEDKay Waterproofing12/15/2010
BISEQISSUEDVertical Scaffold11/10/2010
BISOTISSUEDPaik Holzer Construction04/07/2008
BISOTISSUEDPaik Holzer Construction08/20/2007
BISOTISSUEDDJM Restoration08/04/2003
BISOTISSUEDDJM Restoration05/09/2003
BISEQISSUEDRockledge Scaffold04/28/2003
BISPLISSUEDVitello P & Mechanical12/06/1999
BISOTISSUEDSteadfast Construction07/09/1999
BISOTISSUEDStevemar Construction03/26/1999
BISOTISSUEDStevemar Construction11/19/1998
BISEQISSUEDColgate Scaffolding11/04/1998
BISFBISSUEDR.D. Mortman & Company10/20/1992
BISPLISSUEDNational Mechanical Services Plumbing10/20/1992
1 project · most recent 03/04/2026
Gas
FiledStatusContractorScope
03/04/2026Signed-offBell Fuel OilGas
8 projects · most recent 12/22/2025
General Wiring Boiler Controls
FiledStatusContractorScope
12/22/2025Permit IssuedLaura Electrical LightingBoiler Controls
11/06/2025CompleteLaura Electrical Lighting—
06/17/2025CompletePower Direct ElectricGeneral Wiring
10/15/2021CompleteKJK ElectricGeneral Wiring
06/06/2018CompleteMaximum Electric—
05/31/2018Permit IssuedClairmont Electrical ContractingGeneral Wiring
03/05/2018Permit IssuedA.C. Morgan ElectricGeneral Wiring
02/21/2018Permit IssuedMac Elect'l ContractingGeneral Wiring
1 project · most recent 03/04/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
03/04/2026Signed-offApproved Oil Co of BrooklynTenant Protection Plan 72 Hour
1 project · most recent 10/08/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
10/08/2026Permit IssuedM & L SignsSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/20/2026Pass-Final Boiler Equipment InspectionPassView ↗
02/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
06/24/2026MasonryJon Colatrellaspecial
06/24/2026Tenant Protection Plan ComplianceJon Colatrellaspecial
06/24/2026FinalJon Colatrellaprogress
03/05/2026FinalRobert Germain Jr.progress
03/05/2026Chimneys and ventsRobert Germain Jr.special
03/05/2026Fire-Resistant Penetrations and JointsRobert Germain Jr.special
03/05/2026Tenant Protection Plan Compliance—special
03/05/2026Fuel-Oil Storage and Fuel-Oil Piping SystemsRobert Germain Jr.special
03/05/2026Fire-Resistant Penetrations and JointsRobert Germain Jr.special
03/05/2026Tenant Protection Plan ComplianceRobert Germain Jr.special
03/03/2026Tenant Protection Plan Compliance—special
03/03/2026Tenant Protection Plan Compliance—special
03/03/2026Fuel-Oil Storage and Fuel-Oil Piping SystemsRobert Germain Jr.special
03/03/2026Chimneys and ventsRobert Germain Jr.special
03/03/2026Fire-Resistant Penetrations and JointsRobert Germain Jr.special
03/03/2026FinalRobert Germain Jr.progress
03/03/2026Fire-Resistant Penetrations and JointsRobert Germain Jr.special
11/29/2021Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
06/06/2018FinalHumayun Ahmedprogress
▾Documents — 216 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
10/13/2026M01421745-I1Request digital key ↗
09/06/2026M00030197-I1Request digital key ↗
09/06/2026M00050604-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits26
▸BISWORK PERMIT APPLICATION14
04/03/2019123850396Open ↗
03/29/2019123850396Open ↗
11/13/2018123369023Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
11/08/2019123850396Open ↗
03/18/2019123850396Open ↗
02/26/2019123850396Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications62
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
03/06/2020123850396Open ↗
03/06/2020123850396Open ↗
02/28/2020123850396Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
10/13/2026M01421745-I1Open ↗
10/13/2026M01447740-I1Open ↗
09/06/2026M00030197-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
10/14/2026M01421745-I1Open ↗
10/14/2026M01421745-I1Open ↗
09/02/2026M00553782-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
10/14/2026M01421745-I1Open ↗
08/31/2026M00050604-I1Open ↗
08/25/2026M01238149-P1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/05/2018140723288Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/12/2010120524968Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/12/2010120524968Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING3
02/05/2018140723288Open ↗
01/25/2018140723288Open ↗
01/05/2018140723288Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
11/08/2019123850396Open ↗
02/26/2019123850396Open ↗
04/20/2016122718817Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes4
02/26/2019123850396Open ↗
10/26/2018123369023Open ↗
06/29/2017121233655Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
10/13/2026M01421745-I1Open ↗
09/06/2026M00030197-I1Open ↗
09/03/2026M00553714-I1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
02/26/2019123850396Open ↗
10/26/2018123369023Open ↗
01/18/2018140723288Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/30/2010120482904Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/12/2010120524968Open ↗
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
03/06/2020123850396Open ↗
02/28/2020123850396Open ↗
02/12/2020123850396Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
03/06/2020123850396Open ↗
03/06/2020123850396Open ↗
02/28/2020123850396Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
01/18/2018140723288Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00553714-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/06/2018140723288Open ↗
01/18/2018140723288Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
06/14/2017122718817Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
06/14/2017122718817Open ↗
▸Approvals, Objections & Sign-offs12
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
03/06/2020123850396Open ↗
02/28/2020123850396Open ↗
02/14/2020123850396Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
11/12/2010120524968Open ↗
09/30/2010120482904Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/14/2017122718817Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT14
02/28/2020123850396Open ↗
02/12/2020123850396Open ↗
01/21/2020140723288Open ↗
Showing 3 of 14 on file for this type
▸Filing & Intake Forms24
▸BISBOROUGH INTAKE FORM8
02/28/2020123850396Open ↗
02/14/2020123850396Open ↗
02/12/2020123850396Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION8
03/26/2020140723288Open ↗
11/26/2019123850396Open ↗
03/18/2019123850396Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET7
02/26/2019123850396Open ↗
10/26/2018123369023Open ↗
06/29/2017121233655Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
01/05/2018140723288Open ↗
▸Other Documents10
▸DOB NOWDHCR Document7
09/03/2026M00553782-I1Open ↗
08/13/2026M01238149-P2Open ↗
08/13/2026M01238149-P3Open ↗
Showing 3 of 7 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
04/20/2016122718817Open ↗
▸DOB NOWManufacturer's Specifications1
10/13/2026M01447740-I1Open ↗
▸DOB NOWCalculations1
10/13/2026M01447740-I1Open ↗