← Back
Converted dwellings or rooming house
335 WEST 88 STREET
MANHATTAN · Upper West Side (Central) · BIN 1034008
💬 Discuss this project
1894Year Built
4Stories
C5Building Class
R8Zoning
6,632 sfGross Floor Area
11Units
Rent Stabilized1 Open Violation ▸
Converted dwellings or rooming house · Owner of record: NATALINA REALTY CORP · 2,013 sf lot · 3.29 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 34p · 1 filing · 20 docs
Floor 25p · 1 filing · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NATALINA REALTY503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MDG DESIGN GROUP509/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M-DIS DESIGN GROUP503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FYL GROUP INCGeneral Contractor707/08/2026
CLEAN TECH MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SEAD ENGINEERING PC2665409/21/2022
Building Lifecycle
All (40)Filed (5)Permit Issued (4)Signed Off (2)Violation (4)Inspection (3)Objection (2)Special Inspection (20)
03/04/2026
Signed off — Alteration
HEREWITH FILE TO RENOVATE EXISTING APARTMENT UNIT #3B,#4B. WORK INCLUDES RELOCATE/REPLACE PLUMBING FIXTURES WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00691718-S1
01/29/2026
Signed off — Alteration
HEREWITH FILE TO RENOVATE EXISTING APARTMENT UNIT #3B,#4B. WORK INCLUDES RELOCATE/REPLACE PLUMBING FIXTURES WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00691718-I1
01/29/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/17/2025
Violation issued (HPD, closed)
I
11/15/2023
Violation issued (HPD, closed)
I
01/20/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/09/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/06/2022
Permit issued — Structural
M00691718-I1-GC-CX
09/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
09/26/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
INHWAN CHANG
09/26/2022
Special inspection requirement — Energy Code Compliance Inspections
INHWAN CHANG
09/26/2022
Special inspection requirement — Structural Wood Frame
INHWAN CHANG
09/26/2022
Special inspection requirement — Fire-Resistance Rated Construction
INHWAN CHANG
09/26/2022
Special inspection requirement — Final
YUNHO LEE
09/26/2022
Special inspection requirement — Interior lighting power
INHWAN CHANG
09/26/2022
Special inspection requirement — Lighting controls
INHWAN CHANG
09/26/2022
Special inspection requirement — Lighting in dwelling units
INHWAN CHANG
09/21/2022
Filed — Alteration
HEREWITH FILE TO RENOVATE EXISTING APARTMENT UNIT #3B,#4B. WORK INCLUDES RELOCATE/REPLACE PLUMBING FIXTURES WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00691718-P2
09/19/2022
Filed — Alteration
HEREWITH FILE TO RENOVATE EXISTING APARTMENT UNIT #3B,#4B. WORK INCLUDES RELOCATE/REPLACE PLUMBING FIXTURES WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00691718-P3
09/19/2022
Permit issued — Structural
M00691718-I1-GC-CX
09/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
09/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
09/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
09/15/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
INHWAN CHANG
09/15/2022
Special inspection requirement — Energy Code Compliance Inspections
INHWAN CHANG
09/15/2022
Special inspection requirement — Final
YUNHO LEE
09/15/2022
Special inspection requirement — Fire-Resistance Rated Construction
INHWAN CHANG
09/15/2022
Special inspection requirement — Structural Wood Frame
INHWAN CHANG
09/15/2022
Special inspection requirement — Lighting controls
INHWAN CHANG
09/15/2022
Special inspection requirement — Lighting in dwelling units
INHWAN CHANG
09/15/2022
Special inspection requirement — Interior lighting power
INHWAN CHANG
04/27/2022
Permit issued — Plumbing
M00691718-S1-PL
04/16/2022
Permit issued — Structural
M00691718-I1-GC-CX
04/14/2022
Objection resolved — Addressed
03/30/2022
Objection raised — Inspections
03/28/2022
Filed — Alteration
HEREWITH FILE TO RENOVATE EXISTING APARTMENT UNIT #3B,#4B. WORK INCLUDES RELOCATE/REPLACE PLUMBING FIXTURES WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00691718-P1
03/14/2022
Filed — Alteration
HEREWITH FILE TO RENOVATE EXISTING APARTMENT UNIT #3B,#4B. WORK INCLUDES RELOCATE/REPLACE PLUMBING FIXTURES WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00691718-S1
03/11/2022
Filed — Alteration
HEREWITH FILE TO RENOVATE EXISTING APARTMENT UNIT #3B,#4B. WORK INCLUDES RELOCATE/REPLACE PLUMBING FIXTURES WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00691718-I1
05/04/1998
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offFYL GROUP INC12/06/2022
DOB NOWStructuralSigned-offFYL GROUP INC09/19/2022
DOB NOWPlumbingSigned-offCLEAN TECH MECHANICAL INC04/27/2022
DOB NOWStructuralSigned-offFYL GROUP INC04/16/2022
BISPLISSUEDCOD PLUMBING CORP08/17/2015
BISOTISSUEDBAC GROUP INC08/12/2015
BISBLISSUEDCOD PLUMBING CORP11/21/2006
BISPLISSUEDCOD PLUMBING CORP11/21/2006
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/29/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/09/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
09/26/2022Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
09/26/2022Structural Stability – Alterations of existing buildingsINHWAN CHANGspecial
09/26/2022Energy Code Compliance InspectionsINHWAN CHANGprogress
09/26/2022Structural Wood FrameINHWAN CHANGprogress
09/26/2022Fire-Resistance Rated ConstructionINHWAN CHANGprogress
09/26/2022FinalYUNHO LEEprogress
09/26/2022Interior lighting powerINHWAN CHANGenergy_progress
09/26/2022Lighting controlsINHWAN CHANGenergy_progress
09/26/2022Lighting in dwelling unitsINHWAN CHANGenergy_progress
09/19/2022Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
09/15/2022Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
09/15/2022Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
09/15/2022Structural Stability – Alterations of existing buildingsINHWAN CHANGspecial
09/15/2022Energy Code Compliance InspectionsINHWAN CHANGprogress
09/15/2022FinalYUNHO LEEprogress
09/15/2022Fire-Resistance Rated ConstructionINHWAN CHANGprogress
09/15/2022Structural Wood FrameINHWAN CHANGprogress
09/15/2022Lighting controlsINHWAN CHANGenergy_progress
09/15/2022Lighting in dwelling unitsINHWAN CHANGenergy_progress
09/15/2022Interior lighting powerINHWAN CHANGenergy_progress
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/02/2026M00691718-P3Request digital key ↗
09/02/2026M00691718-I1Request digital key ↗
09/02/2026M00691718-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits8
▸DOB NOWLPC Approval/Permit5
09/02/2026M00691718-I1Open ↗
09/02/2026M00691718-S1Open ↗
08/15/2026M00691718-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
09/22/2015122455235Open ↗
08/27/2015122455235Open ↗
▸BISWORK PERMIT APPLICATION1
08/27/2015122455235Open ↗
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026M00691718-I1Open ↗
09/01/2026M00691718-I1Open ↗
09/01/2026M00691718-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026M00691718-I1Open ↗
09/01/2026M00691718-I1Open ↗
08/31/2026M00691718-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/02/2026M00691718-I1Open ↗
09/02/2026M00691718-S1Open ↗
09/02/2026M00691718-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
09/22/2015122455235Open ↗
08/27/2015122455235Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
02/26/2016122455235Open ↗
02/26/2016122455235Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/27/2015122455235Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/27/2015122455235Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/02/2026M00691718-I1Open ↗
09/02/2026M00691718-S1Open ↗
08/15/2026M00691718-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/27/2015122455235Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/27/2015122455235Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/26/2016122455235Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00691718-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLANDMARKS APPROVAL1
08/27/2015122455235Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/26/2016122455235Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/26/2016122455235Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT2
02/26/2016122455235Open ↗
08/27/2015122455235Open ↗
▸BISHIC LICENSE OR AFFIDAVIT2
11/11/2015122455235Open ↗
08/27/2015122455235Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/27/2015122455235Open ↗